DAWIA Contracting overview

  • 198 practice questions
  • 32 flashcards
  • 5 study guide topics
  • 40 key terms

What you'll study

  • Contract Principles and Planning20%
  • Contract Formation and Award20%
  • Contract Administration and Pricing20%
  • Contract Execution, Modification, and Termination20%
  • Special Contracting Methods and Business Relationships20%

The DAWIA Contracting credential is the professional certification for members of the defense acquisition workforce who work in the contracting functional area. It is built around the standards published for the contracting career field and is intended for acquisition professionals - contract specialists, contract administrators, price/cost analysts working in contracting shops, and the supervisors who develop them - who need to demonstrate breadth across the full contracting lifecycle rather than mastery of a single step. Coverage follows that lifecycle: principles and acquisition planning, formation and award, administration and pricing, execution through modification and termination, and the special methods and business relationships used when standard approaches do not fit. Preparation is normally a mix of structured coursework, self-study of the underlying regulatory and policy material, and on-the-job experience, because the exam-style questions test judgment in realistic scenarios rather than isolated definitions. Candidates should confirm current requirements - course lists, certification standards, and any equivalency options - directly with the official acquisition university's certification standards pages before registering, since program details are revised periodically and third-party summaries go stale. This page is independent study material and is not affiliated with, endorsed by, or sponsored by any government agency or acquisition university. Use it as practice alongside, not instead of, the current official standards.

Common mistakes

Picks the contract type from habit ("we always use firm-fixed-price") without writing down which cost or performance risks are being transferred and to whom.

Memorizing the line "FFP is preferred" (FAR 16.101(b)) is easier than internalizing the factor-by-factor comparison in FAR 16.104, so candidates skip the reasoning step under time pressure.

What to do instead

Practice a three-step drill on every scenario: (1) name the technical, cost, and schedule uncertainty; (2) name which party can best manage each risk; (3) match that profile to a contract-type family, then state the FAR 16.104 factors that support it. The written rationale is the answer, not the label.

Runs market research after the acquisition strategy and contract type are already locked in, and reduces it to a brand-name justification when a sole-source is intended.

Market research is treated as a documentation checkbox rather than the input that drives the strategy; candidates also conflate the brand-name/limited-sources justification (FAR 6.302-1(c)) with a full J&A.

What to do instead

Sequence it correctly: market research first, then strategy, then contract type, then competition approach. Memorize the distinct purposes of the limited-sources justification versus the J&A, and be able to state the market research outcomes that change the strategy.

Rejects or downgrades an otherwise conforming offer because the firm has weak past performance, or accepts a nonconforming offer because the firm is highly capable.

Responsibility and responsiveness are both pass/fail screens applied at roughly the same point in the process, and both use the word "qualified" in casual speech, so they blur together.

What to do instead

Use a two-question test in order: (1) Does the offer conform to the material terms of the solicitation? (responsiveness - a property of the offer). (2) Is this firm capable, adequate, and willing? (responsibility - a property of the firm, FAR 9.1, determined by the CO). Past performance is generally responsibility, not responsiveness.

Accepts a late proposal because the offeror says the courier or email system failed, applying the late-bid logic used in sealed bidding to a negotiated acquisition (or vice versa).

FAR 14.304 and FAR 15.208 both govern late submissions but have different mechanics and narrow, specific exceptions that candidates memorize as one blurry rule.

What to do instead

Build a two-column comparison of FAR 14.304 versus FAR 15.208, listing the exact exceptions (government mishandling or delay, and the electronic-submission rules). When answering, first identify the procedure, then apply only that rule set.

Calls a cost allowable just because the contractor incurred it and it falls within a cost-reimbursement line item.

Allowability, allocability, and reasonableness are taught together and collapse into a single intuition; candidates forget that allowability is a separate gate that contract terms and FAR 31.205 can override.

What to do instead

Run the FAR 31.201-2 test explicitly and in order - reasonableness, allocability, GAAP, contract terms, and the limitations in FAR Part 31 - then scan FAR 31.205 for a selected-cost exclusion. State which prong fails, not just "unallowable."

Builds an equitable adjustment or a negotiated price by adding a flat profit percentage across the whole bottom line, including materials and subcontract pass-throughs.

Candidates default to commercial markup arithmetic instead of the cost-based structure (direct costs, indirect costs applied to their proper bases, then profit on the appropriate elements).

What to do instead

Drill the build-up as separate layers: direct costs by element, indirect rates against their correct bases, then profit as a weighted objective rather than a formula. Flag material and subcontract dollars as a limited profit base, and never apply profit to profit.

Accepts direction to the contractor from a COR, program manager, or inspector as binding, and later tells the contractor there is no basis for adjustment.

Authority is confused with knowledge - the person who knows the most about the requirement is assumed to be able to bind the government, and the Changes clause is read as covering only written CO modifications.

What to do instead

Test every direction twice: does it fall inside the scope of the Changes clause, and did it come from someone with authority? A direction outside the contract from an unauthorized person can still be a constructive change or an unauthorized commitment requiring ratification.

Treats termination for convenience and termination for default as producing similar recoveries, or assumes a defective default automatically becomes a convenience termination once the contractor shows an excusable delay.

The remedies are asymmetric and the conversion is a CO decision, not an automatic operation of law; candidates study the two clauses separately and never contrast them.

What to do instead

Maintain a side-by-side chart: T4D gives no profit on uncompleted work and exposes the contractor to excess reprocurement costs; T4C gives profit on work done plus settlement expenses. Then note that conversion to T4C is a CO determination that must be documented, and that the excusable-delay analysis comes first.

Treats orders under a multiple-award IDIQ as requiring a fresh full-and-open competition under FAR Part 15 instead of applying fair opportunity under FAR 16.505.

The multiple-award vehicle and the standard competitive procedure look alike on the surface, and the exceptions to fair opportunity are a short list that is easy to skip over.

What to do instead

Anchor on the rule: orders exceeding the micro-purchase threshold require fair opportunity among the awardees, with a defined list of exceptions (urgency, only one capable, logical follow-on, etc.) that must be documented. Practice sorting a scenario into "fair opportunity" versus "exception" before writing anything else.

Treats an option as something the contractor can insist on, or exercises it after the option period has expired or without confirming funds are available.

Options are casually described as "renewals," which imports a bilateral, mutual-consent intuition that contradicts the unilateral nature of an option under FAR 17.2.

What to do instead

State the three-part test before choosing an answer: the option is unilateral, it must be exercised strictly within its terms and before expiration, and the CO must have funds and complete any required determination and notice. If any element fails, the option is not exercisable.

Exam requirements can change. Confirm current details with the exam provider.

DAWIA Contracting practice

198 questions. Each one lists the choices, the correct answer, and an explanation. With JavaScript, this list opens one question at a time. The checker at the top of this page saves progress in this browser when it is available.

  1. Question 1Contract Principles and Planning

    The bargained-for exchange of promises or performances that makes an agreement legally enforceable is called:

    1. An offer
    2. Acceptance
    3. Novation
    4. Consideration Correct answer.

    Explanation

    Consideration is the value each party gives up in exchange for the other party's promise; without it a promise is generally unenforceable as a contract. It is what separates a bargain from a gratuitous promise.

  2. Question 2Contract Principles and Planning

    A contractor submits a proposal in response to a negotiated solicitation. In contract-formation terms, that proposal is ordinarily:

    1. a binding contract upon submission
    2. a counteroffer that cancels the solicitation
    3. an acceptance of the government's offer
    4. an offer that the government may accept Correct answer.

    Explanation

    The solicitation is an invitation for offers; the proposal is the offer, and a contract forms only when the government accepts it, typically by written award. Until award the offeror is not bound.

  3. Question 3Contract Principles and Planning

    Which contract type places the greatest cost risk on the contractor?

    1. Cost-plus-fixed-fee
    2. Firm-fixed-price Correct answer.
    3. Time-and-materials
    4. Cost-plus-incentive-fee

    Explanation

    Under a firm-fixed-price contract the contractor receives a set price regardless of the costs actually incurred, so it absorbs any overrun. Cost-reimbursement types shift cost risk to the government, and time-and-materials shares risk through fixed hourly rates.

  4. Question 4Contract Principles and Planning

    The bona fide need rule requires that an obligation be based on:

    1. a need supported by a completed acquisition plan
    2. a need certified by the requiring activity's commander
    3. a need arising within the funds' period of availability Correct answer.
    4. a need that will arise in a future fiscal year

    Explanation

    An appropriation may be obligated only for a need that exists, or will arise in a normal and continuous manner, during that appropriation's period of availability. Buying ahead for a future year's requirement is prohibited stockpiling.

  5. Question 5Contract Principles and Planning

    Full and open competition means that:

    1. the lowest-priced offer is selected for award
    2. all responsible sources may submit offers Correct answer.
    3. the solicitation stays open for at least 30 days
    4. at least three competitive offers are received

    Explanation

    Full and open competition exists when all responsible sources are permitted to compete for the requirement. How many offers arrive, how long the solicitation is open, and which award basis applies are separate questions.

  6. Question 6Contract Principles and Planning

    The micro-purchase threshold, the level at or below which competition requirements are minimal, is generally set at:

    1. $250,000
    2. $3,500
    3. $10,000 Correct answer.
    4. $25,000

    Explanation

    A micro-purchase is an acquisition of supplies or services at or below $10,000 in aggregate, subject to limited statutory exceptions; at that level an agency may buy without soliciting competitive quotations if the price is reasonable. $250,000 is the simplified acquisition threshold.

  7. Question 7Contract Principles and Planning

    Market research is required:

    1. after award, to validate the negotiated price
    2. only above the simplified acquisition threshold
    3. only after a solicitation has been issued
    4. before defining requirements and before soliciting offers Correct answer.

    Explanation

    Market research is performed before developing new requirements documents and before soliciting offers, and it continues as needed to learn what is commercially available and how competitive the market is.

  8. Question 8Contract Principles and Planning

    Who normally prepares the independent government cost estimate (IGCE)?

    1. the prospective offeror
    2. the contract administration office
    3. the requiring activity Correct answer.
    4. the contract audit agency

    Explanation

    The requiring activity prepares the IGCE and furnishes it to the contracting officer for budgeting and price analysis. It is not released to offerors because doing so would compromise the government's negotiating position.

  9. Question 9Contract Principles and Planning

    Sealed bidding is appropriate when:

    1. the requirement is well defined and award will be on price alone Correct answer.
    2. only one responsible source can meet the requirement
    3. the government expects to negotiate technical trade-offs with offerors
    4. the requirement is developmental and offerors may propose different approaches

    Explanation

    Sealed bidding is used when the government's need is clearly describable, award will be made on price and other price-related factors, discussions are not needed, and more than one bid is reasonably expected. It results in a firm-fixed-price contract without negotiations.

  10. Question 10Contract Principles and Planning

    Before awarding a cost-reimbursement contract, the contracting officer must determine that:

    1. the contractor has an adequate accounting system Correct answer.
    2. the requirement is fully defined at the time of award
    3. the contractor will receive a guaranteed minimum fee
    4. competition for the requirement is not available

    Explanation

    Because payment is based on allowable incurred costs, a cost-reimbursement contract may be used only when the contractor's accounting system is adequate and the government can monitor performance and costs effectively. These conditions must be documented before award.

  11. Question 11Contract Principles and Planning

    The government's exercise of a priced option is accomplished by:

    1. a unilateral written notice to the contractor Correct answer.
    2. a supplemental agreement signed by both parties
    3. an oral notice later confirmed in writing
    4. a new contract award

    Explanation

    An option is the government's unilateral right to extend the term or buy additional quantities within stated limits; the contracting officer exercises it by written notice, so no contractor consent or new award is required.

  12. Question 12Contract Principles and Planning

    Under a time-and-materials contract, which risk does the government bear?

    1. That the contractor will fail to meet the delivery schedule
    2. That the fixed hourly rates will rise during performance
    3. That the contractor will perform more hours than expected Correct answer.
    4. That material costs will exceed the ceiling

    Explanation

    A time-and-materials contract pays fixed hourly rates that include profit plus materials at cost, so the government absorbs the risk that more labor hours will be needed than anticipated. That is why a ceiling price and close surveillance are required.

  13. Question 13Contract Principles and Planning

    In an indefinite-delivery/indefinite-quantity contract, the government is obligated to order:

    1. at least the guaranteed minimum quantity Correct answer.
    2. the full estimated quantity
    3. the estimated maximum quantity stated in the schedule
    4. nothing until the first task order is issued

    Explanation

    An IDIQ contract requires the government to order at least a stated minimum quantity and permits orders up to a stated maximum; quantities between the two are not guaranteed. Only the minimum is a binding obligation.

  14. Question 14Contract Principles and Planning

    Performance-based payments are made when:

    1. the contracting officer approves a progress payment request
    2. the contractor submits a public voucher for costs incurred
    3. the contractor reaches the midpoint of the period of performance
    4. the contractor achieves defined performance outcomes or events Correct answer.

    Explanation

    Performance-based payments are financed on accomplishment of defined, measurable performance events, not on costs incurred or the passage of time. They are the preferred financing method when cost-effective and practicable.

  15. Question 15Contract Principles and Planning

    After receiving a written change order that is within the scope of the contract, the contractor must:

    1. perform the work and later request an equitable adjustment Correct answer.
    2. suspend work pending agreement on price
    3. decline the change as beyond the contract's scope
    4. file a protest with the Government Accountability Office

    Explanation

    The changes clause requires the contractor to proceed with the changed work even if price and schedule are unresolved, then submit a request for equitable adjustment within the period stated in the clause. Refusing to perform is not permitted for an in-scope change.

  16. Question 16Contract Principles and Planning

    A constructive change arises when:

    1. the contracting officer issues a signed modification citing the changes clause
    2. the parties agree by mutual consent to reduce the scope of work
    3. government conduct requires extra work without a formal change order Correct answer.
    4. the contractor performs work incorrectly and must rework it

    Explanation

    A constructive change occurs when the government's actions or direction require effort beyond the contract terms without issuing a formal change order, so the contractor is entitled to an equitable adjustment as if one had been issued.

  17. Question 17Contract Principles and Planning

    An unauthorized commitment made by a government employee without authority may be resolved by:

    1. ratification by an official with authority Correct answer.
    2. a decision by the Government Accountability Office
    3. payment under the doctrine of quantum meruit
    4. converting it into a purchase order

    Explanation

    An official with authority to approve the commitment may ratify it after determining that the commitment is a legitimate need, that funds were available, and that the value is fair, which allows the government to pay. Without ratification no payment may be made.

  18. Question 18Contract Principles and Planning

    Consolidating two or more requirements into a single solicitation is permissible when the contracting officer determines that:

    1. the expected benefits outweigh reduced small business opportunities Correct answer.
    2. the requirement is funded by more than one appropriation
    3. the consolidated value exceeds the simplified acquisition threshold
    4. each affected small business concern concurs in writing

    Explanation

    Consolidation must be necessary and justified; the contracting officer documents that the benefits, such as reduced cost or improved management, substantially outweigh any reduction in small business participation.

  19. Question 19Contract Principles and Planning

    In a best-value tradeoff source selection, the agency:

    1. must award to the highest technically rated offer regardless of price
    2. may select a higher-rated offer when benefits justify the premium Correct answer.
    3. may not consider past performance in the tradeoff
    4. must award to the lowest-priced technically acceptable offer

    Explanation

    A tradeoff permits award to a higher-rated, higher-priced offer when the technical superiority is worth the price premium, and the decision must be documented with a rationale. It is not driven solely by price or solely by technical rating.

  20. Question 20Contract Principles and Planning

    An agency uses operation and maintenance funds to buy a mainframe computer that should be capitalized. This is a violation of:

    1. the amount test
    2. the bona fide need test
    3. the purpose test Correct answer.
    4. the time test

    Explanation

    The purpose test requires that an appropriation be used only for the purposes Congress intended; capital equipment must be acquired with procurement appropriations rather than operation and maintenance funds. The other tests address when funds are available, how much may be obligated, and what need may be met.

  21. Question 21Contract Principles and Planning

    A contractor may treat a change order as a cardinal change when:

    1. the contractor disagrees with the price
    2. it alters the work so substantially that it exceeds the scope Correct answer.
    3. it is issued after the period of performance has ended
    4. it increases the contract price by more than 10 percent

    Explanation

    The changes clause authorizes only changes within the general scope of the contract; when directed work is so far beyond that scope that the contract is effectively replaced, the change is cardinal and the contractor may refuse to perform and sue for breach.

  22. Question 22Contract Principles and Planning

    Upon encountering a differing site condition, the contractor must:

    1. await a contracting officer's decision before resuming work
    2. submit a claim within 30 days after final payment
    3. give written notice promptly and before disturbing the conditions Correct answer.
    4. record the condition only in its daily reports

    Explanation

    The Differing Site Conditions clause requires the contractor to notify the contracting officer in writing promptly and before the conditions are disturbed, so the government can investigate the site while the evidence still exists. Failure to give timely notice can reduce or bar recovery.

  23. Question 23Contract Principles and Planning

    Which item is generally recoverable in a termination for convenience settlement?

    1. Anticipated profit on work not performed
    2. Profit on the entire contract value
    3. The full contract price as if the work were complete
    4. Costs incurred for work performed Correct answer.

    Explanation

    A convenience termination compensates the contractor for the work done and costs incurred, plus a reasonable profit on that work and settlement expenses. Profit on work never performed is not allowed, because the contractor is placed in the position it would have occupied had the terminated portion never been awarded.

  24. Question 24Contract Principles and Planning

    Which situation is an organizational conflict of interest?

    1. The firm drafted the specifications it will perform against Correct answer.
    2. The contractor hires a subcontractor for part of the work
    3. The contractor has performed similar work for another agency
    4. The contractor's price exceeds the government estimate

    Explanation

    Organizational conflicts of interest arise when a contractor's other activities or relationships give it an unfair competitive advantage or impair its objectivity. Preparing the specifications on which the firm later competes is the classic biased-ground-rules conflict.

  25. Question 25Contract Principles and Planning

    Under the superior knowledge doctrine, the government may be liable when it:

    1. rejects a nonconforming item during inspection
    2. withholds vital data the contractor could not obtain Correct answer.
    3. furnishes more technical data than was requested
    4. changes the delivery schedule by mutual agreement

    Explanation

    The government must disclose information it possesses that is vital to performance and not reasonably available to the contractor. Withholding such knowledge can support an equitable adjustment or a breach claim.

  26. Question 26Contract Principles and Planning

    Which set of elements is required to form a binding contract between the government and a contractor?

    1. Public announcement and a small-business set-aside review
    2. Legal review and congressional notification
    3. Offer, acceptance, and consideration Correct answer.
    4. Adequate funding and an approved acquisition plan

    Explanation

    A contract requires mutual assent, expressed as a valid offer and acceptance, plus consideration and a lawful purpose; these common-law elements apply to government contracts as well. Internal reviews and funding certifications are procedural prerequisites, not elements of contract formation.

  27. Question 27Contract Principles and Planning

    The rule that an appropriation may be used only for the specific purpose for which Congress made it available is known as:

    1. The Antideficiency Act
    2. The miscellaneous receipts statute
    3. The bona fide need rule
    4. The purpose statute at 31 U.S.C. 1301(a) Correct answer.

    Explanation

    The purpose statute provides that appropriations shall be applied only to the objects for which they were made, unless otherwise provided by law. It is distinct from rules governing the timing of need or the amount of obligations.

  28. Question 28Contract Principles and Planning

    In federal acquisition, full and open competition means that:

    1. Competition is limited to firms that meet the applicable size standard
    2. At least three qualified offerors must submit proposals
    3. Only firms holding schedule contracts are invited to respond
    4. All responsible sources are permitted to submit offers Correct answer.

    Explanation

    Full and open competition exists when all responsible sources are permitted to compete for a contract award. It does not require any particular number of responses, only that no source is improperly excluded.

  29. Question 29Contract Principles and Planning

    Under the bona fide need rule, an appropriation is available to meet a need that:

    1. exists when the appropriation's period of availability expires
    2. the contractor satisfies in the year funds are obligated
    3. was documented in the prior year's budget justification
    4. arises during the period of availability of the appropriation Correct answer.

    Explanation

    The bona fide need rule requires that the need being met exist in the period of availability of the funds used, and that the funds be obligated during that period. It generally restricts the use of expiring funds to buy goods or services for a future period's needs.

  30. Question 30Contract Principles and Planning

    Under a firm-fixed-price contract, which party generally bears the risk of increases in the contractor's labor and material costs?

    1. The government, up to the contract's funding ceiling
    2. The government, through an equitable adjustment
    3. The contractor, unless a clause allows adjustment Correct answer.
    4. Both parties, which share the increase equally by operation of law

    Explanation

    In a firm-fixed-price arrangement the contractor is bound to the stated price and absorbs cost increases unless a specific clause, such as an economic price adjustment or changes clause, provides relief. This allocation of cost risk is the defining feature of the arrangement.

  31. Question 31Contract Principles and Planning

    An economic price adjustment clause in a fixed-price contract is intended to:

    1. Convert the fixed-price contract to a cost-reimbursement contract
    2. Allow the government to reopen the price to reflect the contractor's actual costs
    3. Let the contractor reprice the contract whenever its actual costs exceed the estimate
    4. Adjust the price for contingencies such as specified indexes or labor rates Correct answer.

    Explanation

    An economic price adjustment clause permits upward or downward revision of the price based on an agreed contingency, such as a published index, a market price for a commodity, or a specified labor rate. It preserves the fixed-price character of the contract while limiting exposure to defined economic fluctuations.

  32. Question 32Contract Principles and Planning

    Which statement best describes a performance work statement (PWS)?

    1. It restates the contractor's proposal as the governing statement of work
    2. It states required results and leaves the method to the contractor Correct answer.
    3. It fixes the number of labor hours the government estimates for each task
    4. It prescribes the detailed processes and materials the contractor must use

    Explanation

    A performance work statement describes the required outcome in measurable terms and permits the contractor to determine how to achieve it. This outcome orientation supports performance-based acquisition and shifts method decisions to the contractor.

  33. Question 33Contract Principles and Planning

    When a solicitation includes an option for additional quantities, the contracting officer must:

    1. Exercise the option only if the contractor consents in writing at that time
    2. Evaluate the option in the award decision and exercise it unilaterally Correct answer.
    3. Obtain new competition before each option is exercised
    4. Exercise the option only during the first year of the contract

    Explanation

    An option is a unilateral right of the government to buy additional quantities or extend performance within the terms of the contract. Because the option is part of the evaluated offer, its potential quantities must be considered when making the award decision.

  34. Question 34Contract Principles and Planning

    A liquidated damages provision in a government contract is enforceable when the stipulated amount:

    1. Is later calculated from the actual damages the government incurs
    2. Equals at least twice the harm expected from the delay
    3. Is a reasonable forecast of harm that is difficult to estimate Correct answer.
    4. Is proposed unilaterally by the contractor and accepted without analysis

    Explanation

    Liquidated damages must represent a reasonable estimate of probable loss made at the time of contracting, where actual loss would be difficult to determine. An amount that bears no reasonable relationship to anticipated harm is an unenforceable penalty.

  35. Question 35Contract Principles and Planning

    A solicitation is set forth as 'brand name or equal' and lists a specific manufacturer's item. The contracting officer must:

    1. Reject any offer of a different brand as nonresponsive without evaluation
    2. Accept only the named brand because the requirement is proprietary
    3. Identify the salient characteristics so that equal products can compete Correct answer.
    4. Waive the specification whenever an equal product costs less

    Explanation

    A brand name or equal description must state the salient physical, functional, or performance characteristics that the named item is meant to satisfy. Offerors of equal products must then be given the chance to demonstrate that their items meet those characteristics.

  36. Question 36Contract Principles and Planning

    Lowest price technically acceptable source selection is most appropriate when:

    1. Offerors are expected to propose different acceptable solutions
    2. The agency expects a tradeoff among competing technical approaches
    3. Past performance differences among offerors are expected to be significant
    4. The requirement is well defined and no tradeoff is needed Correct answer.

    Explanation

    The lowest price technically acceptable approach suits requirements that are clearly defined and where the government is confident that better technical performance is not worth a higher price. Award goes to the lowest-priced offer that meets the stated technical acceptability standards.

  37. Question 37Contract Principles and Planning

    Progress payments based on costs incurred provide contract financing and:

    1. Are made before delivery and recouped from later payments Correct answer.
    2. Are earned only when the government accepts final delivery
    3. Are limited by statute to small business concerns
    4. Require the contractor to post a performance bond for each payment

    Explanation

    Progress payments reimburse a portion of costs as work progresses, before the deliverable is accepted, and are later liquidated by deductions from payments due on delivered items. They are a financing mechanism, not a payment for completed work.

  38. Question 38Contract Principles and Planning

    A mandatory FAR clause required by statute is inadvertently omitted from a contract. Under the Christian doctrine:

    1. The contract is void because a required clause is missing
    2. The omission can be corrected only by mutual mistake reformation
    3. The clause is incorporated by operation of law and is enforceable Correct answer.
    4. The clause applies only if the contractor accepts it after award

    Explanation

    The Christian doctrine holds that a mandatory contract clause that expresses a significant or deeply ingrained public policy is read into the contract even if the contracting officer failed to include it. The clause is therefore enforceable as though it had been written into the instrument.

  39. Question 39Contract Principles and Planning

    Which action is a violation of the Antideficiency Act?

    1. Using appropriated funds for a purpose Congress did not authorize
    2. Selecting other than the lowest-priced offeror in a tradeoff decision
    3. Accepting voluntary services for the government without authority Correct answer.
    4. Awarding a contract without conducting market research

    Explanation

    The Antideficiency Act prohibits accepting voluntary services or employing personal services not authorized by law, along with obligating or expending funds in advance of or in excess of available appropriations. Violations of the purpose statute and of procurement policy are separate concerns.

  40. Question 40Contract Principles and Planning

    A contractor sells its business and wants the successor firm to perform the existing government contract. Under the Assignment of Claims Act and the FAR novation rules:

    1. The contract must be terminated for convenience and recompeted
    2. The contractor may assign the contract by written notice to the contracting officer
    3. The successor may perform if it assumes all contract obligations
    4. The government, transferor, and transferee must execute a novation agreement Correct answer.

    Explanation

    Transferring a government contract to a successor in interest requires a novation agreement signed by the government, the transferor, and the transferee, recognizing the successor as the party bound to perform. Absent that agreement, the original contractor remains liable for performance.

  41. Question 41Contract Formation and Award

    Under the FAR, what is the micro-purchase threshold for most executive agencies?

    1. $10,000 Correct answer.
    2. $3,500
    3. $25,000
    4. $250,000

    Explanation

    FAR 2.101 sets the micro-purchase threshold at $10,000 for most agencies, and FAR 13.202 allows purchases at or below that level to be made without competitive procedures. The threshold was raised over time, so older figures still circulate.

  42. Question 42Contract Formation and Award

    What is the simplified acquisition threshold under the FAR?

    1. $750,000
    2. $250,000 Correct answer.
    3. $100,000
    4. $10,000

    Explanation

    FAR 2.101 defines the simplified acquisition threshold as $250,000, and FAR Part 13 procedures are available for acquisitions at or below that level. The threshold drives numerous FAR requirements, including synopsis and competition rules.

  43. Question 43Contract Formation and Award

    Sealed bidding is the appropriate method of contracting when which set of conditions is present?

    1. The requirement is complex and needs negotiations
    2. Technical proposals will be scored using a best-value tradeoff
    3. Only one responsible source can perform the work
    4. Time is adequate, award by price, no discussions needed Correct answer.

    Explanation

    FAR 6.401 permits sealed bidding only when the agency has enough time, award will be made on the basis of price and other price-related factors, and discussions with bidders are not needed. If any of these conditions fails, negotiated procedures must be used.

  44. Question 44Contract Formation and Award

    Before issuing a solicitation for a requirement above the simplified acquisition threshold using full and open competition, how far in advance must the contracting officer publish a synopsis?

    1. 15 days Correct answer.
    2. 10 days
    3. 30 days
    4. 5 days

    Explanation

    FAR 5.203 requires a synopsis of the proposed contract action to be published at least 15 days before issuance of the solicitation. The period gives industry time to decide whether to participate or to comment on the acquisition strategy.

  45. Question 45Contract Formation and Award

    Which of the following is a permissible justification for other than full and open competition under FAR 6.302?

    1. The need is of unusual and compelling urgency Correct answer.
    2. Competition would take more staff time than is available
    3. The incumbent has more experience than other firms
    4. The contracting officer prefers a single vendor

    Explanation

    FAR 6.302-2 authorizes other than full and open competition when the agency's need is of unusual and compelling urgency and delay would seriously injure the Government. Staff convenience and vendor preference are not statutory bases.

  46. Question 46Contract Formation and Award

    When a solicitation uses a brand name or equal purchase description, what must the solicitation include?

    1. Salient characteristics that an equal product must meet Correct answer.
    2. A waiver of the requirement to conduct market research
    3. A requirement that offerors submit product samples
    4. A statement that only the named brand will be accepted

    Explanation

    FAR 11.104 requires brand name or equal descriptions to state the salient physical, functional, or performance characteristics that an equal product must meet so that offerors can compete on a common basis. Without those characteristics, the description is effectively restrictive.

  47. Question 47Contract Formation and Award

    Which of the following is a responsibility factor the contracting officer must affirmatively determine under FAR 9.104-1?

    1. Compliance with the required proposal page limits
    2. Acceptance of every term and condition without exception
    3. Adequate financial resources to perform the work Correct answer.
    4. Submission of a bid guarantee with the offer

    Explanation

    FAR 9.104-1 lists responsibility factors such as adequate financial resources, ability to meet the delivery schedule, satisfactory performance record, integrity, and necessary organization and equipment. These concern the firm's ability to perform, not the form of its offer.

  48. Question 48Contract Formation and Award

    An otherwise low bid takes exception to the delivery schedule, which is a material term of the invitation for bids. What is the proper action?

    1. Conduct discussions and let the offeror revise the term
    2. Reject the offer as nonresponsive Correct answer.
    3. Award on the basis that the exception is minor
    4. Waive the exception as a minor informality

    Explanation

    A bid that takes exception to a material term does not conform to the invitation and must be rejected as nonresponsive; sealed bidding does not permit discussions or revisions. Only minor informalities that do not affect price, quantity, quality, or delivery may be waived.

  49. Question 49Contract Formation and Award

    A proposal arrives after the closing time. Under the late-proposal rules, the agency may still consider it if which condition applies?

    1. The contracting officer wants more competition
    2. The offeror is the incumbent contractor
    3. The offer is the lowest priced received
    4. Government mishandling caused the proposal to arrive late Correct answer.

    Explanation

    FAR 15.208 permits consideration of a late proposal received before award when accepting it would not unduly delay the acquisition and the delay resulted from Government mishandling after receipt at the designated office, among other limited exceptions. Incumbency, price, and a desire for more competition are not exceptions.

  50. Question 50Contract Formation and Award

    What is the purpose of establishing a competitive range in a negotiated acquisition?

    1. To fix the maximum price the agency will pay
    2. To rank offerors for purposes of a public announcement
    3. To select the awardee without holding discussions
    4. To identify offerors the agency will hold discussions with Correct answer.

    Explanation

    FAR 15.306(c) requires the contracting officer to establish a competitive range of the most highly rated proposals, excluding those with no realistic chance of award, and discussions are then conducted with those offerors. The range is not a price ceiling or an award decision.

  51. Question 51Contract Formation and Award

    In a lowest price technically acceptable source selection, how is award made?

    1. Award goes to the offer with the highest technical score, regardless of price
    2. Award goes to the offer combining price and technical factors using weights
    3. Award goes to the offeror with the best past performance, regardless of price
    4. Award goes to the lowest-priced technically acceptable offer Correct answer.

    Explanation

    Under FAR 15.101-2, the agency evaluates whether offers are technically acceptable and then awards to the lowest-priced acceptable offer; no tradeoff or relative technical ranking is permitted. Proposals are evaluated on a pass/fail basis against the stated requirements.

  52. Question 52Contract Formation and Award

    In a best value tradeoff source selection, which outcome is permissible?

    1. Award must go to the lowest-priced technically acceptable offer
    2. Price and technical merit are each scored and then simply added together
    3. A higher-priced offer may win if its superiority merits the premium Correct answer.
    4. Award must go to the offer with the highest technical rating

    Explanation

    FAR 15.101-1 permits the agency to select a higher-priced, technically superior proposal when the perceived benefit warrants the price premium, consistent with the stated evaluation factors. The tradeoff decision must be documented in the source selection decision.

  53. Question 53Contract Formation and Award

    For a negotiated acquisition, within how many days must an offeror request a debriefing after being notified of exclusion from the competitive range?

    1. 10 days
    2. 5 days
    3. 7 days
    4. 3 days Correct answer.

    Explanation

    FAR 15.505 requires that a written or oral request for debriefing be received within 3 days after the offeror receives notice of exclusion from the competitive range. A timely request also affects the deadline for filing a GAO protest.

  54. Question 54Contract Formation and Award

    How long does an interested party generally have to file a protest with the Government Accountability Office after learning of the basis of protest?

    1. 10 days after the protester knows or should know the basis of protest Correct answer.
    2. 30 days after award is made in every case
    3. At any time before final payment under the contract
    4. 5 days after the solicitation is issued

    Explanation

    Under 4 C.F.R. Part 21, a protest must be filed within 10 days after the protester knew or should have known the basis of protest; a timely requested debriefing extends that to 5 days after the debriefing. Untimely protests are dismissed.

  55. Question 55Contract Formation and Award

    In two-step sealed bidding, what does step one consist of?

    1. A request for technical proposals with no prices Correct answer.
    2. A request for quotations followed by a reverse auction
    3. An invitation for bids with prices but no technical data
    4. A notice of intent to award to a single source

    Explanation

    FAR 14.202-1 through 14.202-4 describe step one as a request for technical proposals submitted without prices, which are evaluated for acceptability. Step two is an invitation for bids limited to firms whose technical proposals were found acceptable.

  56. Question 56Contract Formation and Award

    Which statement about contract options is correct?

    1. Exercising an option requires a new solicitation and competition
    2. Options may be added by modification at any time after award
    3. Exercising an option is unilateral and needs no new contract Correct answer.
    4. An option's price need only be found reasonable when exercised

    Explanation

    FAR 17.207 allows the contracting officer to exercise an option unilaterally when the contract includes it, funds are available, and the exercise is advantageous to the Government. Because the option was evaluated at award, exercise does not create a new procurement.

  57. Question 57Contract Formation and Award

    Under the rule of two, a small business set-aside is appropriate when which condition exists?

    1. The small business must be the incumbent contractor
    2. Two or more responsible small firms can compete at a fair price Correct answer.
    3. The requirement is below the micro-purchase threshold
    4. Only one small business is available to perform the work

    Explanation

    FAR 19.502-2 requires a total small business set-aside when there is a reasonable expectation that offers will be received from at least two responsible small business concerns and that award will be made at fair market prices. Competition among small firms is the key test.

  58. Question 58Contract Formation and Award

    An agency plans to consolidate two existing requirements into a single contract. Under FAR 7.107, the consolidation must be shown to be what?

    1. Necessary and justified by measurable benefits Correct answer.
    2. Administratively convenient for the contracting office
    3. Currently performed by small businesses
    4. Below the simplified acquisition threshold in value

    Explanation

    FAR 7.107-2 permits consolidation only when it is necessary and justified, for example by measurable savings in cost or schedule or by improved performance. Administrative convenience alone is not an adequate justification.

  59. Question 59Contract Formation and Award

    An ordering activity will place an order against a Federal Supply Schedule contract for services requiring a statement of work, valued above the simplified acquisition threshold. What must it generally do?

    1. Solicit a proposal from a single schedule contractor
    2. Send the RFQ to at least three schedule contractors or use eBuy Correct answer.
    3. Conduct a sealed bid opening with all schedule holders
    4. Post a synopsis in SAM.gov and hold a reverse auction

    Explanation

    FAR 8.405-2 requires the ordering activity to provide the request for quotations to at least three schedule contractors, or to post the requirement on eBuy, so that schedule holders receive fair opportunity to be considered. Sealed bidding procedures do not apply to schedule orders.

  60. Question 60Contract Formation and Award

    A firm-fixed-price contract is most appropriate when which situation exists?

    1. The agency wants to reimburse all allowable costs plus a fee
    2. The requirement is poorly defined and likely to change
    3. The requirement is well defined and the contractor can control costs Correct answer.
    4. Costs are highly uncertain and the work is long-term research

    Explanation

    FAR 16.202-1 provides for firm-fixed-price contracts when the requirement is well defined and the contractor can reasonably foresee and control performance costs, placing cost risk on the contractor. Where requirements or costs are uncertain, other contract types are more suitable.

  61. Question 61Contract Formation and Award

    When a bid guarantee is required for a sealed bid acquisition, it must be in an amount equal to at least what percentage of the bid price?

    1. 20 percent Correct answer.
    2. 10 percent
    3. 50 percent
    4. 5 percent

    Explanation

    FAR 28.101-2 requires each bid to be accompanied by a bid guarantee equal to at least 20 percent of the bid price, unless a different amount is specified. The guarantee protects the Government if the bidder fails to execute the contract or furnish required bonds.

  62. Question 62Contract Formation and Award

    For construction contracts, above what value must the contractor generally furnish both performance and payment bonds?

    1. $1,000,000
    2. $250,000
    3. $150,000 Correct answer.
    4. $10,000

    Explanation

    FAR 28.102-1 requires performance and payment bonds for construction contracts exceeding $150,000, each in the full amount of the contract price. The threshold reflects the Miller Act and its implementing coverage.

  63. Question 63Contract Formation and Award

    A contracting officer determines that a bid is mathematically unbalanced because prices are front-loaded. What action is appropriate?

    1. Automatically reject any mathematically unbalanced bid
    2. Reject it only if the unbalancing creates unacceptable risk Correct answer.
    3. Accept it and renegotiate the prices after award
    4. Ignore it, since only the total price matters

    Explanation

    FAR 15.404-1(g) and the sealed bidding rules allow rejection of unbalanced pricing when it poses an unacceptable risk to the Government, such as a risk of paying inflated prices for early work if the contract ends early. Mathematical unbalancing alone does not require rejection.

  64. Question 64Contract Formation and Award

    When must market research be conducted in the acquisition process?

    1. Only when the contracting officer cannot find three sources
    2. Before soliciting offers, to determine the most suitable approach Correct answer.
    3. Only when a sole-source award is planned
    4. Only for acquisitions above the simplified acquisition threshold

    Explanation

    FAR Part 10 requires agencies to conduct market research before developing new requirements and before soliciting offers, in order to determine whether commercial items exist and which acquisition strategy is appropriate. It applies across dollar values and acquisition methods.

  65. Question 65Contract Formation and Award

    In sealed bidding, how are bids handled at the time set for opening?

    1. They are opened privately by the contracting officer and reviewed later
    2. They are returned unopened unless three or more were received
    3. They are opened publicly at the time and place stated in the invitation Correct answer.
    4. They are opened only after the evaluation panel is appointed

    Explanation

    FAR 14.402-1 requires bids to be publicly opened at the time and place stated in the invitation for bids, and the amounts read aloud. Public opening protects the integrity of the competitive process.

  66. Question 66Contract Formation and Award

    Which circumstance supports use of sealed bidding rather than negotiated acquisition?

    1. The agency needs to negotiate technical tradeoffs among competing proposals.
    2. The requirement is clearly defined and price is the deciding factor. Correct answer.
    3. Offerors must be allowed to revise their proposals after discussions.
    4. Only one responsible source can satisfy the requirement.

    Explanation

    FAR 14.103-1 makes sealed bidding appropriate when there is adequate time to solicit and evaluate sealed bids, award will be based on price and other price-related factors, discussions are not needed, and more than one responsible bidder is expected to respond. The method depends on a firm, well-defined requirement and price-based award.

  67. Question 67Contract Formation and Award

    Before issuing a solicitation for a proposed contract action expected to exceed the simplified acquisition threshold, a contracting officer must generally publish a synopsis for at least how long?

    1. 30 days
    2. 15 days Correct answer.
    3. 45 days
    4. 5 days

    Explanation

    FAR 5.203(a) requires a synopsis of the proposed contract action to be published at least 15 days before issuance of the solicitation. Limited exceptions and longer periods apply in specified situations, such as certain research and development actions.

  68. Question 68Contract Formation and Award

    Under FAR 2.101, the micro-purchase threshold applicable to most acquisitions is:

    1. $3,000
    2. $5,000
    3. $10,000 Correct answer.
    4. $25,000

    Explanation

    FAR 2.101 defines the micro-purchase threshold as $10,000, adjusted periodically for inflation. Lower thresholds apply to acquisitions of construction subject to the Davis-Bacon Act and to services subject to the Service Contract Act.

  69. Question 69Contract Formation and Award

    Which individual may bind the Government by entering into a contract?

    1. A warranted contracting officer acting within delegated authority. Correct answer.
    2. Any agency employee who has been assigned to administer the program office.
    3. The program manager who signed the requirements document for the acquisition.
    4. Any member of the source selection team who evaluated the proposals.

    Explanation

    FAR 1.602-1 vests authority to enter into and administer contracts in contracting officers acting within the limits of their delegated authority. Program officials and evaluation team members do not hold that authority merely by virtue of their roles.

  70. Question 70Contract Formation and Award

    After receipt of proposals but before the competitive range is established, a contracting officer contacts an offeror to clarify whether the offeror intended to include a particular option in its proposal. Which statement describes the permissible scope of that exchange?

    1. It may be used to inform the offeror of the prices offered by competing firms and invite a revised price.
    2. It may not permit the offeror to revise its proposal or cure a deficiency. Correct answer.
    3. It may be used to advise the offeror of its evaluated weaknesses and request revisions to its technical approach.
    4. It may be used to allow the offeror to submit missing past performance references that the solicitation required.

    Explanation

    FAR 15.306(a) permits clarifications that are limited exchanges to resolve minor or clerical issues, such as clarifying a perceived ambiguity. Clarifications may not be used to cure proposal deficiencies or materially alter the proposal, because that is the function of discussions.

  71. Question 71Contract Formation and Award

    Once discussions are opened with one offeror in the competitive range, the contracting officer must:

    1. Conduct discussions with all offerors that submitted a proposal, including those excluded from the competitive range.
    2. Conduct discussions with every offeror in the competitive range. Correct answer.
    3. Conduct discussions only with the offerors whose proposals rank highest in the initial evaluation.
    4. Conduct discussions with each offeror simultaneously by teleconference.

    Explanation

    FAR 15.306(d)(1) requires that discussions, once begun, be held with all offerors within the competitive range, and each must be given the opportunity to submit a final proposal revision. The agency cannot limit discussions to the most highly rated competitors.

  72. Question 72Contract Formation and Award

    The Government may award a contract on the basis of initial proposals without holding discussions only if which condition is met?

    1. The contracting officer determines that discussions would not change the outcome.
    2. The solicitation advised offerors of the intent to award without discussions. Correct answer.
    3. Every offeror agreed in writing to waive discussions.
    4. At least three proposals were received in response to the solicitation.

    Explanation

    FAR 15.306(a)(3) allows award on initial proposals when the solicitation notified offerors of the Government's intent to evaluate and award without discussions, typically through the provision at FAR 52.215-1. The announcement preserves the Government's discretion to hold discussions if it later decides they are needed.

  73. Question 73Contract Formation and Award

    The Certificate of Independent Price Determination (FAR 52.203-2) is included in sealed bid solicitations in order to:

    1. Certify that the bidder has reviewed the specifications and is able to meet the required delivery schedule.
    2. Obtain the bidder's certification that the bid was arrived at independently and without collusion. Correct answer.
    3. Certify that the bidder's price was developed using certified cost or pricing data.
    4. Certify that the bidder is a small business concern eligible for the set-aside.

    Explanation

    FAR 14.201-6(b) requires the certificate in invitations for bids to support the procurement integrity and antitrust objectives of FAR 3.103-1. The bidder certifies that the bid was developed independently and that no information about a competitor's bid was disclosed or solicited.

  74. Question 74Contract Formation and Award

    After bid opening, the contracting officer may permit correction of a bid only when:

    1. The error is apparent from the bid, or clear and convincing evidence shows the mistake and intended bid. Correct answer.
    2. The contracting officer concludes that correcting the bid would not change the relative ranking of the bidders or the award decision.
    3. The bidder is the apparent low bidder and agrees to hold its corrected price to the Government estimate.
    4. The bidder submits a written request within five days after bid opening, regardless of the evidence available in the file.

    Explanation

    FAR 14.407-3 allows correction of a mistake in a bid only where the mistake and the intended bid are evident from the face of the bid or are established by clear and convincing evidence. The standard protects the integrity of the sealed bidding process rather than the bidder's convenience.

  75. Question 75Contract Formation and Award

    An amendment to an invitation for bids changes a material term of the requirement. A bidder submits a bid before the amendment is issued and never acknowledges the amendment. The contracting officer must:

    1. Hold the bid and request acknowledgment after the bid opening deadline.
    2. Waive the failure because the bidder received the amendment in time to perform.
    3. Reject the bid as nonresponsive. Correct answer.
    4. Accept the bid and apply the amended terms at award.

    Explanation

    Under FAR 14.405, a bid that does not acknowledge a material amendment must be rejected because acceptance would prejudice the other bidders. Only failure to acknowledge a nonmaterial amendment may be waived where it would not affect price, quantity, quality, or delivery.

  76. Question 76Contract Formation and Award

    In a negotiated acquisition, the solicitation must state:

    1. All evaluation factors and significant subfactors, and their relative importance. Correct answer.
    2. The maximum number of proposals that the agency expects to place in the competitive range.
    3. The numeric weights assigned to each technical subfactor.
    4. The names and qualifications of the members of the source selection evaluation board.

    Explanation

    FAR 15.304(d) requires the solicitation to state all evaluation factors and significant subfactors that will affect the award decision and their relative importance. Disclosure ensures that offerors can structure their proposals and that the evaluation is conducted on the announced basis.

  77. Question 77Contract Formation and Award

    Certified cost or pricing data are not required for a particular acquisition. To support a determination that the proposed price is fair and reasonable, the contracting officer should:

    1. Require the offeror to submit certified cost or pricing data with its proposal.
    2. Perform price analysis to determine that the price is fair and reasonable. Correct answer.
    3. Obtain a DCAA audit of the offeror's estimating system before award.
    4. Request the offeror's most recent incurred cost submission for the prior year.

    Explanation

    FAR 15.404-1(b) directs that price analysis be used when certified cost or pricing data are not required, and the contracting officer must still determine that the resulting price is fair and reasonable. Price analysis may rely on competition, catalog or market prices, or comparison with prior prices and the Government estimate.

  78. Question 78Contract Formation and Award

    Which action by a contracting officer during discussions with an offeror is prohibited?

    1. Identifying a deficiency in the offeror's technical proposal and requesting a revised approach.
    2. Disclosing another offeror's price to induce the offeror to lower its price. Correct answer.
    3. Advising the offeror that its past performance references do not demonstrate relevant experience.
    4. Informing the offeror that its proposed price is higher than the Government estimate.

    Explanation

    FAR 15.306(e)(3) bars revealing one offeror's price to another and any conduct that results in an auction, because it would compromise the integrity of the competition. By contrast, telling an offeror that its price is high or identifying proposal deficiencies is a normal and permitted part of discussions.

  79. Question 79Contract Formation and Award

    A negotiated contract was awarded on the basis of certified cost or pricing data. A later review shows the data were inaccurate and the negotiated price was overstated as a result. Under the Truthful Cost or Pricing Data statute and FAR 15.407-1, the contracting officer should:

    1. Take no action, because certified cost or pricing data become conclusive once the contract is awarded.
    2. Adjust the contract price downward to reflect the defective data. Correct answer.
    3. Refer the matter exclusively to the agency's suspension and debarment official.
    4. Terminate the contract for default and reprocure the requirement from another source.

    Explanation

    FAR 15.407-1(b) provides for a downward price adjustment when certified cost or pricing data were inaccurate, incomplete, or noncurrent and the contract price was increased as a result. The remedy is a price reduction reflecting the defective data, not termination of the contract.

  80. Question 80Contract Formation and Award

    While establishing the competitive range, the contracting officer may conduct "communications" with offerors. Which purpose is permitted for such communications?

    1. To tell an offeror how its proposal ranks relative to the other competing proposals.
    2. To address adverse past performance information to which the offeror has not had a chance to respond. Correct answer.
    3. To allow an offeror to revise its technical proposal in response to weaknesses identified by the evaluators.
    4. To negotiate a lower price with the offeror whose proposal is ranked highest by the evaluators.

    Explanation

    FAR 15.306(b)(1) allows communications before establishment of the competitive range to enhance the Government's understanding of proposals, including addressing adverse past performance information the offeror has not yet had an opportunity to rebut. These exchanges may not be used to revise proposals or bargain over price.

  81. Question 81Contract Administration and Pricing

    The contracting officer issues a unilateral modification directing the contractor to perform changed work that falls within the scope of the Changes clause. What must the contractor do?

    1. Perform and immediately appeal to the board of contract appeals
    2. Perform only after funds are certified by the contracting officer
    3. Suspend performance until the contractor signs the modification
    4. Perform the work and request an equitable adjustment Correct answer.

    Explanation

    The Changes clause authorizes the contracting officer to direct changes unilaterally, and the contractor must continue performance while pursuing an equitable adjustment in price, schedule, or other affected terms. Any disagreement about the amount is resolved later through a request for equitable adjustment or a claim.

  82. Question 82Contract Administration and Pricing

    Under the Limitation of Cost clause, the contractor must notify the contracting officer when it reasonably believes that costs to be incurred in the next 60 days, added to costs already incurred, will exceed what percentage of the estimated cost?

    1. 100 percent
    2. 75 percent Correct answer.
    3. 50 percent
    4. 90 percent

    Explanation

    The Limitation of Cost clause requires written notice when the contractor expects that costs in the next 60 days plus costs already incurred will exceed 75 percent of the estimated cost, and again as the total estimated cost is approached. This gives the Government time to add funds or direct the contractor to curtail work.

  83. Question 83Contract Administration and Pricing

    Under the Prompt Payment Act, when is payment due on a proper invoice under a non-commercial-item contract, absent a different agreed date in the contract?

    1. 20 days after receipt of the invoice
    2. 30 days after receipt of the invoice Correct answer.
    3. 45 days after receipt of the invoice
    4. 10 days after receipt of the invoice

    Explanation

    The Prompt Payment Act and its implementing regulation establish a 30-day due date measured from receipt of a proper invoice, or from acceptance when acceptance occurs later. Interest begins to accrue automatically when payment is late and is paid without a contractor demand.

  84. Question 84Contract Administration and Pricing

    Which circumstance supports termination of a fixed-price supply contract for default?

    1. Delivery was repeatedly late Correct answer.
    2. The contractor requested a price increase
    3. A competitor offered a lower price
    4. The Government no longer needs the supplies

    Explanation

    Default termination is proper when the contractor fails to deliver on time, fails to make progress so as to endanger performance, or fails to perform other material provisions of the contract. Reduced Government need or a better price elsewhere is a matter for termination for convenience.

  85. Question 85Contract Administration and Pricing

    A contractor performed work at the oral direction of a Government inspector who held no contracting authority. What is the proper mechanism for giving the resulting commitment legal effect?

    1. A written assignment of claims
    2. Ratification by an authorized official Correct answer.
    3. A novation agreement with the successor
    4. A cure notice issued by the contracting officer

    Explanation

    An unauthorized commitment may be ratified by an official with authority to bind the Government, after legal review and a determination that the Government received value or that the commitment would otherwise be proper. Ratification creates the obligation that the original act could not.

  86. Question 86Contract Administration and Pricing

    After the Government accepts conforming supplies, the contractor remains liable for which of the following?

    1. Normal wear during use of the items
    2. Damage occurring in transit after acceptance
    3. Changes in the market price of the items
    4. Latent defects and fraud Correct answer.

    Explanation

    The Inspection clause preserves the Government's rights for latent defects, fraud, and gross mistakes amounting to fraud notwithstanding acceptance or final payment. Ordinary risks pass to the Government once conforming supplies are accepted.

  87. Question 87Contract Administration and Pricing

    Which of the following costs is expressly unallowable under FAR 31.205?

    1. Premiums for workers' compensation insurance
    2. Amortization of special tooling acquired for the contract
    3. Alcoholic beverages Correct answer.
    4. Depreciation on contractor-owned equipment

    Explanation

    The cost principle addressing alcoholic beverages makes their cost unallowable regardless of allocability. Depreciation, workers' compensation insurance, and amortization of special tooling are allowable when reasonable, allocable, and consistent with the contractor's cost accounting practices.

  88. Question 88Contract Administration and Pricing

    Under the Contract Disputes Act, a contractor that receives a contracting officer's final decision may appeal to the appropriate board of contract appeals within how many days of receipt?

    1. 30 days
    2. 90 days Correct answer.
    3. 45 days
    4. 60 days

    Explanation

    The contractor has 90 days from receipt of the final decision to appeal to a board of contract appeals, or may instead file suit in the U.S. Court of Federal Claims within 12 months. Filing within one forum does not preserve the other.

  89. Question 89Contract Administration and Pricing

    Under customary progress payments based on costs incurred, what is the maximum rate applicable to a large business concern?

    1. 90 percent
    2. 85 percent
    3. 80 percent Correct answer.
    4. 100 percent

    Explanation

    Customary progress payment rates are 80 percent of costs incurred for large business concerns and 85 percent for small business concerns. Exceeding a customary rate requires a determination and findings supporting the higher rate.

  90. Question 90Contract Administration and Pricing

    Which document establishes a contractor's final indirect cost rates for a fiscal year so that flexibly priced contracts can be settled?

    1. A certificate of current cost or pricing data
    2. A cost accounting standards disclosure statement
    3. A negotiated indirect cost rate agreement Correct answer.
    4. A forward pricing rate agreement

    Explanation

    The contracting officer determines final indirect cost rates for each business unit, normally after audit, and documents them in a negotiated indirect cost rate agreement used to settle flexibly priced contracts and close them out. Provisional billing rates are later reconciled to these final rates.

  91. Question 91Contract Administration and Pricing

    When the contracting officer orders a change under the Changes clause, what may the resulting equitable adjustment cover?

    1. Anticipated profit on the entire contract value
    2. Only costs incurred within 30 days after the change
    3. Only the direct labor cost of the changed work
    4. An adjustment to the price and schedule Correct answer.

    Explanation

    The Changes clause entitles the contractor to an equitable adjustment in the contract price and, where the change affects performance time, the delivery schedule and other affected terms. The adjustment reflects the net cost impact of the change, including allowable indirect costs and profit on the changed work.

  92. Question 92Contract Administration and Pricing

    Under the Stop-Work Order clause, within how many days after issuing the order must the contracting officer either cancel it or terminate the affected work?

    1. 20 days
    2. 15 days
    3. 30 days Correct answer.
    4. 10 days

    Explanation

    The clause requires the contracting officer to cancel the stop-work order or terminate the work covered by it within 30 days. The contractor may be entitled to an equitable adjustment for costs caused by the suspension if the order is later cancelled or the delay is unreasonable.

  93. Question 93Contract Administration and Pricing

    Before exercising a contract option, the contracting officer must determine that funds are available and that:

    1. The contractor's most recent past performance rating is satisfactory
    2. The contractor has submitted certified cost or pricing data
    3. The option price is below the competitive market price
    4. The option is the most advantageous method of meeting the need Correct answer.

    Explanation

    Exercise of an option requires a determination that funds are available, that the option is the most advantageous method of fulfilling the requirement considering price and other factors, and that the option price is fair and reasonable. The determination must be documented before notice of exercise is given.

  94. Question 94Contract Administration and Pricing

    Under a value engineering incentive clause, when an accepted value engineering change proposal reduces contract cost, the contractor receives:

    1. Reimbursement of proposal preparation costs only
    2. A share of savings as stated in the clause Correct answer.
    3. The entire amount of the savings realized
    4. Nothing beyond the contract price already negotiated

    Explanation

    The value engineering clauses provide for sharing realized savings with the contractor, typically a percentage of instant savings and a declining share of collateral savings, as specified in the clause. The share is the incentive for contractors to propose cost-reducing changes.

  95. Question 95Contract Administration and Pricing

    Full Cost Accounting Standards coverage applies to a business unit that receives a single CAS-covered contract award of at least:

    1. $10 million
    2. $50 million Correct answer.
    3. $100 million
    4. $2 million

    Explanation

    Full CAS coverage is triggered by a single CAS-covered award of $50 million or more, or by CAS-covered awards totaling $50 million or more in the preceding cost accounting period. Business units below that level but above the lower threshold receive modified coverage.

  96. Question 96Contract Administration and Pricing

    Cost realism analysis is required when the Government evaluates proposals for which type of contract?

    1. Cost-plus-fixed-fee Correct answer.
    2. Firm-fixed-price with economic price adjustment
    3. Fixed-price incentive (firm)
    4. Firm-fixed-price

    Explanation

    Cost realism analysis is required for cost-reimbursement contracts because the Government bears the risk of actual costs and must judge whether each offeror's proposed cost estimate is realistic for the work. For fixed-price contracts the emphasis is on price reasonableness, since the contractor bears the cost risk.

  97. Question 97Contract Administration and Pricing

    A contractor sells its business and the buyer will perform the remaining work. What must occur before the buyer is recognized as the contract successor?

    1. A unilateral change order issued by the contracting officer
    2. A written assignment signed by the contractor only
    3. A novation agreement executed by all three parties Correct answer.
    4. A new offer submitted by the buyer

    Explanation

    A novation agreement among the transferor, the transferee, and the Government, executed by the contracting officer, is required before the successor is recognized as the contractor. The review protects the Government by confirming the successor's capability and that the transfer will not increase cost or delay performance.

  98. Question 98Contract Administration and Pricing

    Absent unusual circumstances, within what period after final payment or expiration of the delivery date should a contracting office close out a contract?

    1. 12 months
    2. 6 months Correct answer.
    3. 24 months
    4. 3 months

    Explanation

    Contracting offices should close out contracts within 6 months after the later of final payment or expiration of the contract delivery date, using the quick-closeout procedure where the criteria are met. Prompt closeout releases unliquidated obligations and resolves outstanding balances.

  99. Question 99Contract Administration and Pricing

    A small business subcontracting plan is generally required for a negotiated award to a large business concern when the contract value exceeds:

    1. $750,000 Correct answer.
    2. $500,000
    3. $5 million
    4. $250,000

    Explanation

    A subcontracting plan is required when the award exceeds $750,000 ($1.5 million for construction) and subcontracting opportunities exist. The plan must include goals, assurances, and a description of the efforts the contractor will make to use small business concerns.

  100. Question 100Contract Administration and Pricing

    How is the award fee under a cost-plus-award-fee contract determined?

    1. By applying a performance index to the base fee amount
    2. By negotiation with the contractor each period
    3. Unilaterally by the Government after each period Correct answer.
    4. By a formula stated in the contract

    Explanation

    Award fee is determined unilaterally by the fee-determining official based on the evaluation of contractor performance against the award-fee plan for each evaluation period. The amount is not negotiated with the contractor and is not subject to the disputes process.

  101. Question 101Contract Administration and Pricing

    Which item is excluded from a termination for convenience settlement?

    1. Settlement expenses for subcontractor claims
    2. Profit on work that was never performed Correct answer.
    3. Costs incurred for work completed
    4. Reasonable profit on preparatory work performed

    Explanation

    A convenience termination makes the contractor whole for costs incurred, settlement expenses, and a reasonable profit on preparations made and work done before termination, but no profit is allowed on work never performed. The settlement compensates actual impact rather than anticipated earnings.

  102. Question 102Contract Administration and Pricing

    A contractor's default forces the Government to buy similar supplies from another source at a higher price. What remedy does the Default clause give the Government?

    1. Deduct the original contract price from any settlement amount
    2. Terminate the replacement contract for convenience
    3. Assess the excess reprocurement costs against the contractor Correct answer.
    4. Recover the entire cost of the replacement contract

    Explanation

    The Default clause allows the Government to recover the excess costs of repurchase, measured by the difference between the cost of the replacement contract and the price the defaulted contractor would have charged, plus associated administrative costs. Recovery is compensatory and may not exceed the actual excess.

  103. Question 103Contract Administration and Pricing

    Which contract type is prohibited by statute?

    1. Cost-plus-award-fee
    2. Cost-plus-incentive-fee
    3. Firm-fixed-price with economic price adjustment
    4. Cost-plus-a-percentage-of-cost Correct answer.

    Explanation

    Cost-plus-a-percentage-of-cost contracts are prohibited because they give the contractor an incentive to increase costs in order to increase fee. Permitted cost-reimbursement types use a fixed fee, an incentive formula, or an award fee that is not a percentage of cost.

  104. Question 104Contract Administration and Pricing

    How does the Limitation of Funds clause differ from the Limitation of Cost clause?

    1. It removes the contractor's duty to notify the Government
    2. It covers incrementally funded contracts only Correct answer.
    3. It applies only to fixed-price contracts
    4. It caps the Government's liability at the total estimated cost

    Explanation

    The Limitation of Funds clause is used when a cost-reimbursement contract is incrementally funded, and it obligates the Government only up to the amount currently allotted while requiring the contractor to give notice as that amount is approached. The Limitation of Cost clause applies to fully funded cost-reimbursement contracts and addresses the total estimated cost.

  105. Question 105Contract Administration and Pricing

    During performance, a Government representative requires the contractor to meet a stricter inspection standard than the contract specifies, without issuing a modification. How is this best characterized?

    1. A constructive change under the Changes clause Correct answer.
    2. An excusable delay
    3. A termination for convenience
    4. An unauthorized commitment requiring ratification

    Explanation

    A constructive change occurs when the Government, without a formal modification, requires work or standards beyond those in the contract, entitling the contractor to an equitable adjustment under the Changes clause. The contractor should provide notice and document the additional requirement.

  106. Question 106Contract Administration and Pricing

    For a contract that does not specify a payment period, within how many days after receipt of a proper invoice must an agency pay under the Prompt Payment Act?

    1. 30 days Correct answer.
    2. 60 days
    3. 45 days
    4. 15 days

    Explanation

    The Prompt Payment Act generally sets a 30-day payment period after the agency receives a proper invoice when the contract is silent. Interest penalties may accrue if payment is late.

  107. Question 107Contract Administration and Pricing

    Which action is an example of price analysis rather than cost analysis?

    1. Auditing the contractor's incurred direct material costs.
    2. Comparing the proposed price to a catalog price. Correct answer.
    3. Reviewing the contractor's labor-hour breakdown and overhead rates.
    4. Evaluating the reasonableness of a proposed profit rate using cost data.

    Explanation

    Price analysis evaluates the reasonableness of a total price without separately examining cost elements. Comparing a proposed price with a catalog price is a recognized price analysis technique.

  108. Question 108Contract Administration and Pricing

    Provisional billing rates are established primarily to do which of the following?

    1. Reimburse indirect costs on an interim basis. Correct answer.
    2. Fix the contractor's final indirect rates for the year.
    3. Set the ceiling on allowable direct labor costs.
    4. Determine the profit rate on a fixed-price contract.

    Explanation

    Provisional billing rates are used for interim reimbursement of indirect costs, subject to later final determination. They are not final rates and do not set direct cost ceilings or profit.

  109. Question 109Contract Administration and Pricing

    An economic price adjustment clause in a fixed-price contract is designed to do which of the following?

    1. Guarantee the contractor a minimum profit regardless of cost.
    2. Reimburse the contractor for all actual costs incurred.
    3. Convert the contract to a cost-reimbursement type if costs rise.
    4. Allow the price to change based on specified contingencies. Correct answer.

    Explanation

    An economic price adjustment clause permits price changes tied to specified contingencies, such as published market indices, within stated limits. It preserves a fixed-price framework rather than converting to cost reimbursement.

  110. Question 110Contract Administration and Pricing

    What is the primary purpose of a forward pricing rate agreement (FPRA) between the Government and a contractor?

    1. To replace the need for any cost or price analysis.
    2. To set rates for pricing future contracts and modifications. Correct answer.
    3. To authorize the contractor to bill at rates above the contract ceiling.
    4. To settle incurred indirect costs for prior fiscal years.

    Explanation

    An FPRA establishes forward pricing rates that the parties use in pricing future contracts and modifications, reducing repeated audits. It does not settle prior incurred costs or eliminate the need for price or cost analysis.

  111. Question 111Contract Administration and Pricing

    Under the Assignment of Claims Act, a contractor may assign its right to payment under a contract to a financing institution if the claim is for at least what amount?

    1. $10,000
    2. $500
    3. $5,000
    4. $1,000 Correct answer.

    Explanation

    The Assignment of Claims Act permits assignment of claims for at least $1,000 to a financing institution, subject to contract requirements. This supports contractor financing.

  112. Question 112Contract Administration and Pricing

    Certified cost or pricing data are generally not required when the contracting officer determines that the price is based on which of the following?

    1. A cost-plus-fixed-fee pricing arrangement.
    2. The contractor's historical overhead application.
    3. A sole-source contractor's estimated labor rates.
    4. Adequate price competition. Correct answer.

    Explanation

    The TINA exceptions include adequate price competition, catalog or market prices, and certain commercial-item acquisitions. A cost-reimbursement arrangement by itself does not create an exception.

  113. Question 113Contract Administration and Pricing

    In a cost-reimbursement contract, what is the effect of a clause requiring the contracting officer's consent to subcontract?

    1. The contractor may substitute any subcontractor without notice.
    2. The contractor may not award any subcontract without written consent.
    3. Consent applies only to subcontracts the clause designates. Correct answer.
    4. The contracting officer assumes privity with all subcontractors.

    Explanation

    Consent-to-subcontract clauses apply to the subcontracts the clause designates, often those above a stated threshold or of a specified type. The clause does not require consent for every subcontract or create privity with subcontractors.

  114. Question 114Contract Administration and Pricing

    A Government employee without contracting authority directs a contractor to perform extra work. What is the proper action to authorize payment?

    1. The contractor submits an invoice and the payment office pays it as a contract modification.
    2. The employee signs a purchase order after the work is completed.
    3. The contractor files a claim under the Disputes clause without notifying the agency.
    4. The contracting officer ratifies the unauthorized commitment if appropriate. Correct answer.

    Explanation

    An unauthorized commitment may be ratified by a Government official with authority, provided funds are available and legal requirements are met. Payment should not be made merely because the work was performed.

  115. Question 115Contract Administration and Pricing

    When a contract authorizes Government inspection at a subcontractor's plant, what right does the Government generally have?

    1. To inspect the subcontractor's work at its facility. Correct answer.
    2. To terminate the subcontract without the prime contractor's consent.
    3. To direct the subcontractor to change its production methods.
    4. To pay the subcontractor directly for its costs.

    Explanation

    Inspection clauses may permit Government access to subcontractor facilities to verify that work conforms to contract requirements. The Government does not thereby gain authority to direct the subcontractor's methods or pay it directly.

  116. Question 116Contract Administration and Pricing

    A cost that is not directly attributable to a single final cost objective but benefits two or more objectives is classified as what type of cost?

    1. Indirect cost Correct answer.
    2. Sunk cost
    3. Direct cost
    4. Disallowed cost

    Explanation

    Indirect costs benefit multiple cost objectives and are allocated rather than charged directly to one objective. Direct costs can be identified specifically with a single cost objective.

  117. Question 117Contract Administration and Pricing

    Which action can a contracting officer accomplish by unilateral modification without an equitable adjustment?

    1. Correcting a typographical error in the contract. Correct answer.
    2. Changing the delivery schedule to an earlier date.
    3. Adding a new requirement outside the original scope.
    4. Changing the contract quantity within the scope of the contract.

    Explanation

    Administrative changes, such as correcting typographical errors, may be made unilaterally and ordinarily do not warrant an equitable adjustment. Substantive changes to quantity, scope, or delivery generally require adjustment.

  118. Question 118Contract Administration and Pricing

    A cost-plus-incentive-fee contract has a target cost of $100,000, a target fee of $10,000, and an 80/20 contractor/Government share ratio. If actual allowable cost is $120,000, what is the contractor's fee before applying any minimum or maximum fee limits?

    1. $4,000
    2. $10,000
    3. $6,000 Correct answer.
    4. $14,000

    Explanation

    The $20,000 overrun is shared 20 percent by the contractor, producing a $4,000 reduction from the target fee. The fee is therefore $10,000 minus $4,000, or $6,000.

  119. Question 119Contract Administration and Pricing

    Under the Limitation of Cost clause, when must the contractor notify the contracting officer when costs are approaching the estimated cost?

    1. When 50% of the estimated cost has been incurred.
    2. Only after the estimated cost is exceeded.
    3. When 90% of the estimated cost has been incurred.
    4. When 75% of the estimated cost will be exceeded. Correct answer.

    Explanation

    The Limitation of Cost clause requires written notice when the contractor expects that costs within the next 60 days will exceed 75 percent of the estimated cost. This allows the contracting officer to decide whether to continue or modify the contract.

  120. Question 120Contract Administration and Pricing

    If a contractor's failure to perform is caused by a Government-caused delay, how is a termination for default generally resolved?

    1. The contractor must pay excess reprocurement costs.
    2. The default termination remains but the contractor receives an equitable adjustment.
    3. The termination is converted to a termination for convenience. Correct answer.
    4. The contract is automatically reinstated with no adjustment.

    Explanation

    When the contractor's default is excused by Government action, the default termination is improper and is generally converted to a termination for convenience. The contractor is not liable for excess reprocurement costs in that situation.

  121. Question 121Contract Execution, Modification, and Termination

    Under the Changes clause, what must a contractor do after receiving a written change order that the contractor believes is outside the contract's scope?

    1. Stop all work until the change order is withdrawn by the contracting officer
    2. Proceed with the work and request an equitable adjustment Correct answer.
    3. Terminate the contract for convenience
    4. Perform only the unchanged portion of the contract

    Explanation

    The Changes clause requires the contractor to continue performance after a written change order, even if the contractor disputes the change or its price. The disagreement is resolved through the equitable adjustment process and, if necessary, the disputes process.

  122. Question 122Contract Execution, Modification, and Termination

    Which contract modification is properly issued unilaterally because it does not affect the contractor's substantive rights?

    1. A change in delivery schedule that increases the contract price
    2. A revision to the statement of work that adds new requirements
    3. An extension of the period of performance with added cost
    4. A correction of a typographical error in the contract number Correct answer.

    Explanation

    Administrative changes are unilateral modifications that correct clerical errors or make similar changes without affecting substantive contract rights. Changes that affect price, scope, or performance obligations are not administrative changes.

  123. Question 123Contract Execution, Modification, and Termination

    When the Government terminates a contract for convenience, the contractor is generally entitled to recover which of the following?

    1. Only the contract price for completed and accepted items
    2. Anticipated profit on all work not yet performed
    3. Costs incurred and profit on work done, plus settlement expenses Correct answer.
    4. Punitive damages because the termination was not the contractor's fault

    Explanation

    A convenience termination entitles the contractor to recover costs incurred, profit on work completed, and reasonable settlement expenses. The contractor is not entitled to anticipatory profit on work that was never performed.

  124. Question 124Contract Execution, Modification, and Termination

    A stop-work order issued under the standard Stop-Work Order clause may require the contractor to stop work for up to how long before the contracting officer must take further action?

    1. 90 days Correct answer.
    2. 180 days
    3. 30 days
    4. 10 days

    Explanation

    The standard Stop-Work Order clause permits the contracting officer to order the contractor to stop work for a period of 90 days or less. If the order is not canceled within that period, the contractor may be entitled to an equitable adjustment.

  125. Question 125Contract Execution, Modification, and Termination

    In a commercial-item contract, a termination based on the contractor's default is typically referred to as what?

    1. Termination for cause Correct answer.
    2. Termination for novation
    3. Termination for excusable delay
    4. Termination for convenience

    Explanation

    Commercial-item contracts use the term termination for cause when the Government ends the contract because of the contractor's default. This is distinct from a termination for convenience, which is exercised in the Government's interest.

  126. Question 126Contract Execution, Modification, and Termination

    What is the contractor's first obligation upon receiving a notice of termination for convenience?

    1. Transfer all subcontracts to the Government
    2. Submit a final invoice for the full contract price
    3. Stop work and avoid incurring further costs except as authorized Correct answer.
    4. Continue performance until the contracting officer confirms the termination

    Explanation

    Upon receipt of a termination notice, the contractor must stop work immediately and minimize further costs. The contractor then follows the contracting officer's instructions for disposition of property and submission of a settlement proposal.

  127. Question 127Contract Execution, Modification, and Termination

    How is an option under a Government contract ordinarily exercised?

    1. By the contractor beginning performance of the option work
    2. By the contractor's written acceptance of the option price
    3. By the contracting officer's written notice within the option period Correct answer.
    4. By a bilateral supplemental agreement signed by both parties

    Explanation

    An option is exercised by the contracting officer's written notice before the option expires. Exercise is generally unilateral and does not require a new bilateral agreement or the contractor's acceptance.

  128. Question 128Contract Execution, Modification, and Termination

    Under the Limitation of Cost clause, what happens when the contractor incurs costs above the estimated cost stated in the contract?

    1. The Government is not obligated to pay the excess Correct answer.
    2. The contracting officer must immediately increase the estimated cost
    3. The contractor is automatically entitled to reimbursement of all excess costs
    4. The contractor must complete the work at no additional charge

    Explanation

    The Limitation of Cost clause limits the Government's obligation to the estimated cost stated in the contract unless that amount is increased by modification. The contractor must notify the contracting officer as costs approach the limit.

  129. Question 129Contract Execution, Modification, and Termination

    An unauthorized Government employee directs a contractor to perform extra work. What is the proper mechanism for the contracting officer to approve the commitment after the fact?

    1. Terminate the contract for default
    2. Issue a stop-work order
    3. Ratify the unauthorized commitment Correct answer.
    4. Exercise a contract option

    Explanation

    Ratification is the contracting officer's approval of an unauthorized commitment after it occurs. It requires a determination that the commitment is proper and that the Government received a benefit, among other conditions.

  130. Question 130Contract Execution, Modification, and Termination

    A contractor wants to transfer all rights and obligations under a contract to another company through a merger. What must the contracting officer recognize for the transfer to be effective against the Government?

    1. A subcontracting plan
    2. A change order
    3. A novation agreement Correct answer.
    4. An assignment of claims

    Explanation

    A novation agreement is used when a contractor transfers a contract to a successor, such as through a merger or sale. The Anti-Assignment Act generally prohibits transfers of Government contracts without Government recognition.

  131. Question 131Contract Execution, Modification, and Termination

    After a termination for convenience, within what period must the contractor generally submit its settlement proposal unless the contracting officer authorizes more time?

    1. 90 days
    2. 30 days
    3. 1 year Correct answer.
    4. 6 months

    Explanation

    The contractor generally must submit its termination settlement proposal within one year from the effective date of the termination. The contracting officer may authorize a longer period when appropriate.

  132. Question 132Contract Execution, Modification, and Termination

    Before terminating a contract for default based on failure to make progress that is curable, the contracting officer generally must issue what?

    1. A termination for convenience notice
    2. A cure notice giving at least 10 days to remedy the failure Correct answer.
    3. A stop-work order for 90 days
    4. A show-cause notice giving 30 days

    Explanation

    A cure notice is required when the contractor's failure is curable and not caused by an excusable delay. It generally gives the contractor at least 10 days to remedy the failure before default termination.

  133. Question 133Contract Execution, Modification, and Termination

    What is a constructive change?

    1. A termination that converts to convenience
    2. A bilateral modification that changes only the delivery schedule
    3. Unofficial direction to perform work different from the contract Correct answer.
    4. A change order issued without the contractor's prior consent

    Explanation

    A constructive change arises when Government conduct or direction requires performance different from the contract without a formal change order. The contractor may seek an equitable adjustment as if a formal change had been issued.

  134. Question 134Contract Execution, Modification, and Termination

    When the contracting officer partially terminates a contract for convenience, what happens to the remaining portion?

    1. It is automatically terminated for default
    2. It is suspended until the contractor requests resumption
    3. It remains in effect and the contractor continues performance Correct answer.
    4. It is assigned to another contractor by novation

    Explanation

    A partial termination for convenience ends only the specified portion of the contract. The contractor continues performance on the unterminated portion and may seek an adjustment for the terminated work.

  135. Question 135Contract Execution, Modification, and Termination

    A contractor's performance is delayed by an unforeseeable severe storm that meets the contract's excusable delay clause. What is the contractor generally entitled to?

    1. Consequential damages for lost profits
    2. A price increase for all costs incurred during the delay
    3. An extension of time for performance Correct answer.
    4. Termination for convenience at the contractor's request

    Explanation

    Excusable delay entitles the contractor to a time extension for the period of delay. It does not by itself entitle the contractor to additional profit or a price increase unless another contract clause provides for it.

  136. Question 136Contract Execution, Modification, and Termination

    Under the Suspension of Work clause, when may a contractor receive an equitable adjustment for a suspension ordered by the contracting officer?

    1. When the suspension is unreasonable and increases cost or time Correct answer.
    2. Whenever the contracting officer issues any written suspension
    3. Only if the contractor proves the Government acted in bad faith
    4. Only when the suspension lasts longer than 180 continuous days

    Explanation

    The Suspension of Work clause allows an equitable adjustment when a suspension is unreasonable and causes an increase in cost or time. Reasonable suspensions are not compensable under that clause.

  137. Question 137Contract Execution, Modification, and Termination

    A contractor encounters a subsurface condition that differs materially from what the contract drawings indicated. Under the Differing Site Conditions clause, what is the contractor entitled to request?

    1. A default termination issued against the Government
    2. An equitable adjustment in price and time Correct answer.
    3. A termination for convenience
    4. A novation agreement

    Explanation

    A materially different subsurface condition of the type shown in the contract is a Type I differing site condition. The contractor must promptly notify the contracting officer and may request an equitable adjustment in price and time.

  138. Question 138Contract Execution, Modification, and Termination

    Which change is within the contracting officer's authority to order unilaterally under the Changes clause?

    1. Adding work that is entirely outside the original contract's scope
    2. Replacing the contractor with a different company
    3. A change to the method of performance within the contract's scope Correct answer.
    4. Settling a dispute over a prior termination

    Explanation

    The Changes clause permits the contracting officer to order changes within the general scope of the contract. Work outside the original scope requires a new procurement rather than a change order.

  139. Question 139Contract Execution, Modification, and Termination

    In an equitable adjustment for added work under the Changes clause, profit is generally allowed on which element?

    1. The contractor's increased material costs only
    2. Delay costs caused by the Government
    3. The work added by the change Correct answer.
    4. The entire original contract price

    Explanation

    Profit is generally allowed on the work added by a change because the contractor is performing additional work. Profit is not allowed on costs of delay or on the entire original contract price.

  140. Question 140Contract Execution, Modification, and Termination

    A contractor receives a contracting officer's final decision on a claim exceeding $100,000. To appeal to the appropriate board of contract appeals, within what period must the contractor file?

    1. 90 days of receiving the decision Correct answer.
    2. 12 months of receiving the decision
    3. 30 days of receiving the decision
    4. 6 months of receiving the decision

    Explanation

    Under the Contract Disputes Act, the contractor may appeal a contracting officer's final decision to a board of contract appeals within 90 days. Alternatively, the contractor may file suit in the Court of Federal Claims within 12 months.

  141. Question 141Contract Execution, Modification, and Termination

    The Government terminates a contract for default, but it is later determined that the contractor's failure was excusable. What is the usual result?

    1. The contractor must pay liquidated damages
    2. The contract is reinstated automatically
    3. The contractor is barred from any recovery
    4. It becomes a termination for convenience Correct answer.

    Explanation

    If a default termination is improper because the contractor's failure was excusable, the termination is generally converted to a termination for convenience. The contractor may then pursue a settlement for the terminated work.

  142. Question 142Contract Execution, Modification, and Termination

    In settling a termination for convenience, how is profit on work not yet performed treated?

    1. It is fully recoverable as anticipatory profit
    2. It is recoverable only if the contractor qualifies as a small business
    3. Generally not recoverable, but profit on completed work is allowed Correct answer.
    4. It is doubled as a penalty against the Government

    Explanation

    A convenience termination settlement compensates the contractor for work done and costs incurred, including profit on completed work. Anticipatory profit on work that was never performed is generally not recoverable.

  143. Question 143Contract Execution, Modification, and Termination

    A contractor submits a request for equitable adjustment exceeding $100,000 that will be treated as a claim under the Contract Disputes Act. What must accompany the request?

    1. A termination settlement proposal
    2. A novation agreement
    3. A certification signed by an authorized official Correct answer.
    4. A bid bond

    Explanation

    Claims exceeding $100,000 under the Contract Disputes Act must be certified by an authorized contractor official. The certification states that the claim is made in good faith and that the supporting data are accurate and complete to the best of the certifier's knowledge.

  144. Question 144Contract Execution, Modification, and Termination

    What is the purpose of the Limitation of Government Obligation clause in an undefinitized contract action?

    1. It allows the contractor to bill the full estimated price immediately
    2. It caps the Government's obligation until the action is definitized Correct answer.
    3. It waives the requirement for a contracting officer's signature
    4. It converts the UCA into a fixed-price contract automatically

    Explanation

    The Limitation of Government Obligation clause limits the Government's financial obligation to a stated amount until the undefinitized action is definitized. This protects the Government from unbounded liability before final pricing terms are agreed.

  145. Question 145Contract Execution, Modification, and Termination

    When a contractor fails to perform and the failure cannot be cured by the passage of time, which notice is appropriate before default termination?

    1. Show-cause notice Correct answer.
    2. Stop-work order
    3. Cure notice
    4. Letter of intent

    Explanation

    A show-cause notice is used when the contractor's failure is not curable through additional time. A cure notice is used when the failure is curable and the contractor can remedy it within a stated period.

  146. Question 146Contract Execution, Modification, and Termination

    Which action may a contracting officer take by unilateral administrative modification without the contractor's consent?

    1. Correcting a typographical error in the accounting classification citation Correct answer.
    2. Changing the specification to require a higher performance threshold
    3. Adding a requirement for an additional line item of supplies not previously described
    4. Extending the delivery schedule by ninety days at the contractor's request

    Explanation

    Administrative changes correct errors or make changes that do not affect the substantive rights of the parties, such as correcting typographical errors, changing the paying office, or revising accounting classification data. The contracting officer may make these unilaterally because the contractor's obligations are unchanged.

  147. Question 147Contract Execution, Modification, and Termination

    After the contracting officer issues a change order and the parties disagree about the amount of the equitable adjustment, what must the contractor do?

    1. Suspend all work under the contract and file an immediate appeal
    2. Stop work on the changed portion until the amount is agreed upon
    3. Perform the change and waive any adjustment not agreed within thirty days
    4. Continue performance of the contract as changed and pursue the adjustment later Correct answer.

    Explanation

    The Changes clause requires the contractor to proceed diligently with performance of the contract as changed while the amount of the adjustment is being resolved. The contractor preserves its right to an equitable adjustment by continuing work and submitting a proposal; refusing to perform changed work can support a default termination.

  148. Question 148Contract Execution, Modification, and Termination

    A contractor has just received a notice of termination for convenience and holds Government material and work in process. What must the contractor do with that property?

    1. Dispose of the material by scrapping it to avoid incurring further storage costs
    2. Continue producing finished end items until the final settlement amount is negotiated
    3. Ship all inventory to the Government's nearest receiving activity within twenty-four hours
    4. Protect and preserve the property in which the Government has or may acquire an interest Correct answer.

    Explanation

    The termination for convenience clause obligates the contractor to stop work and to protect and preserve property in its possession in which the Government has or may acquire an interest. Only the contracting officer may direct otherwise, and unauthorized disposal or continued production can render the related costs unallowable.

  149. Question 149Contract Execution, Modification, and Termination

    How does a contracting officer effect a termination for convenience?

    1. By a written notice that becomes effective only when the contractor acknowledges it in writing
    2. By an oral direction later confirmed in the termination settlement proposal
    3. By a bilateral supplemental agreement that both parties sign
    4. By a unilateral modification of the contract Correct answer.

    Explanation

    Termination for convenience is effected by a written notice to the contractor that is a unilateral modification of the contract. The contractor's consent is not required because the termination right is reserved in the clause, and the notice should specify the extent of the termination and its effective date.

  150. Question 150Contract Execution, Modification, and Termination

    A contractor fails to submit a termination settlement proposal within the period required by the termination clause. What may the contracting officer do?

    1. Forfeit the contract price for all completed work
    2. Refer the matter to the board of contract appeals for a decision
    3. Extend the period indefinitely until the contractor submits
    4. Determine the settlement amount unilaterally from available records Correct answer.

    Explanation

    If the contractor does not submit a settlement proposal within the required period, the contracting officer may determine the amount of the settlement on the basis of the information available. The contractor is not deprived of payment for its work, but it bears the risk created by an inadequate record.

  151. Question 151Contract Execution, Modification, and Termination

    The Government terminates a supply contract for default and reprocures the same items from another source at a higher price. What is the contractor's liability?

    1. The contractor is liable for the full price of the replacement contract
    2. The contractor is liable only for liquidated damages stated in the contract
    3. The contractor has no liability because the Government chose to reprocure
    4. The contractor is liable for the excess costs of the replacement contract Correct answer.

    Explanation

    Under the default clause, the Government may acquire similar supplies or services elsewhere and charge the contractor the excess costs, meaning the amount by which the replacement price exceeds the price of the terminated portion. The Government may also pursue any other remedy available to it.

  152. Question 152Contract Execution, Modification, and Termination

    After the parties execute a negotiated settlement agreement in a termination for convenience, what is the effect of that agreement?

    1. Either party may reopen it before final payment is made
    2. It is final and binding, but may be set aside for fraud or gross mistake Correct answer.
    3. The contractor may reopen it if it later discovers additional allowable costs
    4. It requires ratification by higher headquarters before it binds the Government

    Explanation

    A termination settlement agreement is itself a contract; once executed it is final and binding on both parties and settles all claims arising from the termination. It may be set aside only for fraud, gross mistake, or similar grounds.

  153. Question 153Contract Execution, Modification, and Termination

    A contract contains a liquidated damages clause of $500 per day. The contractor delivers forty days late and the Government proves no actual loss. What is the result?

    1. The clause is unenforceable because it penalizes the contractor
    2. No damages are due because the Government cannot prove actual harm
    3. Damages are capped at the contractor's actual profit on the contract
    4. The stated rate may be assessed without proof of actual loss Correct answer.

    Explanation

    Liquidated damages are an agreed forecast of the probable loss from delay, and the Government need not prove actual damages to assess them at the stated rate. The rate itself must be reasonable and not a penalty, or the clause will not be enforced.

  154. Question 154Contract Execution, Modification, and Termination

    A contractor proposes a value engineering change proposal that the contracting officer accepts and that will reduce the cost of performance. What is the general effect?

    1. The Government retains all savings and reimburses only proposal costs
    2. No price adjustment is made because the change is voluntary
    3. The contractor retains the entire savings because it originated the idea
    4. The contract price is reduced by the Government's share of the savings Correct answer.

    Explanation

    Under the Value Engineering clause, savings from an accepted proposal are shared between the parties according to the schedule stated in the clause. The contract is modified to reduce the price by the Government's share, which gives the contractor an incentive to propose cost reductions.

  155. Question 155Contract Execution, Modification, and Termination

    Which costs may a contractor include as settlement expenses in a termination for convenience proposal?

    1. Costs of finished goods the contractor produced after the effective date of termination
    2. Attorney fees for prosecuting a claim against the Government
    3. Accounting and clerical costs necessary to prepare the settlement proposal Correct answer.
    4. Anticipated profit on the work that was not performed

    Explanation

    Settlement expenses include the reasonable accounting, legal, clerical, and other costs necessary to prepare and support the settlement proposal, along with the costs of settling subcontractor claims. They do not extend to the costs of prosecuting a claim or to profit on work never performed.

  156. Question 156Contract Execution, Modification, and Termination

    How are a contractor's costs of settling its subcontractors' termination claims treated in a termination for convenience settlement?

    1. They are allowed only if the contracting officer approves each subcontract individually in advance
    2. They are allowable to the extent the costs would be allowable if incurred by the prime Correct answer.
    3. They are allowed in full regardless of whether the charges are reasonable or allocable
    4. They are never allowed because the subcontractors have no privity with the Government

    Explanation

    The prime contractor may include the reasonable costs of settling and paying subcontractor termination claims, provided those costs would be allowable had the prime incurred them directly. The prime must review and settle the subcontractor claims and support the amounts passed through.

  157. Question 157Contract Execution, Modification, and Termination

    Which contract action requires the contractor's signature to be effective?

    1. A notice terminating the contract for convenience
    2. A supplemental agreement adjusting the contract price Correct answer.
    3. A change order issued under the Changes clause
    4. A stop-work order

    Explanation

    A bilateral modification, or supplemental agreement, is used when a modification requires the mutual assent of the parties, such as a negotiated price adjustment, and is signed by both the contractor and the contracting officer. Unilateral modifications, such as change orders and termination notices, are signed only by the contracting officer.

  158. Question 158Contract Execution, Modification, and Termination

    A contracting officer directs the contractor to perform work that is so far beyond the scope of the original contract that it constitutes a cardinal change. What is the contractor's position?

    1. The contractor must perform and may only seek an equitable adjustment
    2. The contractor must perform if the change is valued at less than the contract price
    3. The contractor may treat the direction as a breach and decline to perform Correct answer.
    4. The contractor must perform because the Changes clause covers all directions

    Explanation

    The Changes clause authorizes only changes within the general scope of the contract, and a change that fundamentally alters the contract exceeds that authority. When a direction amounts to a cardinal change, the contractor may decline to perform and pursue a breach claim rather than being confined to an equitable adjustment.

  159. Question 159Contract Execution, Modification, and Termination

    The contractor is entitled to a time extension because of an excusable delay, but the contracting officer refuses to grant it and insists that the original completion date be met, causing the contractor to incur overtime costs. How is this situation characterized?

    1. An excusable delay that bars any recovery of the added costs
    2. A cardinal change requiring a new procurement
    3. A suspension of work that requires a formal stop-work order from the contracting officer
    4. A constructive acceleration entitling the contractor to acceleration costs Correct answer.

    Explanation

    Constructive acceleration occurs when the contractor is entitled to a time extension, the Government refuses to grant it and demands performance by the original date, and the contractor incurs extra costs to speed performance. The contractor may recover those acceleration costs through an equitable adjustment.

  160. Question 160Contract Execution, Modification, and Termination

    A contractor wants to challenge the Government's decision to terminate its contract for convenience, arguing that the agency could have continued the program. What standard generally applies?

    1. The termination automatically converts to a default termination at the contractor's election
    2. The termination is invalid unless the agency issues a written justification to Congress
    3. It is presumed valid absent clear evidence of bad faith or abuse of discretion Correct answer.
    4. The contractor prevails whenever it can show that the termination reduced its expected profit

    Explanation

    The contracting officer has broad discretion to terminate for convenience when it is in the Government's interest, and the decision carries a presumption of good faith. A challenge succeeds only with clear evidence of bad faith or an abuse of discretion; a showing that the work could have continued is not enough.

  161. Question 161Special Contracting Methods and Business Relationships

    Which characteristic defines an indefinite-delivery/indefinite-quantity (IDIQ) contract?

    1. It may be used only when every line item is a commercial item
    2. It requires a separate new contract to be awarded for each order placed
    3. It provides for an indefinite quantity, within stated limits, during a fixed period Correct answer.
    4. It fixes both the quantity and the delivery schedule at the time of award

    Explanation

    An IDIQ contract provides for an indefinite quantity, within stated limits, of supplies or services during a fixed period, with the Government obligated to order at least a stated minimum. FAR 16.504 authorizes this arrangement when the exact quantities or delivery times cannot be determined at award.

  162. Question 162Special Contracting Methods and Business Relationships

    Which method allows an agency to buy at pre-negotiated prices from contracts awarded by GSA without running a new full and open competition?

    1. Conducting a sealed bid opening
    2. Awarding a sole-source contract with no documentation
    3. Placing an order under a Federal Supply Schedule contract Correct answer.
    4. Issuing a letter contract to the lowest bidder

    Explanation

    Federal Supply Schedule contracts are established by GSA through a competitive process, and ordering agencies then place orders against them under FAR subpart 8.4 without conducting a new full and open competition. The orders must still be placed in accordance with the schedule's ordering procedures.

  163. Question 163Special Contracting Methods and Business Relationships

    Which contract type provides for acquiring services on the basis of direct labor hours at specified fixed hourly rates plus materials at cost?

    1. Time-and-materials Correct answer.
    2. Cost-plus-fixed-fee
    3. Firm-fixed-price
    4. Labor-hour

    Explanation

    FAR 16.601 defines a time-and-materials contract as providing for direct labor hours at specified fixed hourly rates and for materials at cost. A labor-hour contract is the same arrangement without the materials element.

  164. Question 164Special Contracting Methods and Business Relationships

    Which statement describes an other transaction (OT) agreement?

    1. It must be awarded using sealed bidding procedures
    2. It requires the submission of certified cost or pricing data
    3. It may be used only to buy commercial items
    4. It is generally exempt from the FAR and most procurement statutes Correct answer.

    Explanation

    Other transactions are agreements entered into under authorities such as 10 U.S.C. 4021 and 4022 that are generally not subject to the FAR or most procurement statutes and regulations. The parties negotiate the terms that govern the effort.

  165. Question 165Special Contracting Methods and Business Relationships

    Under the SBIR program, what rights does the small business concern generally retain in inventions made under the award?

    1. Only the right to use the invention in its own commercial operations
    2. No rights, because the Government takes sole title
    3. Joint ownership with the awarding agency
    4. Title to the invention, with a license to the Government Correct answer.

    Explanation

    SBIR policy allows the small business to retain title to inventions and rights in technical data developed under the award, while the Government receives a license and certain march-in rights. Retaining intellectual property is a central incentive of the program.

  166. Question 166Special Contracting Methods and Business Relationships

    Which statement about commercial item acquisitions under FAR Part 12 is correct?

    1. Only sealed bidding procedures may be used
    2. They are limited to purchases below the simplified acquisition threshold
    3. Certified cost or pricing data is always required
    4. They use streamlined procedures and customary commercial terms Correct answer.

    Explanation

    FAR Part 12 provides streamlined solicitation, evaluation, and contract administration procedures for commercial items and allows customary commercial terms and reduced data requirements. It applies at all dollar values, not only to small purchases.

  167. Question 167Special Contracting Methods and Business Relationships

    Under DoD policy, an undefinitized contract action must be definitized no later than how long after it is issued?

    1. 30 days
    2. 180 days Correct answer.
    3. One year
    4. 60 days

    Explanation

    DFARS 217.7404-1 requires the contracting officer to definitize an undefinitized contract action within 180 days after issuance, and the contractor is required to submit its definitization proposal within 60 days. These limits protect the Government from prolonged performance without agreed terms.

  168. Question 168Special Contracting Methods and Business Relationships

    Which contract type pays a fee that the Government determines unilaterally based on periodic evaluation of performance against stated criteria?

    1. Cost-plus-incentive-fee
    2. Cost-plus-award-fee Correct answer.
    3. Firm-fixed-price incentive
    4. Cost-plus-fixed-fee

    Explanation

    In a cost-plus-award-fee contract the fee consists of a base fee plus an award amount that the Government determines unilaterally from periodic evaluations against award-fee criteria. FAR 16.401 establishes the use and administration of these arrangements.

  169. Question 169Special Contracting Methods and Business Relationships

    Under the FAR definition, a multi-year contract may cover a period of performance of no more than how many years?

    1. Three years
    2. Ten years
    3. Five years Correct answer.
    4. Two years

    Explanation

    FAR 17.104 defines a multi-year contract as covering more than one year but not more than five years, and its use requires that funds be available to cover the first year's performance. The approach is intended to reduce administrative costs and secure lower prices for recurring requirements.

  170. Question 170Special Contracting Methods and Business Relationships

    Which statement describes a blanket purchase agreement?

    1. It must be awarded to the lowest-priced offeror in every case
    2. It is a binding contract for a fixed quantity of supplies
    3. It may be used only for construction services
    4. It establishes charge accounts for anticipated repetitive needs Correct answer.

    Explanation

    FAR 13.303 describes a blanket purchase agreement as a simplified method of filling anticipated repetitive needs for supplies or services by establishing charge accounts with qualified sources. BPAs may be established under the simplified acquisition procedures or under Federal Supply Schedule contracts.

  171. Question 171Special Contracting Methods and Business Relationships

    In a reverse auction, how does price competition occur?

    1. Suppliers bid progressively lower prices during the auction Correct answer.
    2. Buyers submit successively higher offers to suppliers
    3. A single supplier negotiates a price directly with the Government
    4. The Government lowers its estimate as offers arrive

    Explanation

    In a reverse auction, offerors compete by submitting successively lower prices within a defined period, and the lowest bid at closing generally prevails. This is the opposite of a conventional auction, in which buyers bid prices upward.

  172. Question 172Special Contracting Methods and Business Relationships

    In a cost-plus-incentive-fee contract, how is the final fee determined?

    1. By applying an incentive formula to actual versus target cost Correct answer.
    2. Through a unilateral determination by the contracting officer
    3. From the contractor's self-assessment of its performance
    4. As a fixed percentage of the final negotiated price

    Explanation

    In a cost-plus-incentive-fee contract the fee is adjusted by an incentive formula that compares final allowable cost with the target cost. The fee rises as cost falls below target and falls as cost exceeds target, within the contract's adjustment limits.

  173. Question 173Special Contracting Methods and Business Relationships

    Before using a cost-reimbursement contract, the contracting officer must determine that which condition is present?

    1. The work will be performed at Government facilities
    2. The contractor has an adequate accounting system Correct answer.
    3. The contractor has furnished a performance bond
    4. The requirement is fully and clearly definable at the time of award

    Explanation

    FAR 16.301-2 and 16.301-3 require the contracting officer to determine that the contractor's accounting system is adequate for determining costs applicable to the contract and that cost estimates can be developed, among other conditions. These safeguards are necessary because the Government is reimbursing allowable costs.

  174. Question 174Special Contracting Methods and Business Relationships

    What is the principal objective of the DoD mentor-protege program?

    1. To provide small firms with direct set-aside contracts
    2. To allow large firms to avoid competitive procedures
    3. To help small businesses build capacity through large-firm assistance Correct answer.
    4. To exempt large firms from subcontracting plan requirements

    Explanation

    The mentor-protege program pairs eligible small businesses with large firms that provide developmental assistance such as technical, financial, and management support. The goal is to increase the small firm's ability to compete successfully for federal and commercial work.

  175. Question 175Special Contracting Methods and Business Relationships

    Which document supports an order that is restricted to one source under a Federal Supply Schedule contract and exceeds the simplified acquisition threshold?

    1. A just-in-time delivery plan
    2. A limited-sources justification Correct answer.
    3. A certificate of current cost or pricing data
    4. A DD Form 254

    Explanation

    FAR 8.405-6 requires a limited-sources justification, approved at the level corresponding to the value of the order, when an order under a schedule contract is restricted to one source and exceeds the simplified acquisition threshold. The justification must explain why no other schedule contractor can meet the need.

  176. Question 176Special Contracting Methods and Business Relationships

    Which clause lets the Government extend services for up to six months at the rates in effect at the time of extension?

    1. Option to extend services Correct answer.
    2. Option to increase quantity
    3. Stop-work order
    4. Changes-fixed-price

    Explanation

    FAR 52.217-8 permits the Government to extend services for up to six months after contract expiration, at the rates in effect at the time of extension, to avoid a lapse in performance. Use of the clause must be evaluated and funded like any other extension.

  177. Question 177Special Contracting Methods and Business Relationships

    Which element is essential to a performance-based acquisition?

    1. Use of a cost-plus-fixed-fee contract in every case
    2. A detailed statement of how the work is to be performed
    3. Measurable performance standards tied to outcomes Correct answer.
    4. Government direction of the contractor's workforce

    Explanation

    Performance-based acquisitions describe the required results and establish measurable performance standards, leaving the means and methods to the contractor. FAR subpart 37.6 requires an assessment of performance against those standards.

  178. Question 178Special Contracting Methods and Business Relationships

    What must a time-and-materials contract establish to protect the Government?

    1. A guaranteed minimum number of labor hours
    2. A ceiling price that the contractor exceeds at its own risk Correct answer.
    3. An award fee pool based on performance
    4. A fixed profit percentage applied to materials

    Explanation

    FAR 16.601(d) requires a time-and-materials contract to include a ceiling price that the contractor exceeds at its own risk, and the contracting officer must monitor progress. If the ceiling is reached without completion, the contracting officer must evaluate whether a change in contract type is warranted.

  179. Question 179Special Contracting Methods and Business Relationships

    How does an award-term arrangement reward a contractor for strong performance?

    1. By extending the period of performance for good results Correct answer.
    2. By reducing the contract's reporting requirements
    3. By reimbursing a share of documented cost savings
    4. By paying an additional fee based on evaluated performance

    Explanation

    In an award-term arrangement, the contractor earns additional periods of performance based on performance evaluations rather than additional fee. FAR 16.401(e) addresses award-term contracting as a tool for incentivizing sustained performance.

  180. Question 180Special Contracting Methods and Business Relationships

    Under DFARS 217.7404-4, how much of the estimated cost of an undefinitized contract action may be obligated before definitization?

    1. 75 percent
    2. 100 percent
    3. 50 percent Correct answer.
    4. 25 percent

    Explanation

    DFARS 217.7404-4 generally limits obligation before definitization to 50 percent of the estimated cost of the undefinitized action, with narrow exceptions. The limit preserves the Government's negotiating leverage and reduces performance at unsettled prices.

  181. Question 181Special Contracting Methods and Business Relationships

    In a share-in-savings contract, how does the contractor earn its compensation?

    1. Through a fixed price established at award
    2. Through a fee based on subjective Government evaluation
    3. Through reimbursement of all allowable costs plus a fixed fee
    4. From a share of the savings the contractor produces for the agency Correct answer.

    Explanation

    In a share-in-savings arrangement, the contractor is paid from a portion of the savings its solutions generate for the agency, so compensation depends on realized results rather than on effort alone. The structure is intended to align the contractor's incentives with the agency's cost-reduction goals.

  182. Question 182Special Contracting Methods and Business Relationships

    Under 10 U.S.C. 4022, a follow-on production contract may be awarded to an other transaction participant without further competition when which condition is met?

    1. The competitive transaction provided for follow-on production and the prototype was completed successfully Correct answer.
    2. The agency determines that competition would take too long
    3. The prototype was awarded on a sole-source basis to a traditional defense contractor
    4. The participant is a large business with an approved accounting system

    Explanation

    The statute permits a follow-on production contract or transaction without further competition when the original transaction for the prototype project was competitively awarded, the transaction provided for follow-on production, and the participant successfully completed the prototype. This preserves competition at the prototype stage while allowing efficient transition to production.

  183. Question 183Special Contracting Methods and Business Relationships

    For a cost-plus-fixed-fee contract that does not involve experimental or development work, the fixed fee may not exceed what percentage of estimated cost?

    1. 25 percent
    2. 15 percent
    3. 20 percent
    4. 10 percent Correct answer.

    Explanation

    FAR 15.404-4(c)(4)(i) limits the fee in a cost-plus-fixed-fee contract to 10 percent of the estimated cost, excluding fee, and allows up to 15 percent for experimental, developmental, or research work. The limits apply to the fee negotiated at award and to later fee adjustments.

  184. Question 184Special Contracting Methods and Business Relationships

    Which statement correctly describes the Government's obligation under a requirements contract?

    1. The Government must fill all of its actual requirements for the listed items by ordering from the contractor during the contract period. Correct answer.
    2. The Government must order one fixed quantity of the listed items regardless of what its actual needs turn out to be.
    3. The Government must order a stated minimum quantity but is barred from ordering any additional quantity.
    4. The Government may satisfy its needs from any source and places orders only when it chooses to do so.

    Explanation

    Under FAR 16.503, a requirements contract obligates the Government to fill all of its actual purchase requirements for the specified items from the named contractor during the contract period, and obligates the contractor to furnish them. Only a stated minimum, if one is specified, is a guaranteed quantity.

  185. Question 185Special Contracting Methods and Business Relationships

    In an indefinite-quantity contract, what is the significance of the minimum quantity stated in the schedule?

    1. It is the quantity the contractor may elect to deliver when it has available capacity.
    2. It is used only to evaluate offers and creates no obligation on either party.
    3. It is the quantity the Government is obligated to order and the contractor is obligated to furnish. Correct answer.
    4. It fixes the maximum quantity the Government may order during the ordering period.

    Explanation

    An indefinite-quantity contract requires the Government to order at least the stated minimum quantity and requires the contractor to furnish that quantity (FAR 16.504). If the Government orders less than the minimum over the contract period, the contractor may be entitled to a price adjustment for the shortfall.

  186. Question 186Special Contracting Methods and Business Relationships

    A multiple-award indefinite-delivery contract has ten awardees. The requiring activity needs the incumbent to keep a critical effort running without a break in service while a competitive follow-on order is prepared. Which basis allows the contracting officer to place the order without providing fair opportunity to all awardees?

    1. The order will be paid with funds from more than one fiscal year.
    2. The incumbent's proposed price is the lowest among the ten awardees.
    3. The order value is above the micro-purchase threshold but below the simplified acquisition threshold.
    4. The order is a logical follow-on to orders already issued under the contract. Correct answer.

    Explanation

    FAR 16.505(b)(2) lists the limited circumstances in which an order may be placed without fair opportunity, including an urgent need, a logical follow-on to an order already issued, and a situation where only one awardee is capable of meeting the requirement. Price position or funding mix is not among the exceptions.

  187. Question 187Special Contracting Methods and Business Relationships

    An agency plans a contract with a 3-year basic period and four 2-year options. Which statement about this arrangement is correct?

    1. No special approval is needed because each individual option period is two years or less.
    2. The arrangement is prohibited because option periods may never extend performance beyond five years.
    3. Agency head approval is needed because the basic period plus all option periods exceeds ten years. Correct answer.
    4. No special approval is needed because the option periods alone total less than ten years when the basic period is excluded.

    Explanation

    FAR 17.204(e) prohibits exercising an option that would cause the total of the basic and option periods to exceed ten years unless the agency head approves the longer arrangement. The limit is measured across the entire potential performance period, not option by option.

  188. Question 188Special Contracting Methods and Business Relationships

    Which statement best describes a Governmentwide acquisition contract (GWAC)?

    1. A contract any agency may use to buy any supply or service without paying an ordering fee.
    2. An agreement outside the FAR used to prototype technology with nontraditional firms.
    3. A single-agency contract that other agencies may use only through an Economy Act arrangement.
    4. A task-order or delivery-order contract for information technology that one agency establishes for Governmentwide use. Correct answer.

    Explanation

    A GWAC is defined in FAR 2.101 as a task-order or delivery-order contract for information technology established by one agency for Governmentwide use, typically operated with a fee structure for ordering activities. It is a contract vehicle subject to the FAR, not a non-procurement agreement.

  189. Question 189Special Contracting Methods and Business Relationships

    A DoD component wants another agency to perform an assisted acquisition under the Economy Act. Before the servicing agency proceeds, the requesting agency must do which of the following?

    1. Transfer procurement authority to the servicing agency permanently through a signed memorandum of agreement.
    2. Waive the competition requirements of the Competition in Contracting Act for the servicing agency.
    3. Obtain a GAO decision approving the interagency agreement before any funds are transferred.
    4. Determine that the action is in the Government's best interest, that the work cannot be obtained as conveniently or economically by contracting directly, and that the action is authorized by law. Correct answer.

    Explanation

    FAR 17.502-1 requires the requesting agency, before placing an order or executing a reimbursable agreement under the Economy Act, to make a determination and finding covering best interest, availability of the work through direct contracting, and legal authority. The servicing agency then performs the acquisition on a reimbursable basis.

  190. Question 190Special Contracting Methods and Business Relationships

    How does the Small Business Technology Transfer (STTR) program differ from the SBIR program?

    1. STTR awards may be made only by DoD and only as other transaction agreements.
    2. STTR does not require the awardee to qualify as a small business concern.
    3. STTR requires formal cooperation between the small business concern and a U.S. nonprofit research institution. Correct answer.
    4. STTR requires the small business concern to be a woman-owned concern.

    Explanation

    The STTR program requires the small business concern to partner with a U.S. nonprofit research institution, such as a university, and to allocate a defined share of the work to that partner. SBIR, by contrast, requires the work to be performed by the small business concern itself.

  191. Question 191Special Contracting Methods and Business Relationships

    Which statement about Phase III of the SBIR program is correct?

    1. It must be awarded within 12 months after the related Phase II award expires.
    2. It may be awarded without further competition and may be funded from non-SBIR sources, including a production contract. Correct answer.
    3. It may be funded only with the agency's SBIR set-aside funds.
    4. It must be competed among the agency's prior Phase II awardees before it can be awarded.

    Explanation

    Phase III covers work that derives from, extends, or completes efforts under prior SBIR awards and is funded by non-SBIR sources such as a program of record or a production contract. Because the Phase I and Phase II competition already occurred, Phase III may be awarded without further competition.

  192. Question 192Special Contracting Methods and Business Relationships

    A cooperative agreement is the appropriate award instrument when which condition exists?

    1. The agency is leasing office space from a commercial landlord.
    2. The agency is buying commercial items at fixed prices from a catalog.
    3. The Government needs a defined service delivered on a fixed schedule with no Federal involvement in performance.
    4. The principal purpose is to transfer something of value to a recipient to accomplish a public purpose, with substantial Federal involvement expected. Correct answer.

    Explanation

    Cooperative agreements are assistance instruments used when the principal purpose is to transfer funds, property, or services to a recipient to accomplish a public purpose and substantial Federal involvement in the funded activity is anticipated. Where the Government is the direct beneficiary of goods or services, a procurement contract is required.

  193. Question 193Special Contracting Methods and Business Relationships

    Which statement describes a basic ordering agreement (BOA)?

    1. It is a written understanding of terms and clauses that applies to future contracts but procures nothing by itself. Correct answer.
    2. It may be used only to buy commercial items from Federal Supply Schedule contractors.
    3. It requires the contractor to accept every order the Government later places.
    4. It is a contract that obligates funds as soon as it is signed by both parties.

    Explanation

    FAR 16.703 describes a BOA as a written instrument of understanding, negotiated between an agency and a contractor, that contains terms and clauses applying to future contracts and describes the method for placing orders. It is not a contract and does not itself procure supplies or services or obligate funds.

  194. Question 194Special Contracting Methods and Business Relationships

    Under a DoD Commercial Solutions Opening (CSO), how are offerors' solutions generally evaluated and awards made?

    1. Only the lowest-priced solution may be selected, and technical merit may not be considered.
    2. Solutions are evaluated against announced areas of interest through a merit-based, often phased, process, and awards may fund prototypes or research. Correct answer.
    3. Each offeror must post a bid guarantee equal to 20 percent of its proposed price.
    4. Proposals must be evaluated under FAR Part 15, and each offeror must submit certified cost or pricing data.

    Explanation

    DFARS 212.70 permits a CSO as a competitive procedure for innovative commercial technologies, products, or services, using merit-based review against announced areas of interest that often proceeds in phases. Awards may take the form of a FAR contract or a prototype other transaction, depending on the authority used.

  195. Question 195Special Contracting Methods and Business Relationships

    Which acquisition requires the contractor to submit a subcontracting plan?

    1. A $2 million contract awarded to a small business concern.
    2. A $700,000 contract awarded to a large business that has subcontracting possibilities.
    3. A $2 million contract awarded to a large business that has subcontracting possibilities. Correct answer.
    4. A $600,000 contract awarded to a large business that has subcontracting possibilities.

    Explanation

    FAR 19.702 requires a subcontracting plan from other than small business concerns on contracts expected to exceed the stated threshold (currently $750,000) that offer subcontracting possibilities. Awards to small business concerns and awards below the threshold do not require a plan.

  196. Question 196Special Contracting Methods and Business Relationships

    Which statement describes a cooperative research and development agreement (CRADA)?

    1. An agreement used to buy commercial items on the Government's behalf.
    2. A Federal laboratory and a non-Federal party collaborate on research, with the partner typically providing resources and gaining rights in developed inventions. Correct answer.
    3. A grant that reimburses the partner's research costs and adds a fixed fee.
    4. A procurement contract awarded competitively to buy research services for the Government.

    Explanation

    A CRADA is a non-procurement agreement under which a Federal laboratory and a non-Federal collaborator share personnel, facilities, or equipment to conduct research, with the collaborator usually contributing resources and receiving rights to inventions it develops. It cannot be used to procure goods or services for the Government.

  197. Question 197Special Contracting Methods and Business Relationships

    Which situation describes bundling?

    1. Awarding two or more contracts to the same contractor under a single solicitation.
    2. Consolidating requirements that were previously performed under separate smaller contracts and that are not suitable for award to a small business because of diversification, size, or geographic dispersion. Correct answer.
    3. Combining requirements solely to reduce the number of contracting offices involved.
    4. Setting aside a single requirement for exclusive small business participation.

    Explanation

    FAR 2.101 defines bundling as consolidating two or more requirements for supplies or services previously provided or performed under separate smaller contracts into a solicitation for a single contract that is likely to be unsuitable for award to a small business. It triggers specific analysis and justification requirements because of its effect on small business participation.

  198. Question 198Special Contracting Methods and Business Relationships

    When an agency intends to satisfy a requirement by placing an order under a multiple-award contract, how is the rule of two applied?

    1. It does not apply because the underlying contracts were already competed among all offerors.
    2. It applies only when the order exceeds $5 million and the agency head approves it in writing.
    3. The contracting officer considers whether two or more small business awardees can meet the requirement and, if so, may set the order aside for small business. Correct answer.
    4. It requires the order to be placed with whichever small business awardee submitted the lowest price.

    Explanation

    FAR 19.502-4 provides that the rule of two applies at the order level under multiple-award contracts: the contracting officer determines whether at least two small business awardees can meet the requirement and, if so, may set aside the order or use a small business reserve. The analysis is done requirement by requirement as orders are issued.

DAWIA Contracting flashcards

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Market Research
FAR Part 10 requires agencies to conduct market research before developing requirements or soliciting offers to determine commercial availability, customary terms, and small business capability.
Acquisition Plan
A written plan required for acquisitions at or above the simplified acquisition threshold; it documents the competition approach, contract type, source selection method, milestones, and risk mitigation.
Firm-Fixed-Price Contract
Places maximum risk on the contractor for cost performance and is suitable when requirements are clearly defined, performance risk is low, and cost allowability rules do not apply.
Cost-Reimbursement Contract
Pays allowable incurred costs up to a stated estimated total, requires an adequate accounting system, and limits fee to a percentage of estimated cost; it is not used for commercial items.
Simplified Acquisition Threshold
Currently $250,000; acquisitions at or below it use streamlined procedures and reduced synopsis requirements and are reserved for small business concerns unless not practicable.
Order of Precedence Clause
FAR 52.215-8 resolves conflicts in a contract: the schedule, solicitation provisions, specifications and drawings, attachments, and the contractor's proposal govern in that order.
Responsibility Determination
Under FAR 9.104-1 a prospective contractor must affirmatively demonstrate capability, capacity, credit, integrity, tenacity, and adequate past performance before award is made.
Certificate of Competency
An SBA certificate that certifies a small business concern's responsibility and overrides a contracting officer's nonresponsibility determination, except on limited grounds such as lack of integrity.
Sealed Bid Responsiveness
A sealed bid must conform to the invitation's material terms at bid opening; a materially nonconforming bid is rejected and generally cannot be corrected after opening.
GAO Bid Protest Deadline
A protest must be filed within 10 days of when the protester knew or should have known the basis, or 10 days after a requested postaward debriefing.
Competitive Range
Comprises the most highly rated proposals; the contracting officer conducts discussions with all offerors in the range and may limit the range for efficiency.
Two-Step Sealed Bidding
Step one evaluates unpriced technical proposals; step two invites priced bids only from offerors whose technical proposals were found acceptable, with award made on price.
Miller Act Bonds
Construction contracts exceeding $150,000 require performance and payment bonds; acceptable alternatives include irrevocable letters of credit or a tripartite escrow agreement.
Cost Reasonableness
A cost is reasonable if it does not exceed what a prudent person would incur under competitive circumstances; FAR 31.201-3 lists factors such as prudence and market prices.
Certified Cost or Pricing Data
Required for negotiated contracts over $2 million unless an exception applies, such as adequate price competition, commercial item acquisition, catalog prices, or an approved waiver.
Defective Pricing
Occurs when certified cost or pricing data were inaccurate, incomplete, or not current as of agreement on price; the government recovers the resulting overpayment plus interest.
Weighted Guidelines
The FAR 15.404-4 method for establishing profit or fee that weighs performance risk, contract type, cost risk, investment, and cost-efficiency factors.
Provisional Billing Rates
Temporary indirect cost rates used to pay invoices during performance; they are later audited and replaced by final rates that settle allowable incurred costs.
Limitation of Cost Clause
Requires the contractor to notify the contracting officer when costs approach the estimated total and limits government liability beyond that amount absent notification and additional funding.
Prompt Payment Act
Requires agencies to pay proper invoices within 30 days of receipt, adds interest penalties for late payment, and encourages capture of early-payment discounts.
Changes Clause
Permits the contracting officer to order changes within the contract's general scope unilaterally; the contractor then submits a proposal for an equitable adjustment in price or time.
Constructive Change
Government conduct such as defective specifications, unauthorized direction, or unreasonable inspection that has the effect of a formal change order and supports an equitable adjustment claim.
Termination for Convenience
The government may terminate when in its interest; the contractor recovers allowable costs, work performed, settlement expenses, and profit on work done, but no anticipatory profit.
Termination for Default
A breach-based termination; the government may reprocure and charge excess costs, but excusable delay or improper notice may convert it to a termination for convenience.
Novation Agreement
A tripartite agreement among the government, transferor, and transferee recognizing a successor in interest after a merger, sale, or transfer of assets.
Contract Disputes Act
Governs contract claims; the contracting officer issues a final decision appealable to a board within 90 days or to the Court of Federal Claims within 12 months.
Fair Opportunity (IDIQ)
Orders under multiple-award IDIQ contracts must generally be competed among awardees; exceptions include urgency, sole source, and logical follow-on of a prior order.
GSA Schedule Ordering
Under FAR Subpart 8.4, agencies issue RFQs to schedule contractors, obtain at least three quotes when practicable, and document the basis for selection.
Option Period Limit
FAR 17.204(e) generally limits the basic period plus all option periods to five years unless a specific statutory or regulatory exception applies.
Other Transaction Authority
Agreements outside the FAR, authorized by 10 U.S.C. 2371b for prototype projects with nontraditional contractors, which may lead to follow-on production without further competition.
Mentor-Protégé Program
Allows an approved mentor to assist a protégé small business and permits the resulting joint venture to be treated as small for covered procurements.
Task Order Protest
GAO jurisdiction over task and delivery orders is limited to orders above a statutory dollar threshold or allegations that an order exceeds the contract's scope, period, or maximum value.

DAWIA Contracting study guide

Contract Principles and Planning

Framework and planning

Contracting begins with the FAR system and the principle that the government buys only what it needs, when it needs it, using the right appropriation. Candidates should know competition requirements (full and open competition, the limited exceptions, and the J&A process), market research, acquisition planning, and the requirement that specifications be stated functionally where practical. Fiscal-law concepts are heavily tested: the purpose statute, the bona fide need rule, the Antideficiency Act, and the time, matter, and amount tests. Distinguish severable services (ongoing, divisible) from nonseverable services (a single undertaking); the bona fide need for severable services may permit a limited crossover of fiscal years, but that is not a general license to stockpile funds.

Contract type selection is risk allocation. Firm-fixed-price fits well-defined requirements and stable performance; cost-reimbursement fits uncertain development work but requires adequate contractor accounting and government surveillance. Incentive and award-fee arrangements sit between them. A common trap is treating contract type as a label rather than a risk decision, or assuming the lowest-price type is always preferred.

Rule of thumb / worked example: if the statement of work is a one-time, well-understood service and the contractor can control cost, choose FFP and evaluate price; if the work is research with unknown technical risk and the contractor's accounting system is adequate, consider cost-plus-fixed-fee and evaluate cost realism. Always test the appropriation against bona fide need before funding a crossover.

Contract Formation and Award

Solicitation to award

Formation turns on the solicitation method and the evaluation rules stated in it. Sealed bidding uses an IFB, award to the responsive, responsible bidder whose bid is lowest, and price is the only evaluation factor. Negotiated acquisition uses an RFP and permits tradeoff or LPTA source selection; the evaluation factors must be stated in the solicitation and followed. RFQs are used for simplified acquisitions or commercial items. Know the difference between responsiveness (whether the offer conforms to the solicitation's material terms) and responsibility (whether the offeror can perform). Responsiveness is judged at bid opening for sealed bids; responsibility is judged for all offerors.

Traps: treating clarifications as discussions; conducting unequal discussions; allowing a late proposal without a valid exception; awarding to a nonresponsive bidder because the price is low; using LPTA when the solicitation requires a tradeoff; and ignoring SAM registration or integrity and ethics issues. Debriefings and protest timelines are also tested.

Worked example: an RFP says award will be made without discussions. The contracting officer may still seek clarifications of minor or clerical errors, but must not permit offerors to revise proposals or cure material omissions; doing so converts the exchange into discussions and triggers the requirement to hold discussions with all offerors in the competitive range. Rule of thumb: if the exchange changes price, technical approach, or material terms, it is a discussion.

Contract Administration and Pricing

Administration and pricing

Administration covers performance management and the reasonableness of price. Price analysis compares prices without examining cost elements (catalog prices, prior prices, competition, market research). Cost analysis examines cost elements and requires contractor data, often certified cost or pricing data above the current TINA threshold unless an exception applies (commercial items, adequate competition, modification of a prior certified action, and similar exceptions). Cost principles ask whether a cost is allowable, reasonable, and allocable; unallowable costs include entertainment, fines, and certain lobbying. CAS applies to covered contracts and can create cost-accounting-change adjustments. Profit or fee is negotiated separately and must be reasonable.

Traps: using cost analysis when price analysis is sufficient; demanding certified data when an exception applies; confusing audit findings with final determinations; treating DCAA as the decision-maker (the CO decides); and ignoring limitations on pass-through charges or subcontractor cost. Invoicing, acceptance, inspection, GFP, and liquidated damages are administrative issues that often appear as scenario questions.

Worked example: a CO receives a $5 million proposal for a noncommercial service with only one offeror. Competition is inadequate, the item is not commercial, and no exception fits, so certified cost or pricing data are required; the CO performs cost analysis, uses DCAA audit support, negotiates profit, and documents the negotiation. Rule of thumb: price analysis first; cost analysis only when price alone is not sufficient.

Contract Execution, Modification, and Termination

Execution, changes, termination

The changes clause lets the CO order changes within the general scope of the contract, unilaterally if necessary. The contractor must continue performance and submit a request for equitable adjustment within the stated period; a constructive change can arise from defective specifications, overzealous inspection, or direction outside the contract. A cardinal change--one that fundamentally alters the contract--is outside the clause and requires a new procurement. Bilateral supplemental agreements are used when both parties agree; unilateral change orders are used under a changes clause. The Disputes clause governs claims and appeals.

Termination for convenience (T4C) is a government right; the contractor recovers work done, preparation, and a reasonable profit on work performed, but not anticipatory profit. Termination for default (T4D) is for contractor failure and can expose the contractor to excess reprocurement costs, unless the failure is excusable. Distinguish T4C from T4D and know the notice and settlement procedures.

Worked example: the CO directs the contractor to add a new site not contemplated by the SOW. If the addition is within the contract's general scope, the CO may issue a unilateral change order and the contractor submits an REA. If it is a cardinal change, the CO must create a new acquisition. Rule of thumb: scope, not dollar value, determines whether the changes clause applies.

Special Contracting Methods and Business Relationships

Special methods and relationships

Special contracting methods expand or alter normal procedures. IDIQ contracts provide for indefinite quantities during a stated ordering period; multiple-award IDIQ contracts require fair opportunity to be given to all awardees unless an exception applies. Options are priced and evaluated at award and exercised unilaterally when the government chooses; they are not automatic renewals. BPAs, GSA schedule orders, and GWACs are ordering vehicles with their own rules. OTAs are used for research and prototype projects and are not standard FAR contracts; they permit flexible terms and nonstandard intellectual-property arrangements. SBIR and STTR use set-asides and phased awards.

Business relationships raise integrity and competition issues. Teaming agreements, joint ventures, and mentor-protege arrangements can be permissible, but the government must avoid organizational conflicts of interest (OCI) and improper contingent fees. Subcontracting plans and small-business participation are enforced through reporting. Traps: assuming an IDIQ guarantees any minimum beyond the stated minimum; treating options as renewals; using an OTA when a FAR contract is required; and missing an OCI that biases the contractor's advice.

Worked example: a multiple-award IDIQ has three awardees and a $1 million order. The CO must provide fair opportunity to all three unless a documented exception applies; rotating orders without considering all awardees is not fair opportunity. Rule of thumb: in multiple-award IDIQ, fair opportunity is the default; document any exception.

DAWIA Contracting cheat sheet

Quick reference

Contract Principles and Planning

  • Acquisition planning (FAR Part 7) requires a written acquisition plan at or above the simplified acquisition threshold of $250,000.

  • Market research (FAR Part 10) precedes solicitation and informs the acquisition strategy, contract type, and competition approach.

  • Full and open competition is the default (FAR 6.101); any other than full and open competition requires an approved justification and approval.

  • Firm-fixed-price is preferred when requirements are clearly defined; cost-reimbursement requires an adequate accounting system and is not used for commercial items.

  • Time-and-materials and labor-hour contracts require a ceiling price and a determination that no other contract type is suitable.

  • Thresholds: micro-purchase $10,000; simplified acquisition threshold $250,000; commercial item procedures under FAR Part 12.

  • Order of precedence (FAR 52.215-8): schedule, solicitation provisions and contract clauses, specifications/drawings, attachments, contractor's proposal.

  • Only a warranted contracting officer can bind the government; authority is limited to that delegated in writing.

  • Small business set-aside precedence: 8(a), HUBZone, service-disabled veteran-owned, women-owned, then total or partial small business set-aside.

Quick reference

Contract Formation and Award

  • Proposed contract actions over $25,000 must be synopsized on SAM.gov for at least 15 days (FAR 5.203).

  • Sealed bidding (FAR Part 14) applies when time permits, award will be made on price alone, and specifications are definite and complete.

  • Negotiated acquisition (FAR Part 15) uses best value tradeoff or lowest price technically acceptable; all evaluation factors and significant subfactors must appear in the solicitation.

  • Award must be based solely on the factors and subfactors stated in the solicitation; unstated criteria cannot be used.

  • Responsibility (FAR 9.104-1) requires affirmative demonstration of capability, capacity, credit, integrity, tenacity, and past performance.

  • An SBA Certificate of Competency overrides a contracting officer's nonresponsibility determination for a small business concern.

  • A bid guarantee is normally required for sealed bidding when performance bonds will be required; Miller Act performance and payment bonds are required for construction over $150,000.

  • Bid mistakes (FAR 14.407) - apparent clerical errors are verified with the bidder; correction or withdrawal is permitted only in defined circumstances.

  • Postaward debriefing must be requested within 3 days of award and is held within 5 days of the request.

Quick reference

Contract Administration and Pricing

  • Cost allowability (FAR 31.201-2): a cost must be reasonable, allocable, consistent with GAAP, and consistent with the contract's terms, limitations, and exclusions.

  • Certified cost or pricing data are required for negotiated actions over $2 million absent an exception (adequate price competition, commercial item, catalog price, modification of an existing action, or waiver).

  • Cost analysis is used when price analysis alone is insufficient and examines labor hours, labor rates, material costs, and indirect rates.

  • Price analysis methods include comparison of competitive offers, prior prices paid, independent government estimates, published price lists, and market research.

  • Weighted guidelines (FAR 15.404-4) establish profit considering performance risk, contract type, cost risk, investment, and cost-efficiency.

  • Provisional billing rates are audited and replaced by final indirect rates that settle allowable incurred costs.

  • The Prompt Payment Act requires payment of proper invoices within 30 days of receipt and provides interest penalties for late payment.

  • Progress payments based on costs incurred are customary for small business; advance payments require approval and are the least preferred financing method.

  • Limitation of Cost and Limitation of Funds clauses cap government liability and require contractor notice as funds approach the ceiling.

Quick reference

Contract Execution, Modification, and Termination

  • The Changes clause authorizes unilateral changes within the contract's general scope; the contractor submits an equitable adjustment proposal, generally within 30 days.

  • A constructive change arises from defective specifications, unreasonable inspection, or unauthorized direction, and supports an equitable adjustment like a formal change order.

  • Only a warranted contracting officer may execute a modification; unauthorized commitments can be ratified only by an official with ratification authority.

  • Termination for convenience: the contractor recovers allowable costs, work performed, settlement expenses, and profit on work done; anticipatory profit is not allowed.

  • Termination for default: the government may reprocure and charge excess costs; excusable delay or defective notice can convert it to a termination for convenience.

  • A cure notice (typically 10 days) or show-cause notice precedes default termination for failure to perform or failure to make progress.

  • Novation (FAR 42.1204) requires a tripartite agreement among the government, transferor, and transferee; the original contractor remains liable until it is executed.

  • Under the Contract Disputes Act a contracting officer's final decision is appealable to a board within 90 days or to the Court of Federal Claims within 12 months; the claims limitations period is 6 years.

  • A stop-work order must be in writing and is limited to 90 days unless extended with approval.

Quick reference

Special Contracting Methods and Business Relationships

  • Indefinite-delivery/indefinite-quantity contracts must state minimum and maximum quantities; the government guarantees only the stated minimum.

  • Fair opportunity (FAR 16.505) applies to orders under multiple-award IDIQ contracts; exceptions include urgency, sole source, and logical follow-on.

  • GAO jurisdiction over task and delivery order protests is limited to orders above a statutory dollar threshold or allegations that the order exceeds the contract's scope, period, or maximum value.

  • FAR Subpart 8.4 ordering from Federal Supply Schedules requires RFQs to schedule contractors, at least three quotes when practicable, and a documented basis for selection.

  • Options may not extend the basic period plus all option periods beyond 5 years (FAR 17.204(e)) unless a specific exception applies.

  • Other Transaction Authority (10 U.S.C. 2371b) supports prototype projects with nontraditional contractors and may authorize follow-on production outside the FAR.

  • Blanket purchase agreements, basic ordering agreements, and governmentwide acquisition contracts are established vehicles that streamline order placement.

  • Mentor-protégé programs (SBA and DoD) allow an approved joint venture to be treated as small for covered procurements.

  • Contingency contracting flexibilities (FAR Part 18) include raised micro-purchase thresholds, limited competition, and streamlined procedures.

DAWIA Contracting key terms

Acquisition Plan

A written strategy that explains how an agency will meet a mission need, covering schedule, competition, contract type, pricing, and risk. It guides the contracting team before solicitation and is updated as circumstances change.

Related: Market Research, Source Selection Plan
Market Research

The process of collecting and analyzing information about available products, services, suppliers, and pricing before defining a requirement. It helps the agency choose a realistic acquisition strategy, competition approach, and contract type.

Related: Acquisition Plan, Independent Government Cost Estimate (IGCE)
Independent Government Cost Estimate (IGCE)

The government's own estimate of the probable cost or price of a requirement, prepared from data and judgment without relying on offeror proposals. It supports budgeting, price analysis, and evaluation of whether proposed prices are reasonable.

Related: Market Research, Acquisition Plan
Statement of Work (SOW)

A document that describes the required work in specific terms, including tasks, deliverables, schedules, and acceptance criteria. It tells the contractor what to do and is common when the government knows the solution it wants.

Related: Performance Work Statement (PWS), Statement of Objectives (SOO)
Performance Work Statement (PWS)

A statement that describes the required results in measurable performance terms rather than prescribing detailed methods. It states outcomes, quality standards, and surveillance so contractors can propose efficient ways to meet the need.

Related: Statement of Work (SOW), Statement of Objectives (SOO)
Statement of Objectives (SOO)

A high-level statement of the government's goals and desired outcomes, without detailed tasks or methods. Offerors use it to propose their own performance work statement and technical approach in negotiated acquisitions.

Related: Performance Work Statement (PWS), Statement of Work (SOW)
Justification and Approval (J&A)

A written document required when an agency intends to award a contract without full and open competition. It explains the legal basis, describes the circumstances, and must be approved at the level set by regulation.

Related: Contracting by Negotiation, Market Research
Sealed Bidding

A competitive method in which offerors submit sealed prices at one time, and the contract is awarded to the responsible bidder whose bid conforms to the invitation and offers the lowest price. It suits well-defined requirements.

Related: Contracting by Negotiation, Responsibility Determination, Bid Protest
Contracting by Negotiation

A competitive or noncompetitive method in which the government discusses proposals with offerors and may revise requirements or terms before award. It is used when price alone is not enough or requirements need clarification.

Related: Sealed Bidding, Best Value Tradeoff, Source Selection Plan
Source Selection Plan

A document that sets out how a source selection will be conducted, including evaluation factors, rating methods, team roles, and decision process. It helps ensure consistent, defensible evaluation of proposals before award.

Related: Evaluation Factors, Best Value Tradeoff
Evaluation Factors

The criteria stated in a solicitation that the government will use to judge proposals, such as technical approach, past performance, and price. They must be meaningful, stated in the solicitation, and applied consistently.

Related: Source Selection Plan, Best Value Tradeoff, Lowest Price Technically Acceptable (LPTA)
Best Value Tradeoff

A source selection approach in which the government compares the relative benefits of proposals against their prices and may pay more for superior performance. It requires documented judgment rather than automatic award to the lowest price.

Related: Lowest Price Technically Acceptable (LPTA), Evaluation Factors
Lowest Price Technically Acceptable (LPTA)

A source selection method in which proposals must meet stated minimum technical requirements and the lowest-priced acceptable offer wins. It is appropriate when requirements are clear and price is the dominant factor.

Related: Best Value Tradeoff, Evaluation Factors
Responsibility Determination

The contracting officer's judgment that a prospective contractor can perform the contract, considering factors such as financial resources, integrity, past performance, and facilities. A responsible contractor must also be eligible for award.

Related: Sealed Bidding, CPARS
Bid Protest

A challenge by an interested party to the award or proposed award of a contract, or to the terms of a solicitation. It may be filed with the agency, GAO, or the Court of Federal Claims.

Related: Sealed Bidding, Contracting by Negotiation
Firm-Fixed-Price (FFP)

A contract type in which the contractor agrees to perform the work for a fixed price, regardless of actual costs. The contractor bears cost risk and may earn more or less depending on efficiency.

Related: Cost-Plus-Fixed-Fee (CPFF), Time-and-Materials (T&M)
Cost-Plus-Fixed-Fee (CPFF)

A cost-reimbursement contract in which the government pays allowable incurred costs plus a fixed fee. The contractor has limited incentive to control costs, so the government monitors performance closely.

Related: Firm-Fixed-Price (FFP), Incurred Cost
Time-and-Materials (T&M)

A contract type that pays the contractor a fixed hourly rate for labor and reimburses materials at cost. It is used when the extent of work is uncertain, and it requires monitoring of hours and limits.

Related: Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF)
Cost Accounting Standards (CAS)

A set of accounting rules that require certain contractors to consistently measure, assign, and allocate costs to government contracts. CAS aims to make cost-based contract pricing and administration consistent and comparable.

Related: Incurred Cost, Forward Pricing Rate Agreement (FPRA)
Forward Pricing Rate Agreement (FPRA)

A negotiated agreement between the government and a contractor that sets labor and overhead rates to be used for pricing future contracts or modifications during a stated period. It reduces the need to audit each proposal.

Related: Cost Accounting Standards (CAS), Incurred Cost
Incurred Cost

Costs actually incurred by a contractor in performing a cost-reimbursement or flexibly priced contract. Contractors submit an incurred cost proposal so the government can determine allowable, allocable, and reasonable costs.

Related: Cost Accounting Standards (CAS), Forward Pricing Rate Agreement (FPRA), Cost-Plus-Fixed-Fee (CPFF)
Progress Payments

Payments made to a contractor during performance based on a percentage of costs incurred or work completed. They help finance performance on larger contracts and require adequate accounting and controls.

Related: Firm-Fixed-Price (FFP)
Contracting Officer's Representative (COR)

An individual designated in writing by the contracting officer to monitor contract performance, review invoices, and provide technical direction within limits. The COR does not have authority to change contract terms or prices.

Related: Change Order, CPARS
CPARS

The Contractor Performance Assessment Reporting System, used by agencies to record and share evaluations of contractor performance. Past performance ratings in CPARS can support responsibility determinations and source selection evaluations.

Related: Responsibility Determination, Evaluation Factors
Equitable Adjustment

A change to contract price, schedule, or other terms that restores the contractor to the position it would have occupied but for a government-caused change. It must be based on the impact of the change.

Related: Change Order, Constructive Change, Request for Equitable Adjustment (REA)
Change Order

A written modification, issued by the contracting officer under a changes clause, that directs a contractor to make a change within the scope of the contract. It may adjust price, schedule, or both.

Related: Equitable Adjustment, Constructive Change
Constructive Change

A government action or inaction that is not a formal change order but has the effect of changing the contractor's performance obligations or costs. The contractor may seek an equitable adjustment for the impact.

Related: Change Order, Equitable Adjustment, Request for Equitable Adjustment (REA)
Termination for Convenience

The government's right to end a contract when it is in the government's interest, even though the contractor is not at fault. The contractor is paid for work accepted, allowable costs, and a reasonable profit on that work.

Related: Termination for Default, Equitable Adjustment
Termination for Default

A termination based on the contractor's failure to perform, such as late delivery or failure to meet contract requirements. The contractor may be liable for excess costs of reprocurement and may face other consequences.

Related: Termination for Convenience
Request for Equitable Adjustment (REA)

A contractor's written request that the contracting officer adjust the contract price or schedule for a government-caused change or other compensable event. It is not a certified claim unless it meets claim requirements.

Related: Equitable Adjustment, Claim, Change Order
Claim

A written demand by a contractor for money, adjustment, or relief under the contract that is not a routine invoice or request and that may be certified. Claims are resolved through the disputes process.

Related: Request for Equitable Adjustment (REA), Equitable Adjustment
Option

A unilateral right in a contract under which the government may buy additional supplies or services within a stated period and at stated terms. The government is not obligated to exercise the option.

Related: IDIQ Contract
IDIQ Contract

An indefinite-delivery, indefinite-quantity contract that provides for an uncertain number of orders during a stated period. It sets a minimum and maximum quantity, and the government issues task or delivery orders as needs arise.

Related: GSA Schedule, Option
GSA Schedule

A long-term governmentwide contract awarded by the General Services Administration for commercial products and services at pre-negotiated prices. Agencies place orders against it after following applicable ordering procedures.

Related: IDIQ Contract, Market Research
Undefinitized Contract Action (UCA)

A contract action, such as a letter contract, that authorizes performance before all terms and price are agreed. The parties must definitively document the final terms within required limits and timeframes.

Other Transaction (OT)

A non-FAR agreement used by certain agencies to carry out research, development, or prototype projects with flexible terms. OTs are not procurement contracts and follow separate statutory authority.

Small Business Set-Aside

A procurement restricted to eligible small businesses so that a fair share of government contracts goes to small firms. The contracting officer must determine that at least two responsible small businesses can compete.

Related: Subcontracting Plan, Responsibility Determination
Subcontracting Plan

A required plan from a large-business prime contractor showing how it will give small business concerns the maximum practicable opportunity to participate as subcontractors. It includes goals and reporting requirements.

Related: Small Business Set-Aside, Mentor-Protégé Program
Mentor-Protégé Program

A program in which an experienced contractor mentors a smaller or disadvantaged firm to improve its business and contracting capabilities. Agencies may provide incentives, and the relationship requires an approved agreement.

Related: Subcontracting Plan, Teaming Agreement
Teaming Agreement

A pre-award agreement in which firms agree to work together on a bid or proposal and define their expected roles. It is generally not binding as a subcontract until the prime contract is awarded.

Related: Subcontracting Plan, Mentor-Protégé Program

DAWIA Contracting study plan

8 weeks · About 8 hours per week

Week 1

Contract Principles and Planning

  • Sequence the acquisition planning steps from requirements identification through solicitation release, naming the approval gate and the approving official at each step.

  • Distinguish the requiring activity, contracting officer, and COR roles by building a written responsibility matrix for a notional buy.

  • Apply three market research methods to a notional requirement and document the resulting commercial-item or non-commercial determination.

  • Draft an IGCE methodology outline that names the data sources, the basis of estimate, and the assumptions driving the number.

Your checkpoint

A two-page acquisition planning package for a notional $2M services buy: requirements description, market research summary, IGCE methodology, and competition strategy.

Week 2

Contract Principles and Planning & Contract Formation and Award

  • Evaluate small-business program eligibility (8(a), SDVOSB, WOSB, HUBZone) against three notional firm profiles and state the set-aside decision for each.

  • Build a justification-and-approval outline that addresses each statutory element required for a noncompetitive action.

  • Compare sealed bidding and negotiated acquisition against five criteria, then select and defend the correct method for two scenarios.

  • Apply Procurement Integrity Act and standards-of-conduct rules to three ethical scenarios and state the required action for each.

Your checkpoint

A timed 30-question self-written quiz covering Domains 1 and 2, scored at 80% or better, plus a correction log explaining every miss.

Week 3

Contract Formation and Award

  • Deconstruct a solicitation into its uniform contract format parts and cite the authority governing each section.

  • Draft evaluation criteria and a source selection plan that states the relative importance of factors and whether the approach is lowest price technically acceptable or a tradeoff.

  • Perform a price analysis using three comparison techniques and write a fair-and-reasonable determination supported by the results.

  • Determine when certified cost or pricing data is required, list the exceptions, and identify the consequence of defective data.

  • Sequence the award process from proposal receipt through debriefing and mark where protest windows open and close.

Your checkpoint

A source selection simulation: evaluate three mock proposals against your own criteria and produce an award decision memorandum with documented rationale and a debriefing outline.

Week 4

Contract Administration and Pricing

  • Compare fixed-price, fixed-price with economic price adjustment, time-and-materials, labor-hour, cost-reimbursement, and incentive contract types by cost risk, administrative burden, and suitability.

  • Apply the contract-type selection factors to four notional requirements and justify each choice in writing.

  • Compute an incentive fee adjustment and resulting price from a given target cost, target fee, share ratio, and actual cost.

  • Explain when progress payments, performance-based payments, and commercial-item financing each apply and who bears the financing risk.

Your checkpoint

A contract-type decision matrix covering at least seven contract types across five criteria, plus three worked pricing computations with independently verified answers.

Week 5

Contract Administration and Pricing & Contract Execution, Modification, and Termination

  • Differentiate cost analysis techniques, including cost realism, should-cost analysis, and the role of audit services, and choose the right one for three scenarios.

  • Compute cost and schedule variances and a forecast of final cost from given earned value data, then interpret what each result signals to the contracting officer.

  • Outline the core contract administration functions: surveillance, quality, property accountability, payment, and closeout.

  • Separate contracting officer authority from COR authority by listing five actions a COR may not take.

Your checkpoint

A contract administration plan for a notional services contract containing a surveillance schedule, an invoice review checklist, and an explicit COR authority boundary statement.

Week 6

Contract Execution, Modification, and Termination

  • Classify ten notional changes as within scope, out of scope, or constructive, and name the modification instrument required for each.

  • Draft both a bilateral supplemental agreement and a unilateral change order, citing the clause that authorizes each.

  • Break down a termination for convenience settlement into its recoverable components and compute a sample settlement amount.

  • Contrast termination for convenience with termination for default on notice, liability, and appeal rights.

  • Trace a dispute from the contracting officer's final decision through an agency-level or board-level appeal, noting the election the contractor must make.

Your checkpoint

A termination and disputes flow chart plus a one-page termination-for-convenience settlement computation with a justification line for every cost element.

Week 7

Special Contracting Methods and Business Relationships

  • Compare multiple-award indefinite-delivery contracts, blanket purchase agreements, and federal schedule orders on ordering procedure, fair opportunity, and protestability.

  • Determine when other transaction authority, small-business innovation research awards, and simplified acquisition procedures are permissible for a given requirement.

  • Distinguish teaming agreements, joint ventures, and prime-subcontractor relationships, and apply the limitations on subcontracting to two scenarios.

  • Identify each type of organizational conflict of interest in four scenarios and propose a mitigation or avoidance measure for each.

Your checkpoint

A one-page decision guide that routes five notional requirements to the correct special contracting method with the governing authority cited for each.

Week 8

Contract Principles and Planning & Contract Formation and Award & Contract Administration and Pricing & Contract Execution, Modification, and Termination & Special Contracting Methods and Business Relationships

  • Complete a full-length timed practice exam under exam conditions and score it by domain to expose remaining gaps.

  • Re-teach the three weakest subareas in writing, one page each, to confirm mastery rather than recognition.

  • Consolidate the running error log into 20 flashcards and drill them to 90% recall.

  • Verify and memorize the key thresholds, notice periods, and protest time limits you will need, checking each against the regulation rather than memory.

Your checkpoint

A scored practice exam with a domain-by-domain remediation plan, achieving at least 80% overall with no single domain below 70%.

Milestones

Week 2: Score 80% or better on the Domain 1-2 quiz and explain, without notes, the difference between a set-aside determination and a justification for other than full and open competition.

Week 4: Produce a defensible contract-type selection and a verified incentive-fee computation; any computation error must be traced to a named formula before moving on.

Week 6: Correctly classify at least 8 of 10 change scenarios and complete the termination-for-convenience settlement with every cost element justified.

Week 8: Achieve 80% or better overall on the timed practice exam with no domain under 70%, and have a written remediation plan for anything below that bar.

DAWIA Contracting exam day

Your checklist

Valid, unexpired government-issued photo ID

Name on the ID must match your registration exactly. Accepted ID forms and any secondary-ID requirement vary by testing vendor, so confirm the exact list with your provider before test day.

Appointment / registration confirmation

Bring a printed or downloaded copy showing your exam name, date, time, and testing location or remote-session link. Screenshot it in case building Wi-Fi is unavailable.

Platform login credentials (tested in advance)

Log into the learning management system and testing platform at least 72 hours out to confirm your account is active and your password has not expired. Reset early rather than on exam morning.

Remote-proctoring readiness (if testing remotely)

Webcam, microphone, stable wired or high-speed connection, and the required browser or lockdown application. Confirm with your provider whether remote proctoring is offered for your specific exam and what software is required.

Cleared, private testing space

Remove notes, books, wall charts, second monitors, and personal items from the camera view and desk surface. Proctors commonly require a room scan; confirm the room requirements with your provider.

Approved calculator

Some acquisition exams provide an on-screen calculator or prohibit physical devices entirely. Confirm the calculator policy with your provider and do not assume a personal calculator will be allowed.

Scratch paper / whiteboard and pen

Often supplied by the test center or permitted as a single erasable sheet for remote sessions; policies differ and materials may be collected or wiped afterward. Confirm what is allowed.

Accommodation request (if needed)

If you require extra time, a separate room, or other accommodation, submit the request well before the exam date and get written confirmation. Deadlines and documentation requirements are set by the provider - confirm them.

Logistics checked: address, parking, arrival time

Do a route check the day before and plan to arrive with buffer time. Late arrival can forfeit your seat and fee; confirm the vendor's cutoff policy in advance.

Know the exam structure going in

Confirm the number of questions, time limit, passing standard, whether unanswered questions count as incorrect, and the retake policy from your provider's candidate handbook - do not rely on secondhand accounts from colleagues.

Personal comfort items for breaks only

Water, a snack, and a light layer for the testing room, kept in a locker or outside the testing area. Food and drink at the workstation are usually prohibited - confirm.

Plan the day

72 hours out

Reconfirm the appointment date, time, and location/link in writing. Run any required system or equipment check. Verify your login works. Submit or confirm any pending accommodation request. Locate your provider's candidate handbook and read the rules on ID, materials, breaks, scoring, and retakes.

72 hours out - study strategy

Stop chasing new material. Review the published exam content outline and spend your time on your two or three weakest domains. Practice recalling the structure of the FAR (Parts 1-53 by subject area) and core analytical distinctions such as price analysis versus cost analysis, and competitive versus noncompetitive procedures.

72 hours out - logistics

Protect sleep. Shift to normal hours now so exam morning is not a recovery day. Confirm transportation and, for remote sessions, that your household knows the testing window is quiet time.

24 hours out

Pack ID, confirmation, and any permitted items in one place. Print or download the session link and credentials. Do a final short review of a one-page summary of your weak areas, then stop. Avoid all-night cramming - fatigue costs more points than one extra hour of review gains.

Night before

Set two alarms, charge devices, and get a full night's sleep. Do not start new topics or attempt to memorize long regulatory lists at this stage.

Morning of

Eat a normal meal and limit caffeine to your usual amount. For a test center, arrive early with buffer for check-in; for a remote session, log in before your scheduled start time so you can complete identity verification without eating into exam time. Have your ID out and your desk cleared before you sit down.

First minutes of the test

Read the instructions and any nondisclosure agreement carefully. If scratch material is permitted, immediately jot down key formulas or framework headings you are worried about forgetting, then begin.

During the test - pacing

Compute a rough per-question time budget from the total time and question count, and check your progress at the one-quarter, half, and three-quarter marks. Do not let one hard calculation consume several questions' worth of time.

During the test - answering

Work in two passes: answer what you know, flag what you do not, and keep moving. Use elimination on questions that turn on a single distinguishing element (for example, which exception applies, or which contract type shifts cost risk to the contractor). Ensure every question has an answer before time expires.

During the test - breaks

If you take a break, confirm in advance whether the clock stops or keeps running. Assume it keeps running unless told otherwise, and raise your hand or notify the proctor before leaving.

Final minutes

Return to flagged questions, sanity-check any calculation, and confirm no question is blank. Submit deliberately and note your completion confirmation or score report for your records.

After the test

Save the score report and, if you did not pass, review the provider's retake eligibility and waiting period before rescheduling. Do not discuss specific exam content with colleagues - you have likely agreed not to.

Rules to check

  • Bring valid, unexpired photo identification whose name matches your registration; confirm the vendor's accepted ID forms and any secondary-ID rule with the provider before test day.

  • Leave phones, smartwatches, notes, and any unapproved reference materials outside the testing area. Unauthorized materials at the workstation are commonly grounds for termination of the session - confirm the exact policy with your provider.

  • Treat the exam as closed-book unless your provider's handbook explicitly states otherwise. Where an authorized reference is permitted, use only the version and format specified.

  • Confirm break rules before you begin: whether unscheduled breaks pause the clock, whether you must remain on camera, and whether you may leave the room. Policies differ, so verify with the provider rather than assuming.

  • Confirm the passing standard and reporting format with your provider in advance. Many certification exams report pass/fail only, with no partial credit and no score breakdown by domain.

  • Answer every question unless the provider states otherwise. Most certification exams do not penalize guessing, but verify this in the candidate handbook before you rely on it.

  • If a technical problem interrupts a remote session, stop and contact the proctor or support line immediately, document the time and issue, and follow their instructions. Do not attempt extensive troubleshooting on your own mid-exam.

  • Honor the confidentiality agreement you accept at the start of the exam: do not reproduce, share, or discuss specific exam items afterward.

DAWIA Contracting FAQ

How many DAWIA Contracting practice questions are available?

The practice set has 198 DAWIA Contracting questions. Each one includes the choices, the correct answer, and an explanation, and the set is free to read with no signup.

How many DAWIA Contracting flashcards are available?

The flashcard set has 32 DAWIA Contracting cards. Each card shows the term and its definition.

Which topics does the DAWIA Contracting study material cover?

The DAWIA Contracting study material has 5 sections, including Contract Principles and Planning, Contract Formation and Award, and Contract Administration and Pricing.