CISA Practice Test

CISA – Certified Information Systems Auditor

CISA overview

  • 200 practice questions
  • 32 flashcards
  • 5 study guide topics
  • 37 key terms

What you'll study

  • Information Systems Auditing Process20%
  • Governance and Management of Information Technology20%
  • Information Systems Acquisition, Development & Implementation20%
  • Information Systems Operations and Business Resilience20%
  • Protection of Information Assets20%

The Certified Information Systems Auditor (CISA) credential, awarded by ISACA, is described by ISACA as the standard of achievement for auditing, monitoring and assessing IT and business systems. It is aimed at IT audit, assurance, control and security professionals who assess technology risk, and holders agree to ISACA's Code of Professional Ethics and to the Information Systems Auditing Standards. The exam covers five domains: the information systems auditing process; governance and management of IT; information systems acquisition, development and implementation; information systems operations and business resilience; and protection of information assets. ISACA states the certification also addresses emerging technologies such as AI and blockchain. Exams are computer-based and delivered at authorized PSI testing centers globally or by remote proctoring, and registration is continuous. Passing the exam is only the first step: certification also requires five years of relevant professional experience gained within the preceding ten years, a one-time US$50 application processing fee, and an application submitted within five years of passing. To prepare, ISACA offers a review manual, an online review course, a questions/answers/explanations database, a free ten-question practice quiz and member study groups. The practice questions on this page are original, independently written material and are not affiliated with, endorsed by, or drawn from ISACA.

Common mistakes

On a stem phrased 'What should the IS auditor do FIRST/NEXT?', selects a management action (e.g., 'implement multifactor authentication', 'revise the security policy') instead of an audit action (gather evidence, corroborate the finding with the auditee, report to the audit committee, follow up on remediation).

Many candidates come from operations, security, or consulting roles where the rewarded behaviour is to fix the problem; the reflex to solve rather than to assure carries over into the exam.

What to do instead

For every 'auditor should' stem, first classify each option as audit action vs management action, and eliminate all management actions. The ISACA-consistent answer is almost always: obtain sufficient evidence, validate/communicate the finding, then follow up - never the auditor executing the fix.

Treats a management statement or a verbal assurance ('the CIO confirmed the policy is enforced') as adequate evidence to close an audit issue, rather than seeking independent corroboration such as configuration exports, sample testing, or system-generated logs.

Deference to seniority and the desire to avoid conflict with the auditee; also a misreading of 'efficiency' as 'accept the quickest answer.'

What to do instead

Apply the evidence test to each option: sufficient, competent, relevant, and from a source independent of the control owner. An unverified management assertion is weak evidence on its own; the defensible answer combines it with independent corroboration.

Assigns strategic/oversight decisions to the wrong body - e.g., selecting 'the IT steering committee defines the enterprise IT strategy', 'the CIO approves the IT risk appetite', or 'the IT department sets IT policy' for questions about governance.

Strategy, policy, steering committees, and the CIO all appear in the same chapter of the review material, so candidates pick whichever authority sounds most IT-specific instead of the correct level of accountability.

What to do instead

Build a decision-to-body map before the exam: board/audit committee = oversight, risk appetite, IT strategy alignment with business; IT steering committee = prioritisation and resource allocation across competing initiatives; CIO/IT management = execution and standards. Test each option against 'who is accountable at this level?'

On outsourcing and third-party questions, selects answers that say the organisation has 'transferred the risk to the service provider' or can 'rely on the vendor's certification', instead of answers about retained accountability, right-to-audit clauses, and ongoing vendor monitoring.

Commercial contract intuition says signing an SLA moves the problem to the vendor; it feels like a complete, business-like answer.

What to do instead

Memorise the principle that accountability and risk ownership are never outsourced. Prefer options containing contract clauses plus independent monitoring/right to audit over options containing transfer, certification-only, or vendor self-reporting.

Selects 'the project manager conducts the post-implementation review' or 'the project team performs the benefits realisation assessment' as the correct answer for post-implementation review questions.

The project manager visibly owns go-live and closeout, so continuity of ownership feels natural, and independence is not at the front of mind under time pressure.

What to do instead

Apply an independence screen to any review/assurance option: if the reviewer was responsible for designing, building, or running the system, eliminate it. The correct answer assigns the review to internal audit, an independent QA function, or business management outside the project team.

Accepts user acceptance testing sign-off as proof that the new system is adequately controlled, rather than requiring separate security/control testing and audit or QA involvement; likewise confuses UAT scope (business functionality) with integration, stress, or control testing.

Go-live narratives emphasise UAT as the final gate, so it is remembered as the universal approval step.

What to do instead

Attach a scope label to every test type in the material: UAT = business fitness for purpose by users; integration, stress/volume, and security testing = technical; control testing and audit review = assurance on controls. Rule out any option that uses UAT to answer a control or security objective.

Reverses RTO and RPO, e.g., answering 'RPO of four hours' for a stem describing how long a business process may be unavailable, or designing recovery plans against the wrong metric.

The two acronyms differ by one letter and the definitions are read once and never contrasted.

What to do instead

Fix the distinction verbally: RTO = how long the business can survive the outage (time to restore service); RPO = how much data the business can afford to lose (age of last recoverable copy, drives backup frequency). Rewrite the stem's number into one of those two sentences before choosing.

Treats backup restoration as the answer to business continuity questions, selecting 'restore from the most recent backup' when the stem asks how critical business functions will be maintained during an extended outage.

Backup and recovery are the most familiar part of resilience, so they get used as a generic answer for any disruption scenario.

What to do instead

Separate the layers explicitly: backup/restore = data recoverability; disaster recovery = restoring IT infrastructure and services; business continuity = keeping or resuming business processes (manual workarounds, alternate sites, staff, suppliers). Match the answer's layer to the object in the stem.

Confuses the cryptographic primitives - proposing encryption to prove integrity or nonrepudiation, hashing to provide confidentiality, or a hash alone as a nonrepudiation mechanism - when matching a control to a stated security objective.

Encryption, hashing, and digital signatures are learned as one 'cryptography' block; their distinct guarantees blur under exam pressure.

What to do instead

Memorise a one-line property map: symmetric encryption = confidentiality; hashing = integrity (detects change, no secrecy, no identity); asymmetric encryption = key exchange/confidentiality; digital signature (hash + sender's private key) = integrity + authentication + nonrepudiation. Match the objective in the stem to the property, not to the technology name.

Selects a detective or corrective control (IDS alerts, log review, exception reporting, antivirus quarantine) when the stem asks how to prevent an event, or labels a preventive control as detective.

Real-world answers are often layered ('we would detect it and then respond'), and candidates reward any control that addresses the described scenario.

What to do instead

Before reading options, write P/D/C next to the stem's requirement: prevent = stop before occurrence (access restrictions, encryption, firewalls, segregation of duties, input validation); detect = identify after occurrence (IDS, log review, reconciliation); correct = restore after occurrence (backups, patches, incident response). Then eliminate any option whose class does not match the requirement.

Exam requirements can change. Confirm current details with the exam provider.

CISA practice

200 questions. Each one lists the choices, the correct answer, and an explanation. With JavaScript, this list opens one question at a time. The checker at the top of this page saves progress in this browser when it is available.

  1. Question 1Information Systems Auditing Process

    What is the primary purpose of an IS audit charter?

    1. To list the technical certifications held by each audit team member
    2. To define the audit function's authority, scope and reporting lines Correct answer.
    3. To record the specific tests planned for the current annual audit cycle
    4. To document the detailed audit procedures to be performed in each engagement

    Explanation

    The charter is approved by senior management and the audit committee and grants the audit function its mandate, including authority to access records and personnel, the scope of its activities and its reporting relationships. It is a standing governance document rather than an engagement-level working document.

  2. Question 2Information Systems Auditing Process

    Audit risk in an IS audit is best described as:

    1. The risk that the audit engagement exceeds its approved budget and timeline
    2. The risk that client personnel provide misleading answers during audit interviews
    3. The risk that the auditor gives an inappropriate opinion on the subject matter Correct answer.
    4. The risk that a control fails to prevent or detect a material error

    Explanation

    Audit risk is the risk that the auditor concludes the subject matter is fairly stated when it is in fact materially misstated, or vice versa, and therefore issues an inappropriate conclusion. It is a function of inherent risk, control risk and detection risk.

  3. Question 3Information Systems Auditing Process

    Which of the following provides the most reliable audit evidence?

    1. A screenshot of a configuration screen provided by the system administrator
    2. The auditor's own observation of a backup restoration test Correct answer.
    3. An internal memo describing the backup process
    4. A verbal confirmation from the IT manager

    Explanation

    Evidence obtained directly by the auditor through observation or inspection is more reliable than evidence supplied by the auditee, because it has not passed through the auditee's filter. Reliability increases when the evidence is obtained from an independent source or by the auditor personally.

  4. Question 4Information Systems Auditing Process

    Audit workpapers prepared during an IS audit are:

    1. documents the auditee may inspect but that the audit function destroys once the report is issued
    2. confidential records owned by the audit organization and retained per policy Correct answer.
    3. the property of the auditee, who may request their return after reporting
    4. optional records created only when a finding is contested by management

    Explanation

    Workpapers are the property of the audit organization, are treated as confidential and are retained according to the organization's record retention policy and applicable professional standards. They document the work performed and support the conclusions reached.

  5. Question 5Information Systems Auditing Process

    An audit designed to determine whether an organization adheres to laws, regulations and internal policies is called:

    1. A forensic audit
    2. A financial statement audit
    3. An operational audit
    4. A compliance audit Correct answer.

    Explanation

    A compliance audit tests whether the entity follows applicable laws, regulations, standards and internal policies. The other audit types address different objectives, such as efficiency of operations, fair presentation of financial information or investigation of suspected wrongdoing.

  6. Question 6Information Systems Auditing Process

    In audit planning, materiality refers to:

    1. the number of findings that must be escalated to the audit committee
    2. the size of an error that could change a decision made by report users Correct answer.
    3. the total cost of the audit procedures planned for the engagement
    4. the level of technical detail required in the audit workpapers

    Explanation

    Materiality is the threshold at which an omission or misstatement is large enough to influence the decisions of users of the audit report. It guides the auditor in determining what to test and what to report.

  7. Question 7Information Systems Auditing Process

    To preserve independence, the IS audit function should report primarily to:

    1. the external audit firm
    2. the chief information officer
    3. the IT operations manager
    4. the audit committee of the board Correct answer.

    Explanation

    Reporting to the audit committee, which sits above operational management, keeps the audit function free from the influence of the areas it audits. The audit committee also approves the charter and the audit plan.

  8. Question 8Information Systems Auditing Process

    Why is inquiry alone generally insufficient as audit evidence?

    1. It can only be applied in financial statement audits
    2. It requires specialized software that is often unavailable
    3. It relies on the knowledge and honesty of the person questioned Correct answer.
    4. It produces evidence that is too costly to document

    Explanation

    Inquiry relies on the accuracy and openness of the respondent and produces no corroborating proof by itself. Auditors therefore use it to obtain information and then corroborate the responses with inspection, observation, reperformance or confirmation.

  9. Question 9Information Systems Auditing Process

    When developing the annual IS audit plan, an audit manager should allocate the most resources to:

    1. areas with the highest assessed risk and weakest controls Correct answer.
    2. systems supplied by the newest technology vendor
    3. areas explicitly requested by the IT department
    4. systems that were audited most recently

    Explanation

    A risk-based audit plan prioritizes areas where the combination of impact and likelihood is highest and where controls are least effective. Resource allocation should follow that assessment rather than convenience or management preference.

  10. Question 10Information Systems Auditing Process

    A generalized audit software (GAS) tool is most useful for:

    1. designing new application controls for a system under development
    2. replacing professional judgment when forming audit conclusions
    3. testing a full population by recalculating and extracting exceptions Correct answer.
    4. documenting interviews with system administrators

    Explanation

    GAS tools let the auditor read and analyze entire data files directly, performing recalculations, matches, stratifications and exception extraction across the full population. This improves coverage and allows the auditor to test 100 percent of transactions rather than a sample.

  11. Question 11Information Systems Auditing Process

    An auditor testing whether purchase orders are approved before payment should use:

    1. variable sampling to estimate the total dollar value of payments
    2. discovery sampling to locate a single fraudulent transaction
    3. attribute sampling to estimate the deviation rate from the control Correct answer.
    4. judgmental sampling limited to the largest transactions

    Explanation

    The question is whether a control operated, which is a yes-or-no characteristic, so attribute sampling is the appropriate method for estimating the rate of deviation. Variable sampling is used when the auditor needs to estimate a monetary amount.

  12. Question 12Information Systems Auditing Process

    A primary benefit of control self-assessment (CSA) is that it:

    1. removes the need for periodic internal audits of the process
    2. transfers responsibility for control design to the audit function
    3. provides independent assurance equivalent to an audit opinion
    4. engages process owners in evaluating and improving their own controls Correct answer.

    Explanation

    CSA workshops and questionnaires make operating management active participants in assessing control effectiveness, which raises awareness and ownership of risk. The audit function may facilitate and use the results but must still obtain its own assurance where needed.

  13. Question 13Information Systems Auditing Process

    An IS auditor comparing the number of terminated employees in HR records with the number of active network accounts in the directory is performing:

    1. a reperformance of a programmed control
    2. a confirmation with an independent third party
    3. an analytical procedure comparing independent data sets Correct answer.
    4. a physical inspection of assets

    Explanation

    The auditor is evaluating relationships between separate data sources to identify anomalies that warrant investigation, which is an analytical procedure. It is efficient for highlighting potential access-control weaknesses but must be followed up with detailed testing.

  14. Question 14Information Systems Auditing Process

    Which set of elements describes a complete audit finding?

    1. scope, budget, timeline and staffing
    2. criteria, condition, cause, effect and recommendation Correct answer.
    3. charter, plan, program and report
    4. risk, likelihood, impact and mitigation

    Explanation

    A well-structured finding states the criteria (what should be), the condition (what is), the cause (why it happened), the effect (the risk or impact) and a recommendation. This structure allows management to understand and act on the issue.

  15. Question 15Information Systems Auditing Process

    The auditor's assessment of detection risk is used to determine the:

    1. fee charged for the audit engagement
    2. number of auditors assigned to the engagement
    3. nature, timing and extent of substantive testing Correct answer.
    4. need for a qualified audit opinion

    Explanation

    Detection risk is the risk that the auditor's procedures fail to detect a material misstatement, so the auditor manages it by adjusting the nature, timing and extent of testing. Higher acceptable detection risk permits less testing, while lower acceptable detection risk requires more.

  16. Question 16Information Systems Auditing Process

    Which statement best describes the IS auditor's follow-up responsibility?

    1. follow-up is limited to confirming that management received the report
    2. the auditor should verify that agreed corrective actions were implemented timely Correct answer.
    3. follow-up is performed only when requested by the audit committee
    4. follow-up replaces the need for a future audit of the same area

    Explanation

    Follow-up is a standard phase of the audit process in which the auditor determines whether management implemented the agreed remedial actions within the committed timeframe. Unresolved issues are escalated to senior management and the audit committee.

  17. Question 17Information Systems Auditing Process

    The main purpose of an exit meeting with auditee management is to:

    1. announce the scope of the next audit engagement
    2. confirm the factual accuracy of findings and agree on corrective actions Correct answer.
    3. obtain the auditee's approval of the audit budget
    4. decide whether the audit report will be made public

    Explanation

    The exit meeting gives management the opportunity to validate facts, provide additional context and commit to remediation before the report is finalized. This reduces the risk of later disputes over accuracy.

  18. Question 18Information Systems Auditing Process

    Before beginning fieldwork, an IS auditor should first:

    1. issue the final report to the audit committee
    2. select the sample of transactions to be tested
    3. define the audit objectives and scope for the engagement Correct answer.
    4. test the operating effectiveness of key controls

    Explanation

    Objectives and scope determine what evidence is needed and therefore must be established before any testing begins. Sampling and control testing follow from those objectives and from the understanding of the area gained during planning.

  19. Question 19Information Systems Auditing Process

    A review of audit workpapers by the engagement supervisor should occur:

    1. after the final report has been issued
    2. only if a finding is disputed by the auditee
    3. at the sole discretion of the individual auditor
    4. before the audit report is issued, as part of quality control Correct answer.

    Explanation

    Supervisory review is a quality control step that confirms the work performed supports the conclusions and that documentation is complete, and it must take place before the report is released so that deficiencies can be corrected.

  20. Question 20Information Systems Auditing Process

    During an audit, management explains that a control failure was a one-time event. The auditor should:

    1. accept the explanation because management is responsible for controls
    2. expand the scope only if the client agrees to fund the extra work
    3. remove the issue from the report to avoid conflict with management
    4. corroborate the explanation with independent evidence before accepting it Correct answer.

    Explanation

    Professional skepticism requires the auditor to treat management explanations as assertions that need corroboration. Testing additional items or reviewing logs and incident records provides evidence about whether the failure was isolated or systemic.

  21. Question 21Information Systems Auditing Process

    Sampling risk is best described as the risk that:

    1. the audit team lacks the technical skills required to interpret results
    2. the selected sample includes transactions that cannot be located
    3. a conclusion drawn from a sample differs from the conclusion from the population Correct answer.
    4. the population data provided by the client is incomplete or inaccurate

    Explanation

    Sampling risk arises because the auditor examines only part of the population, so the sample result may not represent the population as a whole. It can be controlled by increasing sample size or by choosing an appropriate sampling method.

  22. Question 22Information Systems Auditing Process

    An IS auditor finds that an application has high inherent risk and weak controls. The most appropriate response is to:

    1. defer the audit to the following audit cycle
    2. reduce the scope to keep the audit within budget
    3. rely on management's self-assessment of the control
    4. increase the extent of substantive testing to reduce detection risk Correct answer.

    Explanation

    Where inherent and control risk are high, the auditor must lower detection risk by performing more or better substantive procedures to keep overall audit risk at an acceptable level. Reducing scope or deferring work would leave the risk unaddressed.

  23. Question 23Information Systems Auditing Process

    Before relying on work performed by the internal audit function, an IS auditor should primarily evaluate:

    1. the size of the internal audit budget
    2. the competence and objectivity of the internal auditors Correct answer.
    3. the number of reports issued in the prior year
    4. the software tools used by the internal audit team

    Explanation

    Reliance on another audit function is justified only when that function is sufficiently competent and objective, and when its work was properly planned, documented and reviewed. These attributes determine whether the prior work can be trusted as evidence.

  24. Question 24Information Systems Auditing Process

    An organization outsources payroll processing. When obtaining assurance over the provider's controls, the IS auditor should first:

    1. assume the controls are effective because the contract includes penalties
    2. review the scope, period and opinion in the provider's independent assurance report Correct answer.
    3. rely on the provider's marketing materials and certifications
    4. perform a full audit of the service provider's data center

    Explanation

    The auditor must confirm that the provider's assurance report covers the relevant systems, the period of intended reliance, the control objectives tested and the auditor's opinion. Scope limitations or a period that does not cover the reliance period reduce the report's usefulness.

  25. Question 25Information Systems Auditing Process

    Which statement best reflects the IS auditor's responsibility for fraud?

    1. the auditor considers fraud risk throughout the audit but does not guarantee detection Correct answer.
    2. fraud risk is considered only if an allegation has been received
    3. fraud detection is solely the responsibility of the external auditor
    4. the auditor must detect all fraud before issuing an opinion

    Explanation

    The auditor is required to consider the risk of fraud when planning and performing the engagement and to maintain professional skepticism, but an audit provides reasonable, not absolute, assurance. Prevention and detection of fraud remain management's responsibility.

  26. Question 26Information Systems Auditing Process

    In the audit risk model, inherent risk is best described as:

    1. The risk that the auditor will express an inappropriate opinion overall
    2. The susceptibility of an area to error before considering related controls Correct answer.
    3. The risk that audit procedures will fail to detect a material error
    4. The risk that controls will not prevent or detect an error on a timely basis

    Explanation

    Inherent risk reflects the exposure of an area or process to error or misstatement assuming no related controls exist. It is assessed during planning to direct attention to inherently risky areas before control effectiveness is considered.

  27. Question 27Information Systems Auditing Process

    An IS auditor is engaged to assess whether a data center's operations are efficient and aligned with business objectives. This engagement is best described as:

    1. A financial statement audit
    2. An integrated audit
    3. A compliance audit
    4. An operational audit Correct answer.

    Explanation

    An operational audit evaluates the efficiency and effectiveness of operations and their alignment with organizational objectives. Compliance audits test adherence to rules, financial audits address financial reporting, and an integrated audit combines financial and operational or control elements.

  28. Question 28Information Systems Auditing Process

    An IS auditor assesses control risk as high for a key application. The effect on the audit approach is that the auditor should:

    1. Increase the extent of substantive testing of transactions Correct answer.
    2. Reduce the amount of evidence gathered from the application
    3. Rely on the application's automated controls without testing them
    4. Lower the assessed level of inherent risk for the application

    Explanation

    When controls are assessed as unreliable, the auditor must rely less on them and expand substantive procedures to keep audit risk at an acceptable level. Control risk and the extent of substantive testing move in the same direction.

  29. Question 29Information Systems Auditing Process

    During an audit, management refuses to allow access to system logs needed to complete a key test. The auditor's most appropriate action is to:

    1. Accept management's verbal assurance that the logs contain no errors
    2. Issue an unqualified report noting the issue only in a footnote
    3. Extend the engagement timetable until access is eventually granted
    4. Report the scope limitation to the audit committee and adjust the conclusion Correct answer.

    Explanation

    A refusal of access is a scope limitation that must be escalated to those charged with governance and reflected in the audit conclusion. The auditor cannot issue a clean opinion on an area where sufficient appropriate evidence was not obtained.

  30. Question 30Information Systems Auditing Process

    An IS auditor is asked to design and implement the access control procedures for a system that will be audited next year. The auditor should:

    1. Decline, because auditors are prohibited from advising management at all
    2. Accept, provided the work is reviewed by another auditor
    3. Decline, because designing controls impairs objectivity in a later audit Correct answer.
    4. Accept, since access controls are within the auditor's technical expertise

    Explanation

    Objectivity is impaired when an auditor later audits controls that the auditor personally designed or implemented, because the auditor would effectively be reviewing their own work. Advisory services must be separated from assurance work on the same subject matter.

  31. Question 31Information Systems Auditing Process

    An IS auditor receives a legal subpoena requiring disclosure of client audit workpapers. The auditor should:

    1. Refuse to disclose because client information is confidential
    2. Destroy the workpapers to protect the client's information
    3. Provide the workpapers only if the client's chief executive approves
    4. Comply with the subpoena after consulting legal counsel Correct answer.

    Explanation

    Confidentiality obligations yield to legal requirements, but the auditor should obtain legal advice before disclosing so that the response is proper and limited in scope. Client approval is not required when a valid legal demand exists.

  32. Question 32Information Systems Auditing Process

    The primary purpose of performing a walkthrough of a business process is to:

    1. Provide statistical evidence that controls operated all year
    2. Replace the need for testing a sample of transactions
    3. Satisfy the requirement to report all deficiencies to the board
    4. Confirm the auditor's understanding of the process and its controls Correct answer.

    Explanation

    A walkthrough traces one or a few transactions through the process to validate the auditor's documented understanding of how the process and its controls actually operate. It is a qualitative procedure and does not provide statistical assurance about the population.

  33. Question 33Information Systems Auditing Process

    Before relying on the work of an IT security specialist engaged to assess firewall configurations, the IS auditor should primarily evaluate the specialist's:

    1. Competence, objectivity and understanding of the audit objectives Correct answer.
    2. Willingness to accept the auditor's conclusions
    3. Employment history and length of service with the organization
    4. Commercial relationship with the firewall vendor

    Explanation

    The auditor remains responsible for the conclusion and must confirm that the specialist has the necessary skills, is independent of the area being reviewed, and understands the objectives and scope of the work. The adequacy of the specialist's work and its basis must also be reviewed.

  34. Question 34Information Systems Auditing Process

    An organization wants audit tests to run automatically against transactions as they are processed. This is best achieved through:

    1. A larger sample of transactions selected at year end
    2. A post-implementation review of the application
    3. Embedded audit modules that monitor transactions in real time Correct answer.
    4. A monthly extract of transactions reviewed manually

    Explanation

    Embedded audit modules are code built into the application that capture and test transactions continuously as they occur, supporting a continuous auditing approach. Manual extracts, post-implementation reviews and year-end samples are periodic and cannot monitor processing in real time.

  35. Question 35Information Systems Auditing Process

    Which of the following describes an appropriate practice for IS audit documentation?

    1. Workpapers are kept only until the draft report is issued
    2. Workpapers are the personal property of the individual auditor
    3. Workpapers are destroyed once management agrees with the findings
    4. Workpapers are retained per policy and support the conclusions reached Correct answer.

    Explanation

    Audit documentation must be sufficient to allow an experienced auditor with no prior connection to the engagement to understand the work performed and the basis for the conclusions. It remains subject to the organization's retention policy and is not the personal property of the auditor.

  36. Question 36Information Systems Auditing Process

    An IS auditor cannot obtain sufficient appropriate evidence on a matter that is both material and pervasive to the area examined. The auditor should:

    1. Issue a qualified opinion limited to the affected transactions
    2. Issue a disclaimer of opinion on the area examined Correct answer.
    3. Issue an unqualified opinion with a note describing the gap
    4. Withdraw from the engagement without further communication

    Explanation

    When a scope limitation is both material and pervasive, the auditor cannot form an opinion and issues a disclaimer rather than an opinion. A qualified opinion is used only when the limitation is material but not pervasive.

  37. Question 37Information Systems Auditing Process

    An IS auditor plans to reduce substantive testing by relying on a key automated control. Which condition must be met first?

    1. The application must have been implemented within the last year
    2. Management must confirm in writing that the control is reliable
    3. The control must be tested and found to be operating effectively Correct answer.
    4. The control must be tested once at the end of the audit period

    Explanation

    Reliance on controls is only justified when tests of control show that the control operated effectively throughout the period of intended reliance. Otherwise the auditor must set control risk at the maximum and expand substantive procedures.

  38. Question 38Information Systems Auditing Process

    An attribute sample of 60 payments reveals 5 deviations, while the auditor's tolerable deviation rate is 3 percent. The auditor should conclude that:

    1. The control cannot be relied upon and substantive testing should increase Correct answer.
    2. The population is acceptable because deviations were only about 8 percent
    3. The control can be relied upon because 55 of 60 items complied
    4. The sample result can be disregarded as it falls within sampling risk

    Explanation

    When the observed deviation rate exceeds the tolerable rate, the auditor cannot conclude that the control operated effectively and must reduce reliance on it. The response is to increase substantive procedures to obtain assurance from another source.

  39. Question 39Information Systems Auditing Process

    The authority of an IS audit function to access an organization's systems, records, and personnel is derived primarily from:

    1. the IT operations manual maintained by systems management
    2. the annual audit plan prepared by the audit team
    3. an audit charter approved by the board or audit committee Correct answer.
    4. the seniority of the chief audit executive within the IT organization

    Explanation

    An audit charter is the formal document, approved at the highest governance level, that establishes the audit function's purpose, authority, and responsibility, including rights of access to records, systems, and personnel. Without such a mandate, access depends on the goodwill of management being audited. The audit plan and operational manuals do not confer authority.

  40. Question 40Information Systems Auditing Process

    An IS auditor finds that database backups are never restore-tested, although the organization's backup standard requires quarterly restore tests. In the audit finding, the requirement for quarterly restore tests represents which element?

    1. Effect
    2. Criteria Correct answer.
    3. Cause
    4. Condition

    Explanation

    A finding is structured around criteria (the requirement or expectation), condition (what was actually observed), cause (why the gap occurred), and effect (the resulting risk or impact). The documented standard mandating quarterly restore tests is the benchmark against which the observed state is measured, so it is the criteria. The absence of testing is the condition.

  41. Question 41Governance and Management of Information Technology

    Which body typically provides oversight of IT strategy and ensures that it remains aligned with business objectives?

    1. An IT steering committee Correct answer.
    2. The service desk supervisor
    3. The data center operations team
    4. The internal audit function

    Explanation

    An IT steering committee is the governance forum in which senior business and IT management set IT direction, prioritize investments and monitor performance against business objectives. Audit provides independent assurance, and operational teams execute rather than govern.

  42. Question 42Governance and Management of Information Technology

    What is the primary objective of IT governance?

    1. Resolving end-user password reset requests
    2. Negotiating volume discounts for hardware purchases on behalf of business units
    3. Ensuring IT is aligned with and supports the organization's strategies and objectives Correct answer.
    4. Managing daily server backup schedules

    Explanation

    IT governance exists to ensure that IT sustains and extends the organization's strategy and objectives through evaluation, direction and monitoring. Operational tasks such as backups and password resets are management activities, not governance.

  43. Question 43Governance and Management of Information Technology

    Who is normally accountable for determining the classification and quality requirements of a business data set?

    1. The information security administrator
    2. The database administrator who maintains the tables
    3. The accountable business data owner Correct answer.
    4. The external auditor

    Explanation

    Accountability for data rests with the business data owner, who understands the data's purpose and sensitivity and therefore sets classification and quality requirements. IT roles such as database and security administrators act as custodians implementing those requirements.

  44. Question 44Governance and Management of Information Technology

    Which of the following best describes an IT standard?

    1. A high-level statement of management intent
    2. A documented approval to deviate from a requirement
    3. A mandatory specification that supports a policy and must be met Correct answer.
    4. A step-by-step description of how a specific operational task is carried out

    Explanation

    Standards are mandatory, measurable specifications that translate a policy into concrete requirements, such as approved platforms or configuration baselines. Policies state intent, procedures describe task steps, and exceptions are separately approved deviations.

  45. Question 45Governance and Management of Information Technology

    Why should incompatible duties be separated within an IT function?

    1. It reduces the number of staff required to operate and support the system
    2. It speeds up the deployment of changes into production
    3. It prevents one person from both causing and concealing errors Correct answer.
    4. It removes the need to maintain detailed audit trails

    Explanation

    Segregation of duties ensures that no single individual controls all stages of a transaction, so errors or fraud require collusion to remain hidden. It increases rather than reduces staffing needs and does not replace audit logging.

  46. Question 46Governance and Management of Information Technology

    The IT balanced scorecard commonly uses four perspectives: corporate contribution, user orientation, operational excellence and which other?

    1. Improvement in cash flow
    2. Future orientation Correct answer.
    3. Growth in market share
    4. Reduction in staff turnover

    Explanation

    The IT balanced scorecard adapts the classic model to IT with four perspectives: corporate contribution, user orientation, operational excellence and future orientation. The future orientation perspective addresses the readiness of IT to meet coming business needs.

  47. Question 47Governance and Management of Information Technology

    Which composition is most appropriate for an IT steering committee?

    1. Only senior IT managers
    2. Senior business managers together with senior IT managers Correct answer.
    3. Representatives of the main technology vendors
    4. Only members of the internal audit team

    Explanation

    Effective IT governance requires shared ownership, so the steering committee must include senior business managers as well as senior IT managers. An IT-only body cannot prioritize investments by business value, and vendors are not part of the organization's governance.

  48. Question 48Governance and Management of Information Technology

    Which of the following is a key deliverable of the IT strategic planning process?

    1. A long-range IT plan aligned with business goals Correct answer.
    2. Monthly backup success reports
    3. The most recent disaster recovery test log
    4. A list of unresolved help desk tickets

    Explanation

    IT strategic planning produces a forward-looking plan that maps technology direction, investments and capabilities to business goals. Operational reports such as ticket lists, test logs and backup results are execution artefacts.

  49. Question 49Governance and Management of Information Technology

    Who should approve a major new IT investment?

    1. The vendor supplying the hardware and software
    2. The project manager responsible for delivering the solution
    3. The board or its delegated investment committee Correct answer.
    4. The IT operations supervisor on duty

    Explanation

    Significant IT investments require approval at a level with authority over enterprise resources, normally the board or a committee to which it delegates that authority, acting on a documented business case. Delivery staff, suppliers and operational supervisors cannot authorize enterprise spending.

  50. Question 50Governance and Management of Information Technology

    In the CMMI staged representation, which maturity level is characterized by standardized, documented processes that are not yet quantitatively measured?

    1. Quantitatively managed
    2. Initial
    3. Optimizing
    4. Defined Correct answer.

    Explanation

    At the Defined level, processes are standardized, documented and deployed across the organization, but performance is not yet controlled with statistical measures. Quantitative measurement begins at the next level, and continuous improvement characterizes the highest level.

  51. Question 51Governance and Management of Information Technology

    What is a principal benefit of charging business units for the IT services they consume?

    1. It makes business units accountable for the services they consume Correct answer.
    2. It eliminates the need for service level agreements
    3. It removes the need for an annual IT budget
    4. It guarantees that IT costs will be lower

    Explanation

    Chargeback makes demand and cost visible to business units, encouraging consumption discipline and accountability for the services they request. It does not by itself reduce total cost and must be supported by an IT budget and service level agreements.

  52. Question 52Governance and Management of Information Technology

    Which measure best demonstrates whether an IT service is meeting its availability commitment?

    1. Average time to resolve password resets
    2. Uptime achieved as a percentage of agreed service hours Correct answer.
    3. Number of change requests raised per month
    4. Percentage of staff who completed training

    Explanation

    Availability is measured by comparing actual uptime to the service hours agreed in the service level agreement. Change volume, incident resolution time and training completion measure other dimensions of performance.

  53. Question 53Governance and Management of Information Technology

    For IT to be effectively aligned with business strategy, the chief information officer should ideally report to whom?

    1. The facilities manager for the data center
    2. The IT operations manager
    3. The primary external IT service provider
    4. The chief executive officer or the executive team Correct answer.

    Explanation

    Reporting at the executive level gives the CIO the authority and visibility to align technology decisions with enterprise strategy. Reporting to a subordinate operational role or to a supplier would limit that authority and independence.

  54. Question 54Governance and Management of Information Technology

    Which control is most important when a critical IT service is outsourced?

    1. Requiring the vendor to use the organization's standard laptop models
    2. Allowing the vendor to set its own performance targets
    3. Transferring all accountability for the service to the vendor
    4. A contract with agreed service levels and a right-to-audit clause Correct answer.

    Explanation

    Outsourcing transfers execution but not accountability, so the contract must define measurable service levels and give the organization the right to audit and monitor the provider. Without these provisions, management has no basis to assure the service.

  55. Question 55Governance and Management of Information Technology

    Who should define the organization's IT risk appetite?

    1. Executive management, based on business objectives Correct answer.
    2. The external penetration testing firm
    3. The IT service desk manager
    4. The database administrator

    Explanation

    Risk appetite reflects how much risk the organization is willing to accept in pursuit of its objectives, so it must be set by executive management and endorsed by the board. Technical and external parties inform the assessment but cannot set the tolerance.

  56. Question 56Governance and Management of Information Technology

    What is the primary purpose of an enterprise architecture function?

    1. Writing and testing application code
    2. Approving user access requests
    3. Operating the network infrastructure
    4. Defining standards and structures that link business and IT Correct answer.

    Explanation

    Enterprise architecture describes the current and target state of business processes, data, applications and technology, and sets standards that keep IT change coherent. It guides design decisions rather than performing development or operations.

  57. Question 57Governance and Management of Information Technology

    What is the main purpose of maintaining an up-to-date IT asset inventory?

    1. It increases the number of devices under warranty
    2. It reduces the number of IT staff required
    3. It supports licensing, patching and risk decisions Correct answer.
    4. It removes the need for a configuration management database

    Explanation

    An accurate inventory is the foundation for knowing what must be licensed, patched, protected and eventually retired, and it underpins risk assessment. It feeds configuration management rather than replacing it and has no direct effect on staffing or warranty coverage.

  58. Question 58Governance and Management of Information Technology

    What is the primary role of a project management office within IT?

    1. Executing all technical project tasks itself
    2. Providing standards, oversight and reporting for IT projects Correct answer.
    3. Operating the IT service desk
    4. Purchasing software licenses on behalf of users

    Explanation

    A project management office supplies methodology, portfolio oversight and consolidated reporting so that projects are governed consistently. It does not normally perform the delivery work itself or take over procurement and support functions.

  59. Question 59Governance and Management of Information Technology

    How should an approved exception to an IT security policy be handled?

    1. Designated management, documented and time limited Correct answer.
    2. The vendor that supplied the affected system and its support staff
    3. The employee requesting it approves it
    4. Any IT administrator approves it as needed

    Explanation

    Exceptions must be approved by management with the authority to accept the resulting risk, recorded in a register, and given an expiry date so the residual risk is periodically reconsidered. Self-approval or vendor approval would remove independent scrutiny.

  60. Question 60Governance and Management of Information Technology

    Which action most effectively reduces key-person dependency in a critical IT support role?

    1. Outsourcing the function immediately
    2. Increasing salaries for the key staff members
    3. Restricting documentation to avoid knowledge leaks
    4. Cross-training staff and documenting procedures Correct answer.

    Explanation

    Key-person risk is reduced by spreading knowledge through cross-training and by capturing procedures so that others can perform the work. Higher pay and outsourcing may retain or move the dependency without eliminating it, and limiting documentation increases the risk.

  61. Question 61Governance and Management of Information Technology

    The board is concerned that IT investments are not delivering expected benefits. Which governance mechanism best addresses this?

    1. Post-implementation reviews against the business case Correct answer.
    2. Requiring all projects to be delivered using agile methods
    3. Approving a larger IT budget for the following fiscal year
    4. Delegating benefit realization to the solution vendor

    Explanation

    Benefit realization is governed by comparing actual outcomes with the approved business case after implementation and reporting the results to the investment owner. Increased budget or a delivery method change does not create accountability for benefits.

  62. Question 62Governance and Management of Information Technology

    An organization is preparing to outsource its data center. Which contract provision most protects the organization at the end of the agreement?

    1. Defined exit assistance with data return and destruction obligations Correct answer.
    2. A discount on future services from the same provider
    3. A clause letting the vendor change subcontractors freely
    4. A requirement that the vendor adopt the organization's email signature

    Explanation

    Exit provisions ensure that systems and data can be transitioned or securely destroyed and that the provider must assist during termination, avoiding lock-in. Unrestricted subcontracting and cosmetic requirements do not protect continuity at contract end.

  63. Question 63Governance and Management of Information Technology

    Which statement best distinguishes IT governance from IT management?

    1. Governance executes plans while management sets direction
    2. Governance evaluates, directs and monitors; management plans and runs Correct answer.
    3. Governance is performed only by external auditors
    4. They describe the same activities performed at different points in time

    Explanation

    Governance sets direction and evaluates and monitors performance against objectives, whereas management plans, builds, runs and monitors the activities that deliver services. The two are complementary but not identical.

  64. Question 64Governance and Management of Information Technology

    Which observation provides the strongest evidence that IT governance is effective?

    1. All IT staff hold professional certifications
    2. Risks are managed within the approved appetite Correct answer.
    3. IT spending is lower than that of industry peers
    4. The IT function has no outstanding audit findings

    Explanation

    Effective governance is demonstrated when IT risk is kept within the tolerance set by the board and performance is transparently reported, showing that direction and monitoring actually work. Low spend, clean audit reports and certifications are indicators of specific conditions rather than of governance effectiveness.

  65. Question 65Governance and Management of Information Technology

    A new data protection regulation is about to take effect. What should the IT governance body do first?

    1. Perform a gap assessment against the new requirements Correct answer.
    2. Transfer all responsibility to the legal department
    3. Purchase a new compliance tool without further analysis
    4. Wait for the regulator to issue guidance or fines

    Explanation

    The first step is to determine how current practices and controls compare with the new obligations, so that the resulting gaps can be prioritized and resourced. Tool purchases, delegated ownership and delay all act before the exposure is understood.

  66. Question 66Governance and Management of Information Technology

    An organization's policy states that all laptops must have their storage encrypted. Which document type specifies that AES-256 encryption with a defined key-management method must be used?

    1. A technical standard Correct answer.
    2. A service level agreement
    3. A risk register entry
    4. A procedure

    Explanation

    Policies state management intent at a high level, while standards translate that intent into specific, mandatory technical requirements that must be met. Procedures then describe the step-by-step actions to comply.

  67. Question 67Governance and Management of Information Technology

    Which body typically provides the board with independent assurance over IT risk management and the effectiveness of IT controls?

    1. The project management office
    2. The IT operations management team
    3. The audit committee Correct answer.
    4. The change advisory board

    Explanation

    The audit committee, composed largely of independent directors, gives the board objective assurance on risk and control without being part of IT execution. Operating groups such as IT operations or a PMO are part of management and cannot assure their own work independently.

  68. Question 68Governance and Management of Information Technology

    IT portfolio management is best described as which of the following?

    1. Scheduling IT staff to handle incoming support requests
    2. Reviewing application code before each release
    3. Managing IT investments as a group to balance risk and value Correct answer.
    4. Maintaining an inventory of data center hardware

    Explanation

    Portfolio management treats investments, programmes and assets collectively so that resource allocation, risk and return are balanced against strategy. It is distinct from operational scheduling, technical quality control or asset tracking.

  69. Question 69Governance and Management of Information Technology

    In a data governance program, who is accountable for deciding which parties may access a data domain and for the quality of that data?

    1. The information security officer
    2. The data owner Correct answer.
    3. The service desk manager
    4. The database administrator

    Explanation

    The data owner is a business role accountable for a data domain, including access decisions and data quality. Custodians such as administrators implement the owner's decisions but do not carry the accountability.

  70. Question 70Governance and Management of Information Technology

    One ERP administrator can both create new vendors and approve payments to them. Which control best addresses the resulting exposure?

    1. Force the administrator to change the password every 30 days
    2. Review the administrator's activity logs every quarter
    3. Separate vendor creation from payment approval across different individuals Correct answer.
    4. Require a second administrator to countersign each payment run

    Explanation

    The exposure is a conflict of duties that allows a fictitious vendor to be created and paid, so the preventive fix is to split the incompatible duties. Logging and password rules detect or delay misuse but leave the ability to commit and conceal fraud in one person.

  71. Question 71Governance and Management of Information Technology

    A legacy system cannot be patched but is still required by the business. Management isolates it on a segmented network and adds continuous monitoring. Which risk response has been applied?

    1. Risk transfer
    2. Risk avoidance
    3. Risk mitigation Correct answer.
    4. Risk acceptance

    Explanation

    The organization keeps the activity but reduces the likelihood or impact of the risk through compensating controls, which is mitigation. Avoidance would mean stopping the activity, and transfer would require shifting the financial consequence to a third party such as an insurer.

  72. Question 72Governance and Management of Information Technology

    An organization buys new servers, capitalizes them and depreciates them over five years. How should this spending be classified in the IT budget?

    1. A capital expenditure Correct answer.
    2. A discretionary training cost
    3. A chargeback to business units
    4. A recurring operational expense

    Explanation

    Spending on long-lived assets that is capitalized and depreciated over time is a capital expenditure. Operational expenses are consumed within the period, and chargeback is a recovery mechanism rather than a budget classification.

  73. Question 73Governance and Management of Information Technology

    Which measure provides the earliest warning of deteriorating stability in an IT service?

    1. Total cost of unplanned downtime last year
    2. Percentage of service level breaches last month
    3. Number of incidents recorded last quarter
    4. Rising count of aging problem records awaiting root-cause resolution Correct answer.

    Explanation

    Growing backlogs of unresolved problems signal latent defects that will generate future incidents, making it a leading indicator. Counts of past incidents, breaches and downtime are lagging indicators that report what has already happened.

  74. Question 74Governance and Management of Information Technology

    Before engaging a new cloud provider for a critical service, which activity best informs the risk-based decision?

    1. A review of the provider's marketing collateral
    2. Due diligence on the provider's controls and financial standing Correct answer.
    3. A visit to the provider's regional sales office
    4. A comparison of the provider's share price with peers

    Explanation

    Due diligence on control maturity and financial viability gives evidence on the two dominant third-party risks: service and control failure, and provider insolvency. Promotional material, sales premises and share-price comparisons do not evidence control capability or stability of service delivery.

  75. Question 75Governance and Management of Information Technology

    Business units are increasingly buying SaaS tools with their own budgets and without IT involvement. Which governance response is most effective?

    1. Move all such spending into the central IT budget
    2. Block all traffic to unapproved cloud services without exception
    3. Require each business unit to sign an annual compliance attestation
    4. Provide a fast approval route and a catalogue of sanctioned services Correct answer.

    Explanation

    Shadow IT persists when the sanctioned path is slower than buying directly, so reducing friction while making approved options visible addresses the cause. Blanket blocking drives usage further underground, and attestations or budget moves do not change the incentive to bypass IT.

  76. Question 76Governance and Management of Information Technology

    What is the primary purpose of a post-implementation review of a completed IT project?

    1. To compare realized benefits with the approved business case Correct answer.
    2. To identify who was responsible for schedule overruns
    3. To authorize payment of the vendor's final invoice
    4. To refresh the disaster recovery plan documentation

    Explanation

    A post-implementation review closes the loop on the investment by testing whether the promised benefits and outcomes were actually delivered. Assigning blame and paying invoices are not review objectives, and DR documentation updates belong to continuity management.

  77. Question 77Governance and Management of Information Technology

    To which reporting line should the information security function ideally report so that its independence is preserved?

    1. A risk or executive officer outside IT operations Correct answer.
    2. The IT operations manager
    3. The data center manager
    4. The network engineering lead

    Explanation

    Security must be able to set and challenge controls over the same operations it oversees, which requires a reporting line outside the IT delivery chain. Reporting to operational managers creates a conflict because security would be assessing its own chain of command.

  78. Question 78Governance and Management of Information Technology

    The board states that it will accept no more than four hours of downtime for the order system. This statement is best described as which of the following?

    1. A risk appetite describing the general level of risk the board seeks
    2. A risk tolerance that translates appetite into a measurable limit Correct answer.
    3. A control objective belonging to change management
    4. A key risk indicator used to monitor suppliers

    Explanation

    Risk appetite is the broad level of risk the organization is willing to pursue, while tolerance is the quantified boundary derived from it. A stated maximum of four hours of downtime is a measurable limit, therefore a tolerance.

  79. Question 79Governance and Management of Information Technology

    In a federated IT governance model, which decision is most appropriately retained at the center?

    1. Scheduling of business unit training sessions
    2. Selection of tools used by individual business units
    3. Enterprise architecture standards and security policies Correct answer.
    4. Prioritization of local enhancement requests

    Explanation

    Federation delegates local delivery choices while centralizing decisions whose inconsistency would create enterprise-wide risk or cost. Architecture standards and security policy must be uniform, whereas tool selection, training logistics and local priorities can sit with business units.

  80. Question 80Governance and Management of Information Technology

    Management wants advance warning that a critical outsourced service may soon fail. Which measure serves that purpose best?

    1. Customer satisfaction score from the annual survey
    2. Total remaining value of the outsourcing contract
    3. Rising unresolved supplier escalations and supplier staff turnover Correct answer.
    4. Number of service level breaches reported last year

    Explanation

    A key risk indicator should move before the loss event, and both escalating unresolved issues and supplier attrition signal weakening delivery capacity. Breach counts and annual satisfaction scores describe past performance rather than emerging risk.

  81. Question 81Information Systems Acquisition, Development & Implementation

    During which phase of the systems development life cycle are user information needs analyzed and documented in detail?

    1. Feasibility study
    2. Implementation and coding
    3. Requirements definition Correct answer.
    4. Detailed system design

    Explanation

    Requirements definition is the phase in which current and future user information needs are analyzed and formally documented, usually as a functional requirements specification. Everything downstream (design, coding, testing) is built on and traced back to these requirements.

  82. Question 82Information Systems Acquisition, Development & Implementation

    Which type of testing is performed primarily by business users to confirm that the system supports their processes?

    1. Unit testing performed by programmers
    2. Regression testing performed after changes
    3. Integration testing of interfacing modules
    4. User acceptance testing Correct answer.

    Explanation

    User acceptance testing is executed by business users against agreed requirements and business processes, and it produces the formal sign-off to go live. It is the last test level before implementation and is owned by the user community rather than the technical team.

  83. Question 83Information Systems Acquisition, Development & Implementation

    Which changeover approach requires the old and new systems to operate simultaneously for a period?

    1. Direct cutover
    2. Phased implementation
    3. Pilot implementation
    4. Parallel changeover Correct answer.

    Explanation

    In parallel changeover both the old and the new system run at the same time so that outputs and reconciliations can be compared, with the old system as a fallback. The cost is duplicated processing effort, which is why the overlap period is usually kept short.

  84. Question 84Information Systems Acquisition, Development & Implementation

    Which document is issued to invite vendors to submit proposals against a defined set of requirements?

    1. Request for proposal Correct answer.
    2. Request for information
    3. Service level agreement
    4. Statement of work

    Explanation

    A request for proposal states the organization's requirements and asks vendors to respond with a proposed solution, approach and price, enabling a structured comparison. It is appropriate when requirements are reasonably well defined and competitive bids are desired.

  85. Question 85Information Systems Acquisition, Development & Implementation

    Which feasibility assessment determines whether the organization has the technology and skills to build and operate the proposed system?

    1. Technical feasibility Correct answer.
    2. Legal feasibility
    3. Economic feasibility
    4. Operational feasibility

    Explanation

    Technical feasibility examines whether the required hardware, software, skills and infrastructure exist or can realistically be obtained. It is distinct from whether the project is affordable, acceptable to users or compliant with regulation.

  86. Question 86Information Systems Acquisition, Development & Implementation

    The primary purpose of a post-implementation review is to:

    1. Verify that individual programs meet coding standards
    2. Obtain financial credits from the vendor for late delivery
    3. Confirm expected benefits and record lessons learned Correct answer.
    4. Assign accountability for defects found in production

    Explanation

    A post-implementation review, conducted after the system has been in operation for a period, compares actual results with the original business case and captures lessons learned for future projects. It is a benefits-realization and improvement activity, not a fault-finding or contract-enforcement exercise.

  87. Question 87Information Systems Acquisition, Development & Implementation

    Source code escrow primarily protects the buyer against:

    1. Claims of copyright infringement brought by third parties
    2. Excessive annual licensing fees charged by the vendor
    3. Loss of data during the migration to the new system
    4. Vendor failure or withdrawal of product support Correct answer.

    Explanation

    Escrow places a copy of the source code and related materials with a neutral third party, released to the buyer if the vendor fails, becomes insolvent or stops supporting the product. It preserves the buyer's ability to maintain and modify the software in those circumstances.

  88. Question 88Information Systems Acquisition, Development & Implementation

    Unit testing is normally the responsibility of:

    1. The database administrator
    2. Developers of the code Correct answer.
    3. Internal audit staff
    4. End users from the business

    Explanation

    Unit testing verifies that an individual program or module performs as designed and is performed by the developers who wrote the code, often supported by test data and peer review. Independent verification comes later at integration, system and user acceptance testing.

  89. Question 89Information Systems Acquisition, Development & Implementation

    After a defect fix is applied to a module, which type of testing confirms that previously working functionality still works?

    1. User acceptance testing
    2. Parallel testing
    3. Regression testing Correct answer.
    4. Stress testing

    Explanation

    Regression testing re-executes a defined set of existing test cases after a change to confirm that no previously working function has been broken. It is normally repeated for each release or patch, ideally using an automated test suite.

  90. Question 90Information Systems Acquisition, Development & Implementation

    Which is a defining characteristic of agile development?

    1. All requirements are frozen before design begins
    2. Working software is delivered in short iterations Correct answer.
    3. Comprehensive documentation is produced before coding starts
    4. Testing is performed as a single phase at the end

    Explanation

    Agile methods deliver software incrementally in short, time-boxed iterations with continuous user feedback and testing embedded in each cycle. Requirements are expected to evolve, and documentation is produced as needed rather than fully up front.

  91. Question 91Information Systems Acquisition, Development & Implementation

    A key risk of prototyping when it is not properly controlled is that:

    1. Developers learn the requirements too slowly
    2. Project documentation becomes excessively detailed
    3. Users may treat the prototype as production-ready Correct answer.
    4. The prototype cannot be reviewed by end users

    Explanation

    Because a prototype typically demonstrates screens and functions without production-grade controls, performance or data integrity, users may assume the final system will look and behave exactly the same. Management must make clear that the prototype is a requirements vehicle and confirm which features will actually be delivered.

  92. Question 92Information Systems Acquisition, Development & Implementation

    During data migration to a new system, which control best verifies that all records were transferred completely?

    1. Reconciling record counts and control totals Correct answer.
    2. Interviewing end users about the completeness of migrated data
    3. Reviewing the source code of the data migration program
    4. Obtaining vendor certification for the migration utility

    Explanation

    Reconciling record counts, hash totals and financial control totals between the source and target databases provides objective, verifiable evidence that no records were lost or duplicated. It tests the actual output rather than the intent of the process.

  93. Question 93Information Systems Acquisition, Development & Implementation

    Which practice best mitigates the risk of unauthorized changes to production application code?

    1. Developers are required to document changes after deployment
    2. Developers have no direct access to production Correct answer.
    3. Production changes are logged by the operations team on request
    4. Changes are reviewed by the developer's own project manager

    Explanation

    Segregation of duties requires that the people who write code cannot promote it into production; promotion is performed by an independent operations or release function after approval. This prevents a developer from modifying production logic without detection or authorization.

  94. Question 94Information Systems Acquisition, Development & Implementation

    The primary purpose of configuration management during systems development is to:

    1. Track project costs against the approved budget
    2. Identify and control versions of software components Correct answer.
    3. Ensure hardware is purchased at the lowest available cost
    4. Assign development tasks to individual programmers

    Explanation

    Configuration management identifies the components of a system, records their versions and baselines, and controls changes to them so that the correct combination of code, data and documentation is assembled and released. It provides the traceability and integrity underpinning change control.

  95. Question 95Information Systems Acquisition, Development & Implementation

    In a project network diagram, the critical path is:

    1. The path with the lowest total cost
    2. The longest dependent sequence of activities Correct answer.
    3. The sequence of activities with the largest resource allocation
    4. The activities that can be delayed without affecting the deadline

    Explanation

    The critical path is the longest chain of dependent activities through the network and therefore determines the shortest possible project duration. Any delay on a critical path activity directly delays the project end date, and it carries zero float.

  96. Question 96Information Systems Acquisition, Development & Implementation

    A development project reports a cost performance index (CPI) of 0.85. This indicates that the project is:

    1. Ahead of schedule
    2. Under budget
    3. Delivering more scope than planned
    4. Spending more than the value of work performed Correct answer.

    Explanation

    CPI is earned value divided by actual cost; a value below 1.0 means each unit of cost is buying less work than planned, so the project is over budget. Schedule performance is measured separately by the schedule performance index.

  97. Question 97Information Systems Acquisition, Development & Implementation

    Function point analysis is used to:

    1. Measure the number of defects found during system testing
    2. Calculate the payback period of the development investment
    3. Estimate software size from functional requirements Correct answer.
    4. Count the number of source lines of code in the delivered system

    Explanation

    Function point analysis measures the functional size of software from the user's perspective, based on inputs, outputs, inquiries, files and interfaces. Because it is technology independent, it allows comparisons and productivity estimates across different platforms and languages.

  98. Question 98Information Systems Acquisition, Development & Implementation

    When acquiring a commercial off-the-shelf package, a gap analysis is performed to:

    1. Determine whether the package source code is held in escrow
    2. Compare the vendor's financial statements with industry averages
    3. Identify gaps between package functionality and business needs Correct answer.
    4. Assess the vendor's market share in the target industry

    Explanation

    Gap analysis compares the standard functionality of the package with the organization's requirements to determine which needs are met, which require configuration or customization, and which must be met through process change or a bolt-on. The result drives cost, risk and fit decisions.

  99. Question 99Information Systems Acquisition, Development & Implementation

    In a pilot implementation, the new system is:

    1. Introduced in one unit before rollout to other units Correct answer.
    2. Introduced one module at a time across the organization
    3. Introduced to all locations simultaneously
    4. Run in parallel with the old system at all sites

    Explanation

    A pilot installs the complete new system in a single location or business unit so that problems can be corrected before the wider rollout. It limits exposure while still testing the full system in a live environment.

  100. Question 100Information Systems Acquisition, Development & Implementation

    Which of the following is a non-functional requirement?

    1. The system shall respond to a query within two seconds Correct answer.
    2. The system shall record the employee ID on each transaction
    3. The system shall let users reset their own passwords
    4. The system shall calculate sales tax for each order

    Explanation

    Non-functional requirements describe quality attributes and constraints such as performance, availability, security and capacity, rather than specific behaviors. A two-second response time is a performance attribute and therefore non-functional.

  101. Question 101Information Systems Acquisition, Development & Implementation

    A production outage requires an emergency code fix. Which control is most important in this situation?

    1. A manager authorizes it, and it is documented and reviewed afterward Correct answer.
    2. The developer applies the fix directly to production to minimize downtime
    3. The fix is tested only by its developer, in production
    4. The change is deferred to the next scheduled release window

    Explanation

    Emergency changes still require authorization by an appropriate manager before implementation, and full documentation plus retrospective review by the change authority afterward. This preserves accountability and auditability while allowing rapid restoration of service.

  102. Question 102Information Systems Acquisition, Development & Implementation

    Under a fixed-price contract for custom development, the risk of cost overruns is borne primarily by:

    1. The vendor Correct answer.
    2. Both parties equally
    3. The project sponsor
    4. The buyer

    Explanation

    In a fixed-price contract the vendor commits to deliver defined scope for a set price, so overruns erode the vendor's margin and the risk sits with the vendor. This is appropriate only when requirements are stable and clearly specified, otherwise the vendor prices in contingency or disputes scope.

  103. Question 103Information Systems Acquisition, Development & Implementation

    An organization is evaluating a project with a $1,000,000 initial outlay and expected annual net cash inflows over six years. Which technique best accounts for the time value of money when deciding whether to proceed?

    1. Return on investment
    2. Break-even analysis
    3. Net present value Correct answer.
    4. Payback period

    Explanation

    Net present value discounts all future cash flows to present value using the organization's cost of capital and compares the total with the initial investment. A positive NPV means the project adds value after accounting for the time value of money, which the simpler techniques ignore.

  104. Question 104Information Systems Acquisition, Development & Implementation

    Which statement best distinguishes certification from accreditation of a system?

    1. Certification is a one-time activity, accreditation is repeated monthly
    2. Certification is performed by users, accreditation by developers
    3. The two terms are interchangeable in practice
    4. Certification evaluates the controls; accreditation authorizes operation Correct answer.

    Explanation

    Certification is the technical and independent evaluation confirming that a system and its controls meet specified security and functional requirements. Accreditation is the management decision, based on that certification, to formally authorize the system to operate and accept the residual risk.

  105. Question 105Information Systems Acquisition, Development & Implementation

    In a continuous integration and delivery pipeline, which control best preserves the intent of segregation of duties between development and production?

    1. Removing version control to speed up releases
    2. Automated test gates and independent approval before promotion Correct answer.
    3. Restricting developers from viewing test results
    4. Requiring developers to deploy their own code to production

    Explanation

    Automation does not eliminate segregation of duties; it must be embedded in the pipeline through enforced automated testing and an approval by someone other than the code author before promotion to production. This keeps the developer from being able to move unverified code into production single-handedly.

  106. Question 106Information Systems Acquisition, Development & Implementation

    Which document provides the formal justification for investing in a proposed information system by comparing expected benefits with estimated costs?

    1. The feasibility baseline
    2. The request for proposal
    3. The system requirements specification
    4. The business case Correct answer.

    Explanation

    A business case sets out costs, benefits, risks and options so management can decide whether to fund a project. It is prepared before detailed design and is revisited at project gateways.

  107. Question 107Information Systems Acquisition, Development & Implementation

    An organization wants competing vendors to submit formal, comparable offers for a defined solution. Which document should it issue?

    1. A service level agreement
    2. A statement of work
    3. A request for proposal Correct answer.
    4. A memorandum of understanding

    Explanation

    A request for proposal states the requirements and the evaluation criteria so that vendor responses can be assessed consistently. The statement of work is the contractual description of work that emerges after selection.

  108. Question 108Information Systems Acquisition, Development & Implementation

    Which type of testing is performed by end users to confirm that a system satisfies business requirements before it is formally accepted?

    1. Stress testing
    2. Acceptance testing Correct answer.
    3. Integration testing
    4. System testing

    Explanation

    Acceptance testing is user-driven and establishes fitness for business purpose; its outcome is the basis for formal sign-off by the business owner.

  109. Question 109Information Systems Acquisition, Development & Implementation

    In a traditional waterfall life cycle, which phase follows the design phase?

    1. Post-implementation review
    2. Construction and testing Correct answer.
    3. Requirements definition
    4. Feasibility study

    Explanation

    Waterfall phases run in sequence: feasibility, requirements, design, construction and testing, implementation, then review. Construction begins only once the design is baselined.

  110. Question 110Information Systems Acquisition, Development & Implementation

    Which technique best supports an objective comparison of competing vendor proposals against several weighted criteria?

    1. A cost-plus contract
    2. A gap analysis of the current environment
    3. A request for information
    4. A weighted scoring model Correct answer.

    Explanation

    A weighted scoring model assigns weights to criteria such as cost, functionality and support, then scores each proposal so totals are comparable and defensible. It reduces subjective bias in selection.

  111. Question 111Information Systems Acquisition, Development & Implementation

    Which level of testing verifies that data passed between application modules is handled correctly?

    1. Recovery testing
    2. Stress testing
    3. Integration testing Correct answer.
    4. Unit testing

    Explanation

    Integration testing concentrates on interfaces and the flow of data between components that have already passed unit testing. It exposes mismatches in data formats, timing and assumptions between modules.

  112. Question 112Information Systems Acquisition, Development & Implementation

    What is the primary purpose of normalizing a logical data model?

    1. To document the business rules that apply to each entity
    2. To reduce data redundancy and prevent update anomalies Correct answer.
    3. To improve the speed of query response times in production
    4. To define user access privileges for each table in the schema

    Explanation

    Normalization structures data so that each fact is stored once, removing redundancy that causes insertion, update and deletion anomalies. Performance is addressed later through physical design choices such as denormalization.

  113. Question 113Information Systems Acquisition, Development & Implementation

    What is the primary benefit of running the old and new systems in parallel during cutover?

    1. It provides a fallback and allows results to be compared. Correct answer.
    2. It removes the need for data reconciliation.
    3. It shortens the total implementation effort.
    4. It allows the new system to be used by only one business unit.

    Explanation

    Parallel running lets the organization compare outputs from both systems and revert to the old one if the new system fails. The trade-off is duplicated processing cost and reconciliation effort.

  114. Question 114Information Systems Acquisition, Development & Implementation

    Which contract clause best preserves an organization's ability to examine an outsourced developer's controls over its data?

    1. Most-favoured-customer pricing
    2. Right to audit Correct answer.
    3. Acceptance criteria
    4. Penalty for late delivery

    Explanation

    A right-to-audit clause obliges the vendor to permit inspection and often to supply independent assurance reports, allowing the buyer to verify controls. The clause should specify scope, notice period and frequency.

  115. Question 115Information Systems Acquisition, Development & Implementation

    Which approach gathers requirements through structured workshops that bring business users and developers together?

    1. Rapid application development
    2. Joint application development Correct answer.
    3. Benchmarking
    4. Reverse engineering

    Explanation

    Joint application development uses facilitated workshops in which users and technical staff agree requirements in a compressed timeframe, reducing later rework. The facilitated session and group consensus are its defining features.

  116. Question 116Information Systems Acquisition, Development & Implementation

    A test team needs realistic volumes of data to test a new application. Which control is most important when production data is used?

    1. Retaining all test results until the project is closed
    2. Restricting test runs to off-peak hours
    3. Requiring the test lead to approve the test plan
    4. Masking sensitive data before copying it to the test environment Correct answer.

    Explanation

    Production data in test environments exposes personal and confidential information to a larger, less controlled population. De-identifying or masking it preserves realism while limiting disclosure risk.

  117. Question 117Information Systems Acquisition, Development & Implementation

    At which point in a systems development project should availability and recovery requirements for a critical system be defined?

    1. During the post-implementation review
    2. During requirements definition, before design is finalized Correct answer.
    3. After the system has been placed in production
    4. When the system is first tested for disaster recovery

    Explanation

    Recovery objectives drive architecture, redundancy and cost, so they must be specified alongside other non-functional requirements. Retrofitting resilience after go-live is expensive and often leaves unacceptable downtime exposure.

  118. Question 118Information Systems Acquisition, Development & Implementation

    A project has a budget at completion of $500,000, actual costs to date of $200,000 and a cost performance index of 0.80. Assuming current performance continues, what is the estimate at completion?

    1. $625,000 Correct answer.
    2. $700,000
    3. $560,000
    4. $400,000

    Explanation

    Estimate at completion equals budget at completion divided by the cost performance index: $500,000 / 0.80 = $625,000. The formula assumes the inefficiency observed so far will persist for the remaining work.

  119. Question 119Information Systems Acquisition, Development & Implementation

    Before engaging an offshore vendor to process customer personal data, which action should the organization take first?

    1. Confirm the transfer is lawful under applicable regulation Correct answer.
    2. Require the vendor to hold a recognized quality certification
    3. Move the data to the vendor's servers so that processing can begin early
    4. Obtain a discount on the contract price to offset the added oversight

    Explanation

    Cross-border transfers are restricted by privacy and data protection laws, which may require contractual safeguards, consent or an adequacy determination. The legal basis must be established before any data leaves the organization.

  120. Question 120Information Systems Acquisition, Development & Implementation

    An organization needs assurance that a vendor-written application contains no hidden functionality such as backdoors. Which control provides the strongest direct evidence?

    1. A vendor self-certification of code quality
    2. Functional acceptance testing by business users
    3. Vulnerability scanning of the production environment
    4. Independent review of the source code Correct answer.

    Explanation

    Concealed code paths may never be triggered by functional testing, so only independent inspection of the delivered source provides direct assurance. The right to review should be secured contractually and should extend to build and release scripts.

  121. Question 121Information Systems Operations and Business Resilience

    Which statement correctly describes the recovery point objective (RPO)?

    1. The time needed to rebuild the primary data center from scratch
    2. The interval that must elapse between successive disaster recovery tests
    3. The maximum time a system may remain unavailable after a disruption
    4. The maximum period for which data may be lost, measured backward from the disruption Correct answer.

    Explanation

    The RPO expresses how much data the business can afford to lose, and is therefore translated into the frequency of backups or replication. It is a data-loss measure, not a downtime measure. Downtime tolerance is expressed by the recovery time objective.

  122. Question 122Information Systems Operations and Business Resilience

    The recovery time objective (RTO) for a business process is best described as:

    1. The period for which backup media must be retained before destruction
    2. The maximum acceptable elapsed time to restore the process after a disruption Correct answer.
    3. The frequency at which backups of the process data are taken
    4. The volume of transactions that may be lost during an outage

    Explanation

    The RTO is the target elapsed time within which a process must be restored so that the business impact stays within tolerance. It drives the choice of recovery strategy, such as hot site versus cold site. It does not measure data loss, which is the RPO.

  123. Question 123Information Systems Operations and Business Resilience

    Which backup method copies only the data that has changed since the most recent backup of any type?

    1. Differential backup
    2. Snapshot copy
    3. Incremental backup Correct answer.
    4. Full backup

    Explanation

    An incremental backup captures changes made since the last backup of any kind, whether full or incremental, which keeps each backup small but lengthens restoration because several sets must be applied. A differential backup captures changes since the last full backup only.

  124. Question 124Information Systems Operations and Business Resilience

    Which RAID level maintains an identical copy of data on two disks so that processing can continue if one disk fails?

    1. RAID 6
    2. RAID 0
    3. RAID 1 Correct answer.
    4. RAID 5

    Explanation

    RAID 1 mirrors data across paired disks, so a single disk failure leaves a complete copy available. RAID 0 stripes without redundancy, and RAID 5 and RAID 6 use parity rather than full duplication.

  125. Question 125Information Systems Operations and Business Resilience

    Which IT service management process is responsible for identifying the underlying cause of recurring incidents?

    1. Problem management Correct answer.
    2. Availability management
    3. Change management
    4. Incident management

    Explanation

    Problem management performs root cause analysis and manages known errors so that recurring incidents are eliminated or their impact reduced. Incident management focuses on restoring service quickly rather than on diagnosis of the underlying defect.

  126. Question 126Information Systems Operations and Business Resilience

    What is the primary role of a change advisory board (CAB)?

    1. Setting the recovery time objectives for critical systems
    2. Implementing approved changes in the production environment
    3. Approving, rejecting or deferring changes on the basis of risk and impact Correct answer.
    4. Investigating the root cause of incidents after a failed change

    Explanation

    The CAB assesses proposed changes against business and technical criteria and authorizes those whose risk is acceptable. Implementation remains with the technical teams, and post-implementation review is a separate control step.

  127. Question 127Information Systems Operations and Business Resilience

    An uninterruptible power supply (UPS) protects IT equipment primarily against:

    1. Sustained outages lasting several days
    2. Heat build-up inside server enclosures
    3. Short interruptions and power quality fluctuations Correct answer.
    4. Physical intrusion into the computer room

    Explanation

    A UPS provides battery-backed power that bridges brief outages and conditions the incoming supply against sags, spikes and transients. It is sized to run equipment only until a generator starts or systems shut down in an orderly manner.

  128. Question 128Information Systems Operations and Business Resilience

    Which agreement formally documents the service levels, responsibilities and performance targets between an IT service provider and its customer?

    1. Service level agreement Correct answer.
    2. Underpinning contract
    3. Configuration baseline
    4. Operational level agreement

    Explanation

    A service level agreement is the customer-facing document that defines measurable service commitments and responsibilities. Operational level agreements and underpinning contracts support the SLA internally and with suppliers respectively.

  129. Question 129Information Systems Operations and Business Resilience

    In a disaster recovery test, the recovery site is activated while the production site continues to operate normally, and selected transactions are processed at both sites and then reconciled. This test is a:

    1. Checklist test
    2. Parallel test Correct answer.
    3. Full interruption test
    4. Simulation test

    Explanation

    A parallel test runs the recovery capability alongside live production so that results can be compared without risking the business. It gives stronger assurance than a checklist or simulation because actual processing occurs at the alternate site.

  130. Question 130Information Systems Operations and Business Resilience

    Which type of disaster recovery test provides the greatest assurance that recovery will work but carries the highest risk to ongoing operations?

    1. Checklist test
    2. Full interruption test Correct answer.
    3. Parallel test
    4. Walkthrough test

    Explanation

    A full interruption test moves production to the recovery site and shuts down the primary site, so it proves the plan end to end but can cause real business disruption if recovery fails. Lower-assurance tests avoid this exposure but leave more uncertainty.

  131. Question 131Information Systems Operations and Business Resilience

    The primary output of a business impact analysis used to build a disaster recovery plan is:

    1. A retention schedule for backup media
    2. A network topology diagram of the primary data center
    3. A list of critical business processes, their dependencies and their maximum tolerable outage Correct answer.
    4. A complete inventory of hardware and software assets

    Explanation

    The business impact analysis identifies which processes are critical, quantifies the impact of their loss over time, and derives recovery objectives and dependencies. Asset inventories and topology diagrams are technical inputs produced after the business requirements are known.

  132. Question 132Information Systems Operations and Business Resilience

    Why should backup media be rotated to a secure offsite location?

    1. It removes the need for periodic restore testing
    2. It protects the backups from an event that destroys the primary site Correct answer.
    3. It shortens the nightly backup window
    4. It reduces the unit cost of backup media

    Explanation

    Offsite storage ensures that at least one usable copy survives a fire, flood or other event affecting the data center. It does not itself validate recoverability, which still requires periodic restore tests.

  133. Question 133Information Systems Operations and Business Resilience

    A checkpoint and restart facility in a batch job scheduling environment primarily:

    1. Encrypts the data written to job output files
    2. Lets a failed job resume from the last checkpoint rather than from the beginning Correct answer.
    3. Distributes a single job across multiple processors
    4. Allows jobs to run without operator intervention

    Explanation

    Checkpointing records intermediate progress so that after a failure the job can restart from the last recorded point, reducing rerun time and repeated processing of transactions. This shortens recovery and lowers the risk of duplicate updates.

  134. Question 134Information Systems Operations and Business Resilience

    Which activity provides the best evidence for capacity planning of a growing transaction processing system?

    1. Rotating backup media through offsite storage
    2. Reviewing access control logs for privileged users
    3. Increasing the frequency of full backups
    4. Trending resource utilization against business growth forecasts Correct answer.

    Explanation

    Capacity planning compares measured consumption trends with forecast business volumes so that additional resources are acquired before service degrades. Utilization data without a business forecast cannot predict when thresholds will be breached.

  135. Question 135Information Systems Operations and Business Resilience

    A configuration management database supports IT operations mainly by:

    1. Storing and encrypting user authentication credentials
    2. Hosting the source code for production applications
    3. Generating the schedule for nightly batch jobs
    4. Recording infrastructure components and the relationships among them Correct answer.

    Explanation

    A configuration management database holds configuration items and their dependencies, which supports impact analysis for changes, incident diagnosis and recovery planning. Without accurate relationship data, teams cannot reliably predict what a change or failure will affect.

  136. Question 136Information Systems Operations and Business Resilience

    Which practice provides the most reliable evidence that backup data can actually be recovered?

    1. Storing a duplicate copy of the backup at an offsite location
    2. Verifying that all backup jobs completed without error messages
    3. Encrypting the backup media before shipment
    4. Periodically performing a test restore of selected data Correct answer.

    Explanation

    Only an actual restore demonstrates that the media, catalog, encryption keys and procedures work together to return usable data. Successful job logs and offsite copies indicate that a copy exists, not that it can be restored.

  137. Question 137Information Systems Operations and Business Resilience

    Compared with a hot site, a warm site:

    1. Has hardware available but requires installation of current data and applications Correct answer.
    2. Depends on another organization's idle capacity under a reciprocal agreement
    3. Is fully equipped and can assume processing immediately
    4. Provides only floor space and power for the recovery team

    Explanation

    A warm site provides a prepared facility and some equipment but needs configuration and data loading before it can process, giving a longer recovery time at lower cost than a hot site. A hot site is ready to operate with current data already replicated.

  138. Question 138Information Systems Operations and Business Resilience

    The main objective of clustering production servers in a high-availability design is to:

    1. Increase the raw storage capacity available to the servers
    2. Reduce the software licensing cost of the environment
    3. Eliminate the need for regular data backups
    4. Provide automatic failover of processing to a secondary node Correct answer.

    Explanation

    Clustering keeps a standby node synchronized so that processing continues with minimal interruption if the active node fails. It addresses availability, but it does not protect against logical data corruption, so backups remain necessary.

  139. Question 139Information Systems Operations and Business Resilience

    Which fire suppression system is most appropriate for an occupied computer room containing live IT equipment?

    1. A clean-agent gaseous system Correct answer.
    2. A deluge system
    3. A wet-pipe sprinkler system
    4. A dry chemical powder system

    Explanation

    Clean-agent systems discharge an electrically non-conductive agent that extinguishes fire without leaving residue and are safe for occupied spaces. Water-based and powder systems cause collateral damage to electronic equipment.

  140. Question 140Information Systems Operations and Business Resilience

    Incidents at a service desk should be prioritized primarily on the basis of:

    1. The impact on business operations combined with the urgency of the incident Correct answer.
    2. The number of staff employed in the affected department
    3. The seniority of the user who reported the incident
    4. The order in which incidents arrive at the service desk

    Explanation

    Priority is derived from impact, meaning the scale of business effect, together with urgency, meaning how quickly the effect will be felt. Arrival order and user seniority are not reliable measures of business consequence.

  141. Question 141Information Systems Operations and Business Resilience

    A business impact analysis shows that a critical system can tolerate no more than four hours of downtime and no more than fifteen minutes of data loss. Which recovery capability best satisfies both requirements?

    1. Continuous data replication to a standby site that can be activated within the recovery time objective Correct answer.
    2. A reciprocal agreement with a nearby organization that runs comparable hardware
    3. Nightly tape backups shipped to an offsite vault, with a cold standby facility
    4. Weekly full backups with restoration performed at the primary site

    Explanation

    A fifteen-minute data-loss tolerance requires replication far more frequent than nightly or weekly backups, and the four-hour downtime tolerance requires a standby environment that can be activated quickly. Both objectives must be met simultaneously by the chosen strategy.

  142. Question 142Information Systems Operations and Business Resilience

    An organization consolidates twelve production servers onto a single physical host without clustering or replication. The most significant new risk created by this consolidation is that:

    1. Software licensing costs will rise because applications now share hardware
    2. The consolidated servers can no longer receive security patches
    3. A failure of the host will cause an outage of all twelve servers Correct answer.
    4. Backup windows will lengthen because more data resides on one device

    Explanation

    Consolidation concentrates many workloads on one physical component, turning the host into a single point of failure unless clustering or replication is implemented. The number of affected services after a hardware fault increases in direct proportion to the consolidation ratio.

  143. Question 143Information Systems Operations and Business Resilience

    What is the most significant limitation of relying on a reciprocal agreement with another organization for disaster recovery?

    1. The partner may be affected by the same disaster and may lack sufficient capacity Correct answer.
    2. It provides no accommodation for the recovery team's staff
    3. It cannot be tested without disrupting the partner's production processing
    4. It requires duplicate software licenses to be purchased for both sites

    Explanation

    Reciprocal arrangements usually pair organizations in the same geographic region, so a regional event can disable both parties at once, and the partner's spare capacity is rarely guaranteed or documented. Because no enforceable commitment exists, the arrangement may fail exactly when it is needed.

  144. Question 144Information Systems Operations and Business Resilience

    An IS auditor finds that utilization on a critical production server has exceeded its defined warning threshold for sixty consecutive days, yet no analysis or action has been recorded. This most directly indicates a weakness in:

    1. Configuration management
    2. Problem management
    3. Change management
    4. Capacity management Correct answer.

    Explanation

    Threshold monitoring exists to trigger capacity analysis and remediation before performance degrades, so unactioned breaches show that the capacity management process is not operating. The underlying issue is the failure to forecast and provision resources, not the handling of a specific defect.

  145. Question 145Information Systems Operations and Business Resilience

    Operations staff are able to move programs directly from development libraries into production libraries without approval. The most significant control weakness created by this situation is that:

    1. Backup jobs will no longer capture the changed programs
    2. Unauthorized or untested code can be placed into production without review Correct answer.
    3. Scheduled batch jobs will not complete within their allotted window
    4. Users will lose the ability to log on to the affected application

    Explanation

    Segregation of duties between development, testing and production promotion prevents programmers from introducing unapproved or untested changes. Without a controlled promotion step supported by approval, integrity of production code cannot be assured.

  146. Question 146Information Systems Operations and Business Resilience

    The primary purpose of problem management within IT service operations is to:

    1. record and classify every user request received by the service desk
    2. restore service to users as quickly as possible after an outage
    3. identify and eliminate the underlying causes of recurring incidents Correct answer.
    4. authorize changes to the production environment

    Explanation

    Problem management investigates the underlying cause of incidents, especially recurring ones, and drives permanent fixes that reduce incident volume. Incident management restores service quickly but does not necessarily remove the defect that caused the failure.

  147. Question 147Information Systems Operations and Business Resilience

    An organization performs a weekly full backup and nightly differential backups. To restore the system after a failure on Thursday evening, the operator must use:

    1. only the Thursday differential backup
    2. the most recent full backup plus each nightly differential taken since the full
    3. the most recent full backup only
    4. the most recent full backup plus the latest differential backup Correct answer.

    Explanation

    A differential backup captures all changes since the last full backup, so recovery requires that full backup plus the most recent differential. Restore time grows only slightly during the week because just two backup sets are needed.

  148. Question 148Information Systems Operations and Business Resilience

    Relative humidity in a data center is controlled primarily to:

    1. suppress fire within the raised floor void
    2. reduce the cooling load on the air-conditioning units
    3. prevent static discharge and condensation on equipment Correct answer.
    4. remove airborne particulate contamination from servers

    Explanation

    Low humidity permits static discharge that can damage components, while high humidity risks condensation on cold surfaces. Both extremes threaten equipment reliability, so humidity is held within a defined band.

  149. Question 149Information Systems Operations and Business Resilience

    A production system has a mean time between failures of 1,000 hours and a mean time to repair of 10 hours. Which action improves availability the most?

    1. increasing MTBF from 1,000 to 2,000 hours
    2. increasing MTBF from 1,000 to 1,500 hours
    3. reducing MTTR from 10 hours to 5 hours
    4. reducing MTTR from 10 hours to 2 hours Correct answer.

    Explanation

    Availability equals MTBF divided by MTBF plus MTTR. Reducing MTTR to two hours yields 1,000/1,002, about 99.80 percent, which exceeds the improvement produced by any of the MTBF increases or the smaller repair-time reduction listed.

  150. Question 150Information Systems Operations and Business Resilience

    An emergency change is required at 2 a.m. to restore a failed payment system. The most appropriate control is to:

    1. wait for the next scheduled change advisory board meeting to obtain approval
    2. bypass the change management process entirely because the situation is urgent
    3. authorize and implement the fix immediately, then document it and obtain retrospective approval Correct answer.
    4. delegate approval to the developer who wrote the affected program

    Explanation

    Emergency changes follow an expedited path in which the fix is applied to restore service and the documentation, testing evidence and approval are completed afterwards. This preserves an audit trail while avoiding a prolonged outage.

  151. Question 151Information Systems Operations and Business Resilience

    Release management differs from change management primarily in that release management:

    1. defines the service level targets agreed with the business customers
    2. approves or rejects individual requests for change raised by users
    3. records and classifies incidents arising from newly deployed components
    4. packages approved changes into a tested set for coordinated deployment Correct answer.

    Explanation

    Release management takes changes already authorized by change management and packages them into a coordinated, tested release that can be deployed with minimal disruption. Change management remains responsible for authorizing individual changes.

  152. Question 152Information Systems Operations and Business Resilience

    In an automated batch environment, a downstream job that reads the output file of an upstream job should be scheduled to start:

    1. as soon as the operator confirms that the upstream job has begun
    2. only when the scheduling software reports that the upstream job completed successfully Correct answer.
    3. in parallel with the upstream job to shorten the batch window
    4. at a fixed time after the scheduled start of the upstream job

    Explanation

    Dependency-based scheduling prevents a downstream job from reading an incomplete or corrupt file produced by a failed upstream job. Fixed-time or operator-observed scheduling does not reliably account for abnormal terminations or unusually long run times.

  153. Question 153Information Systems Operations and Business Resilience

    The retention period for production backup media should be determined primarily by:

    1. legal, regulatory and business requirements for the data Correct answer.
    2. the vendor's recommended tape life expectancy
    3. the frequency of the backup schedule
    4. the storage capacity available in the tape library

    Explanation

    Retention is driven by legal, regulatory and business requirements, which dictate how long records must remain recoverable. Operational factors such as media capacity and tape life determine how retention is achieved, not how long it should be.

  154. Question 154Information Systems Operations and Business Resilience

    The main value of establishing a performance baseline for a production server is that it:

    1. gives a reference point for detecting performance degradation over time Correct answer.
    2. guarantees that the server will meet its agreed service level targets
    3. eliminates the need for ongoing capacity monitoring of the server
    4. documents the hardware vendor's warranty and support terms

    Explanation

    A baseline records normal resource usage and response times under representative workloads. Comparing current measurements with that reference reveals trends and degradation before users are seriously affected.

  155. Question 155Information Systems Operations and Business Resilience

    The most effective control to detect that an overnight batch run has produced incomplete output is:

    1. reconciling record counts and control totals against expected values Correct answer.
    2. archiving the output to tape before it is distributed
    3. requiring operators to sign the batch completion sheet
    4. reviewing the job scheduler's console log the following morning

    Explanation

    Control totals and record counts provide independent, arithmetic evidence that all expected records were processed and passed on. Job logs and operator sign-offs show that a job ran, but not that its output was complete or correct.

  156. Question 156Information Systems Operations and Business Resilience

    Which event should trigger a review and update of the business continuity plan?

    1. the annual external financial audit is completed
    2. a critical application is migrated to a new data center Correct answer.
    3. the organization renews its antivirus subscription
    4. a new service desk tool is deployed to agents

    Explanation

    The plan must be updated whenever a change alters the assumptions on which it was built, such as relocating a critical system to a different facility. Routine administrative events generally do not change recovery capability.

  157. Question 157Information Systems Operations and Business Resilience

    A suspected major incident affects a core banking system. The service desk's most appropriate immediate action is to:

    1. escalate to senior management and technical teams in line with the major incident procedure Correct answer.
    2. log the incident and route it to the next scheduled problem review
    3. perform a full root cause analysis before involving other teams
    4. wait for user confirmation of the impact before escalating

    Explanation

    Declaring and escalating a major incident quickly mobilizes technical and management resources and triggers crisis communication. Diagnosis and root cause analysis follow once the response is under way.

  158. Question 158Information Systems Operations and Business Resilience

    A standby generator supporting a data center should be tested periodically under load primarily because:

    1. regulations require monthly generator testing in all data centers
    2. fuel consumption must be measured to budget operating costs
    3. the transfer switch must be operated manually during an outage
    4. the generator may start but fail to carry the load during a real outage Correct answer.

    Explanation

    A generator that starts but cannot sustain the load, for example because of fuel delivery or cooling problems, fails at the moment it is needed. Load testing verifies the entire power path under realistic conditions.

  159. Question 159Information Systems Operations and Business Resilience

    A database must be recoverable to any point in time up to the last committed transaction. The backup strategy must include:

    1. nightly incremental backups with monthly archive copies
    2. weekly full backups plus nightly differential backups
    3. periodic full backups plus continuous archiving of transaction logs Correct answer.
    4. weekly exports of the database to an offsite tape vault

    Explanation

    Recovery to an arbitrary point in time requires a full backup plus an uninterrupted sequence of archived transaction logs that can be replayed. Without log archiving, recovery can only reach the point of the last backup.

  160. Question 160Information Systems Operations and Business Resilience

    A service desk is measured primarily on the percentage of incidents resolved at first contact. The most likely unintended consequence is that analysts will:

    1. spend more time documenting the root cause of each incident
    2. escalate too many incidents to second-level support
    3. close incidents prematurely or avoid logging difficult ones Correct answer.
    4. reduce the number of incidents handled per analyst per day

    Explanation

    A first-contact resolution target rewards speed, so analysts may close tickets before the issue is truly resolved or leave complex calls unlogged. Balanced measures such as reopen rates, customer satisfaction and backlog size are needed to counter this behavior.

  161. Question 161Protection of Information Assets

    Which access control model assigns access based on security labels such as 'secret' or 'top secret' matched against a user's formal clearance?

    1. Role-based access control
    2. Discretionary access control
    3. Mandatory access control Correct answer.
    4. Rule-based access control

    Explanation

    In mandatory access control the system, not the user, assigns classification labels to objects and clearances to subjects, and access is granted only when the clearance dominates the label. Users cannot pass access to others or change the labels.

  162. Question 162Protection of Information Assets

    Which property of a cryptographic hash function makes it suitable for detecting unauthorized changes to a file?

    1. Variable-length output
    2. Reversibility of the digest
    3. Key escrow capability
    4. Collision resistance Correct answer.

    Explanation

    Hashing supports integrity checking because the digest is deterministic and it is computationally infeasible to find two different inputs producing the same digest. Any modification to the file therefore produces a different digest that no longer matches the stored value.

  163. Question 163Protection of Information Assets

    A web server that must be reachable from the internet should be placed in which network zone?

    1. The backup network segment
    2. The corporate intranet
    3. A screened subnet (DMZ) Correct answer.
    4. The remote access VPN pool

    Explanation

    Public-facing servers belong in a screened subnet, also called a DMZ, which sits between the internet and the internal network and is bounded by filtering devices. If the host is compromised, the internal network remains separated from it by an additional control layer.

  164. Question 164Protection of Information Assets

    An unauthorized person walks through a secured door immediately behind a badge holder without presenting credentials. This is best described as:

    1. War driving
    2. Phishing
    3. Shoulder surfing
    4. Tailgating Correct answer.

    Explanation

    Tailgating is a physical intrusion technique in which an unauthorized person follows an authorized person through an access-controlled entry point. Controls such as mantraps, turnstiles and security awareness training are used to counter it.

  165. Question 165Protection of Information Assets

    Which wireless security protocol was deprecated because its static encryption keys could be recovered by an attacker who observed enough traffic?

    1. WEP Correct answer.
    2. WPA3
    3. IPSec
    4. WPA2-Enterprise

    Explanation

    WEP uses a static key combined with short initialization vectors, which allows an eavesdropper to recover the key after collecting sufficient traffic. WPA2 and WPA3 replaced it with per-session key derivation that resists this attack.

  166. Question 166Protection of Information Assets

    Which of the following is a detective control?

    1. Mantrap at the data center door
    2. Intrusion detection system Correct answer.
    3. Security guard at the entrance
    4. Encryption of data at rest

    Explanation

    Detective controls identify and record events after or while they occur, and an intrusion detection system raises alerts on suspicious activity. Preventive controls, by contrast, stop an event from happening at all.

  167. Question 167Protection of Information Assets

    Which backup type copies only the files changed since the most recent backup of any kind and clears the archive bit?

    1. Incremental backup Correct answer.
    2. Snapshot backup
    3. Differential backup
    4. Full backup

    Explanation

    An incremental backup captures only data changed since the last full or incremental backup and resets the archive attribute, so each successive incremental is small but restoration requires the full set plus every incremental in sequence.

  168. Question 168Protection of Information Assets

    Which type of malware self-replicates across networks without requiring a host file?

    1. Rootkit
    2. Worm Correct answer.
    3. Trojan horse
    4. Logic bomb

    Explanation

    A worm is a standalone program that propagates itself across networks by exploiting services or user action, without needing to attach to a host executable. This self-propagation is what distinguishes it from other malware categories.

  169. Question 169Protection of Information Assets

    An intrusion detection system that flags traffic deviating from a learned baseline of normal activity is using which detection method?

    1. Anomaly-based detection Correct answer.
    2. Signature-based detection
    3. Static packet filtering
    4. Stateful packet inspection

    Explanation

    Anomaly-based detection builds a model of expected behavior and alerts when observed activity departs from it, which allows detection of previously unseen attacks. Its trade-off is a higher rate of false positives while the baseline matures.

  170. Question 170Protection of Information Assets

    Which firewall type tracks the state of active connections and permits return traffic for sessions initiated from inside the network?

    1. Application proxy gateway
    2. Web content filter
    3. Stateful firewall Correct answer.
    4. Packet-filtering router

    Explanation

    A stateful firewall maintains a session table so that replies to internally initiated connections are allowed without a permanent inbound rule. This reduces the number of static rules needed while keeping unsolicited inbound traffic blocked.

  171. Question 171Protection of Information Assets

    Which IPSec mode encrypts the entire original packet, including its IP header, and encapsulates it inside a new packet?

    1. Authentication header mode
    2. Transport mode
    3. Split tunneling mode
    4. Tunnel mode Correct answer.

    Explanation

    Tunnel mode wraps the whole original datagram in a new IP packet, hiding the internal addressing and making it suitable for gateway-to-gateway VPNs. Transport mode protects only the payload and leaves the original IP header visible.

  172. Question 172Protection of Information Assets

    Which component of a public key infrastructure digitally signs a certificate to bind a public key to a verified identity?

    1. The certification authority Correct answer.
    2. The registration authority
    3. The certificate revocation list
    4. The relying party

    Explanation

    The certification authority signs certificates with its own private key, allowing anyone who trusts that authority to validate the binding between a public key and an identity. The registration authority may verify identity but does not issue the signed certificate.

  173. Question 173Protection of Information Assets

    What is the most important control for correlating log entries from many servers during a security investigation?

    1. Encrypting each log file with a separate key
    2. Letting administrators review their own logs
    3. Clock synchronization across all servers Correct answer.
    4. Storing each log locally on its own server

    Explanation

    Event correlation depends on consistent timestamps, so all systems should synchronize to a common trusted time source. Without synchronized clocks, the sequence of events across hosts cannot be reconstructed reliably.

  174. Question 174Protection of Information Assets

    An organization wants to reduce broadcast traffic and limit lateral movement between departments that share the same physical switch. Which control best achieves this?

    1. Network address translation
    2. A flat network protected by host-based firewalls
    3. Server load balancing
    4. Virtual LAN segmentation Correct answer.

    Explanation

    Virtual LANs create separate broadcast domains on shared switching hardware and, when combined with inter-VLAN filtering, restrict traffic between groups. This contains reconnaissance and limits how far an intruder can move from an initial foothold.

  175. Question 175Protection of Information Assets

    Which control is designed to stop employees from emailing customer account numbers to external recipients?

    1. Data loss prevention software Correct answer.
    2. A spam filter on the mail gateway
    3. A host-based antivirus agent
    4. A file integrity monitor

    Explanation

    Data loss prevention tools inspect content and context, such as pattern-matched account numbers leaving through email, and can block or quarantine the transmission. This content-aware inspection is what distinguishes DLP from perimeter mail hygiene.

  176. Question 176Protection of Information Assets

    In a structured incident response process, which phase immediately follows containment?

    1. Lessons learned
    2. Recovery
    3. Detection and analysis
    4. Eradication Correct answer.

    Explanation

    The typical sequence is preparation, detection and analysis, containment, eradication, recovery and post-incident review. Once the incident is contained, the root cause such as malware or a compromised account must be removed before systems return to service.

  177. Question 177Protection of Information Assets

    A sender wants to give a recipient both confidentiality and assurance that the message originated from the sender. Which combination achieves this?

    1. Encrypt with the recipient's public key, then encrypt with the sender's public key
    2. Encrypt with the sender's private key, then encrypt with the recipient's public key Correct answer.
    3. Encrypt with a single shared secret key distributed by email
    4. Encrypt with the recipient's private key, then encrypt with the sender's public key

    Explanation

    Applying the sender's private key provides origin authentication and integrity, and applying the recipient's public key afterwards provides confidentiality. Only the matching keys, held by the recipient and derived from the sender's public key, can reverse the process.

  178. Question 178Protection of Information Assets

    What is the primary purpose of deploying a honeypot?

    1. Providing failover for critical production servers
    2. Diverting attackers and collecting intelligence Correct answer.
    3. Accelerating encryption of sensitive databases
    4. Blocking malicious traffic at the perimeter

    Explanation

    A honeypot is a decoy system with no legitimate production role, so any interaction with it is suspicious and can be studied. It draws attention away from real assets and yields intelligence on attacker tools and techniques.

  179. Question 179Protection of Information Assets

    Which measure best mitigates the risk of credentials being captured by a network protocol analyzer on the internal LAN?

    1. Network address translation at the gateway
    2. Encryption of the session with TLS Correct answer.
    3. MAC address filtering on switches
    4. Assignment of static IP addresses

    Explanation

    Encrypting the session means captured packets expose only ciphertext, so credentials and session data cannot be read from a packet capture. Address-based controls do not protect the payload once traffic is observed.

  180. Question 180Protection of Information Assets

    Which environmental control is most important for preventing electrostatic discharge damage to server components in a data center?

    1. Maintaining the room at 18 degrees Celsius
    2. Installing vibration dampers beneath the racks
    3. Keeping the room under positive air pressure
    4. Holding relative humidity between 40 and 60 percent Correct answer.

    Explanation

    Electrostatic discharge risk rises when the air is very dry, so relative humidity is maintained in a mid-range to allow static charges to dissipate. Temperature and airflow controls address heat removal and contamination rather than static buildup.

  181. Question 181Protection of Information Assets

    Which risk increases most significantly when an enterprise implements single sign-on for its internal applications?

    1. Encryption keys must be distributed to all users
    2. Password reset costs rise sharply
    3. Users must memorize a larger number of passwords
    4. Compromise of one credential grants broad access Correct answer.

    Explanation

    Single sign-on concentrates trust in one authentication event, so a stolen credential or token can reach every federated application. Strong primary authentication, short session lifetimes and monitoring of the identity provider are the compensating controls.

  182. Question 182Protection of Information Assets

    Which function does a Trusted Platform Module primarily perform?

    1. Filtering malicious traffic before it reaches the operating system
    2. Storing keys and measuring platform integrity Correct answer.
    3. Routing packets between VLANs at wire speed
    4. Backing up encryption keys to removable media

    Explanation

    A TPM is a tamper-resistant chip that seals cryptographic keys to a specific platform and stores measurements of boot components, which enables integrity attestation and disk encryption key protection. Because keys are bound to the platform, they are not exported for use elsewhere.

  183. Question 183Protection of Information Assets

    An organization with high staff turnover wants access rights to be assigned automatically according to each employee's current job function, with changes taking effect when the employee moves roles. Which approach best meets this requirement?

    1. Discretionary access control administered by data owners
    2. Rule-based access control implemented as firewall access lists
    3. Role-based access control linked to the HR directory Correct answer.
    4. Mandatory access control using clearance labels

    Explanation

    Role-based access control assigns permissions to roles rather than individuals, so entitlements can be recalculated automatically when the HR system records a role change. This keeps access aligned with current duties and reduces the accumulation of stale rights.

  184. Question 184Protection of Information Assets

    Which configuration change most effectively prevents VLAN hopping through double-tagged frames on a trunk link?

    1. Moving the native VLAN to an unused ID Correct answer.
    2. Enabling port security with sticky MAC addresses
    3. Disabling DHCP snooping on trunk ports
    4. Enabling gratuitous ARP protection

    Explanation

    Double-tagging attacks exploit the fact that a trunk port strips the outermost tag and forwards the frame on its native VLAN, so a frame arrives on a victim VLAN with the second tag intact. Changing the native VLAN to an unused identifier means the stripped frame lands nowhere useful.

  185. Question 185Protection of Information Assets

    Why is simple overwriting less reliable for sanitizing solid-state drives than for magnetic hard disks?

    1. Solid-state drives retain data only in volatile memory
    2. Solid-state drives cannot use full-disk encryption
    3. Solid-state drives do not use a file system
    4. Wear leveling may leave copies of data in spare blocks Correct answer.

    Explanation

    Flash controllers remap logical addresses across physical blocks to spread wear, so an overwrite may not touch every physical location that holds a copy of the original data. Cryptographic erase or physical destruction is therefore preferred for solid-state media.

  186. Question 186Protection of Information Assets

    What is the primary reason an organization classifies its information assets?

    1. To reduce the total volume of data stored on file servers
    2. To remove the need for periodic access reviews
    3. To define the protection and handling each asset needs Correct answer.
    4. To guarantee that backups finish within the recovery window

    Explanation

    Classification assigns a sensitivity level that determines how an asset must be labeled, accessed, transmitted, retained, and destroyed. It aligns the cost of controls with the value of the asset. It does not reduce stored data volume or replace access reviews and backup testing.

  187. Question 187Protection of Information Assets

    Which control most directly limits the effectiveness of repeated online password guessing against a user account?

    1. Storing password hashes with a per-user salt
    2. Encrypting the password database with a strong algorithm
    3. Requiring passwords to be changed every 90 days
    4. Account lockout after repeated failed attempts Correct answer.

    Explanation

    Online guessing succeeds through many authentication attempts, so lockout or throttling after a threshold interrupts the attack. Hashing, salting, and encryption protect stored credentials but do not stop an attacker from submitting guesses to a live service.

  188. Question 188Protection of Information Assets

    Which physical control is designed to prevent an unauthorized person from following an employee through a secured entrance?

    1. A mantrap with interlocking doors Correct answer.
    2. Security awareness posters in the entryway
    3. CCTV coverage of the lobby
    4. A visitor log maintained at reception

    Explanation

    A mantrap allows one person through at a time and requires the first door to close before the second opens, which physically blocks tailgating. Logs, cameras, and awareness material support detection or deterrence but do not stop someone from slipping through a door.

  189. Question 189Protection of Information Assets

    Why must antivirus signature files be updated regularly?

    1. To comply with backup rotation schedules
    2. To detect newly identified malware strains Correct answer.
    3. To improve network throughput during scans
    4. To reduce the size of the scanning engine

    Explanation

    Signature-based detection compares files and traffic against a database of known malicious patterns. New malware families require new signatures, so an outdated database misses recent threats. Updates do not change scanning engine size, backup schedules, or network throughput.

  190. Question 190Protection of Information Assets

    Two biometric products are evaluated: Product A has a crossover error rate of 1 in 10,000, while Product B has 1 in 1,000. Which conclusion is most appropriate?

    1. Product B is more accurate because a higher crossover rate means stricter matching
    2. Product A should be rejected because low error rates slow down enrollment
    3. The products are equivalent because the crossover error rate does not affect accuracy
    4. Product A is more accurate, since a lower crossover error rate reflects a better error balance Correct answer.

    Explanation

    The crossover error rate is the point at which false acceptance and false rejection rates are equal, so a lower value indicates a more accurate biometric system. It summarizes the trade-off between the two error types. Enrollment speed is a separate usability consideration.

  191. Question 191Protection of Information Assets

    An organization encrypts its database backups. Where should the encryption keys be stored to best protect the backups?

    1. In the database configuration file for automatic use
    2. In the same backup set so restoration is always possible
    3. In a spreadsheet held by the backup administrator
    4. In a separate key management system Correct answer.

    Explanation

    Keys should be separated from the data they protect and held in a controlled key management system or hardware security module. If a backup tape or set is lost, the keys are not exposed with it. Storing keys alongside the data defeats the purpose of encryption.

  192. Question 192Protection of Information Assets

    Which feature of WPA2-Enterprise provides per-user authentication on a wireless network?

    1. SSID hiding on the access point
    2. 802.1X authentication via RADIUS Correct answer.
    3. MAC address filtering at the access point
    4. A pre-shared key distributed to all users

    Explanation

    WPA2-Enterprise uses 802.1X with an EAP method and a RADIUS server so each user authenticates with individual credentials. This avoids the shared-secret weakness of a pre-shared key and supports centralized revocation. MAC filtering and SSID hiding are weak obscurity measures.

  193. Question 193Protection of Information Assets

    A critical server runs an operating system that the vendor no longer supports. Which compensating control best reduces exploitation risk while replacement is planned?

    1. Removing the server from the backup schedule
    2. Segmenting it and monitoring its traffic closely Correct answer.
    3. Increasing the frequency of administrator password changes
    4. Disabling antivirus scanning to improve performance

    Explanation

    An unsupported system cannot receive security patches, so restricting its network reach and watching for exploitation limits the blast radius. Segmentation and monitoring are recognized compensating controls until the system can be replaced. Neither backups nor password changes address unpatched vulnerabilities.

  194. Question 194Protection of Information Assets

    Which practice most effectively prevents SQL injection in a web application?

    1. Restricting database access to the application account
    2. Hiding database error messages from users
    3. Escaping single quotes in the client-side form
    4. Using parameterized queries for all database access Correct answer.

    Explanation

    Parameterized queries keep SQL code separate from user-supplied values, so input cannot alter statement structure. Input escaping on the client can be bypassed, and error suppression only reduces information leakage. Limiting the application's database privileges limits impact but does not prevent injection.

  195. Question 195Protection of Information Assets

    Under the shared responsibility model for infrastructure as a service, which responsibility remains with the customer?

    1. Maintaining the hypervisor firmware
    2. Securing the underlying network fabric
    3. Classifying data and controlling access Correct answer.
    4. Physical security of the data center

    Explanation

    In IaaS the provider secures facilities, hardware, and the virtualization layer, while the customer remains accountable for its data, identities, and access permissions. Data classification and entitlement management are always customer responsibilities because only the customer understands the data.

  196. Question 196Protection of Information Assets

    Which action most directly reduces the risk of a compromised virtual machine attacking other VMs on the same host?

    1. Increasing the memory allocated to each VM
    2. Assigning static IP addresses to all VMs
    3. Segmenting VMs and filtering traffic between them Correct answer.
    4. Taking more frequent VM snapshots

    Explanation

    Placing VMs on separate virtual networks and enforcing filtering between them limits lateral movement, even when they share a hypervisor. Snapshots, addressing, and memory allocation do not restrict traffic between guests.

  197. Question 197Protection of Information Assets

    What is the primary objective of periodically recertifying user access rights?

    1. To measure the efficiency of the identity management team
    2. To reduce the number of help desk tickets
    3. To confirm rights are still justified and remove excess Correct answer.
    4. To satisfy software licensing requirements

    Explanation

    Recertification requires managers or system owners to confirm that each entitlement is still needed for the person's current duties. It removes accumulated rights from transfers and role changes, supporting least privilege. It is not a performance, service desk, or licensing exercise.

  198. Question 198Protection of Information Assets

    During incident response on a running server, which evidence should be collected first?

    1. Backup tapes stored offsite
    2. Files on the hard disk
    3. Volatile memory and active connections Correct answer.
    4. Printouts of system documentation

    Explanation

    Evidence collection follows the order of volatility, starting with data that disappears when the system is powered down or the connection closes. RAM contents, running processes, and active network sessions are therefore captured before disk or archival media.

  199. Question 199Protection of Information Assets

    A web service enables cipher suites that support perfect forward secrecy. Which risk does this reduce?

    1. An attacker forging a server certificate without the certification authority's private key
    2. An attacker guessing user passwords through offline brute force
    3. Later decryption of recorded sessions after the private key is compromised Correct answer.
    4. An attacker replaying captured packets within the session window

    Explanation

    Perfect forward secrecy derives a unique ephemeral key for each session, so compromise of the server's long-term private key does not reveal previously recorded traffic. It does not affect certificate forgery, replay protection, or password strength.

  200. Question 200Protection of Information Assets

    An organization wants only authenticated, compliant devices to connect to switch ports in its offices. Which technology best meets this requirement?

    1. 802.1X with endpoint posture checks Correct answer.
    2. DHCP snooping on the core switch
    3. Static ARP entries on user workstations
    4. Port mirroring on all access switches

    Explanation

    802.1X authenticates the user or device before granting port access, and posture assessment can verify patch level and security agent status before allowing the connection. Port mirroring, DHCP snooping, and static ARP entries serve monitoring or spoofing defenses, not admission control.

CISA flashcards

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Audit risk model
Audit risk equals inherent risk multiplied by control risk multiplied by detection risk; detection risk is the only element the auditor controls, and it decreases as substantive testing increases.
Compliance testing purpose
Compliance testing determines whether a control exists and operates as designed throughout the period; substantive testing instead verifies the completeness, accuracy and validity of transactions or balances directly.
Audit evidence sufficiency
Sufficiency is the quantity of evidence needed to support a conclusion; appropriateness is its relevance and reliability. Evidence obtained directly by the auditor is more reliable than management representations.
Audit charter
A board or audit-committee-approved document defining the internal audit function's authority, scope, responsibilities and reporting lines, granting access to records and personnel, and underpinning auditor independence.
Integrated test facility
A computer-assisted audit technique that inserts a fictitious entity into a live production system so test transactions are processed alongside real ones and results are compared with expected output.
Audit finding components
A finding states the criteria (the standard), condition (what exists), cause, effect or risk, and a recommendation; management then provides a response with an owner and target remediation date.
Governance versus management
Governance evaluates, directs and monitors IT on behalf of stakeholders through the board; management plans, builds, runs and monitors IT activities within the direction that governance sets.
IT steering committee
A group of senior business and IT executives that prioritizes IT investments, allocates resources, resolves cross-functional issues and monitors project, service and risk performance.
KGI versus KPI
Key goal indicators measure whether intended business outcomes were achieved after the fact; key performance indicators measure how well an enabling process is currently performing.
IT balanced scorecard
A performance framework with financial, customer, internal process, and learning and growth perspectives, adapted for IT to show IT's contribution to business value and user satisfaction.
Data owner and custodian
The data owner, usually a business manager, classifies information and authorizes access; the data custodian, usually in IT, implements and administers the technical safeguards that protect it.
User acceptance testing
Testing performed and formally signed off by business users to confirm the system meets documented requirements; the auditor reviews coverage, defect closure and sign-off evidence rather than executing tests.
Cost performance index
Earned value divided by actual cost. A CPI below 1 means the project is over budget; a schedule performance index below 1 means the project is behind schedule.
Critical path
The longest sequence of dependent project activities, having zero float; any delay to an activity on the critical path delays the entire project completion date.
Parallel changeover
Old and new systems run simultaneously for a period and outputs are reconciled. It offers the highest confidence at the highest cost and suits high-risk conversions.
Developer production access
Developers should not be able to promote their own code into production; a separate release or operations function moves only tested, independently approved changes into the live environment.
Post-implementation review
A structured assessment after the system has stabilized, confirming that project objectives and expected benefits were achieved and identifying remaining issues and lessons learned.
Recovery time and point objectives
RTO is the maximum acceptable restoration time; RPO is the maximum acceptable data loss measured in time before the outage. RTO must fall within the maximum tolerable downtime.
Business impact analysis
The first continuity planning step: it identifies critical processes, dependencies and the escalating impact of an outage over time, producing recovery priorities, RTOs and RPOs.
Differential backup
Copies all files changed since the last full backup and does not reset the archive bit; restoration needs the last full backup plus only the most recent differential.
Incremental backup
Copies only data changed since the most recent backup of any type and resets the archive bit; restoration requires the last full backup plus every incremental taken since then, in order.
Hot site
A fully equipped alternate processing facility with current mirrored data and ready hardware, providing near-zero recovery time at the highest ongoing subscription cost.
Full interruption test
A disaster recovery test that shuts down the primary site and processes work at the alternate site; it is the most realistic and riskiest test and follows simpler tests.
Incident versus problem management
Incident management restores normal service as quickly as possible, often through a workaround; problem management then investigates root cause to prevent recurrence.
Crossover error rate
The point at which a biometric system's false acceptance rate equals its false rejection rate; a lower crossover error rate indicates a more accurate and better-balanced device.
Digital signature
A message hash encrypted with the sender's private key. It provides integrity, origin authentication and nonrepudiation, but because the message stays readable it gives no confidentiality.
Mandatory access control
A model in which the system enforces access based on security labels on objects and clearances held by subjects; users cannot change or delegate those permissions themselves.
Order of volatility
Evidence collection sequence from most to least volatile: processor registers and cache, RAM, swap and temporary files, disk storage, logs, then backups and archival media.
Chain of custody
An unbroken documented record of who collected, handled and analysed evidence, and when and why, required to demonstrate integrity and make evidence admissible in proceedings.
IDS versus IPS
An intrusion detection system monitors traffic passively and raises alerts; an intrusion prevention system is deployed inline and can automatically block or drop malicious traffic in real time.
Asymmetric encryption use
A public key encrypts and the matching private key decrypts, solving key distribution; because it is slow, it typically wraps a symmetric session key in hybrid encryption.
Data remanence
Residual data left on media after deletion or formatting; only clearing, purging such as degaussing, or physical destruction reliably removes it before disposal or reuse.

CISA study guide

Information Systems Auditing Process

Framing the engagement

An IS audit begins with the audit charter, which grants authority, defines scope and reporting lines, and must originate from the board or audit committee - never from IT management. Independence and objectivity underpin every answer: the auditor may recommend control improvements but must never design or operate a control, because that impairs objectivity. Planning is risk-based: build an audit universe, rank auditable entities by risk, then derive objectives, scope, criteria and an audit program.

Evidence and testing

Use the audit risk model: audit risk = inherent risk × control risk × detection risk. The auditor assesses inherent and control risk; only detection risk is under the auditor's direct control, and it moves inversely with the extent of substantive testing. Evidence reliability runs: auditor's own observation/inspection → external confirmations → independent third-party documents → internal documents → oral representations. Always corroborate management's verbal claims. Separate compliance testing (are controls operating?) from substantive testing (do balances and transactions hold?). Sampling risk falls as sample size grows; non-sampling risk - flawed design or judgment - is never reduced by adding items.

Reporting

Findings follow criteria–condition–cause–effect–recommendation. Present them at the exit meeting to confirm factual accuracy, not to negotiate the opinion.

Traps

Questions swap detection risk (auditor-controlled) with inherent/control risk; ask the auditor to “fix” a finding; or claim that lower reliance on controls means less testing, when it means more.

Rule of thumb

If an answer choice has the auditor design or implement the control, it is wrong.

Governance and Management of IT

Governance versus management

IT governance is the board's and executives' responsibility: setting direction through leadership, organizational structure and processes so that IT sustains and extends business strategy. Management executes that direction. COBIT is the reference framework; when the question's actor is “the board,” prefer governance-level (evaluate, direct, monitor) answers over operational ones.

Key mechanisms include the board audit or risk committee, an IT strategy/steering committee, the CIO's reporting line, and the IT balanced scorecard. Respect the document hierarchy: a policy states what and why (mandatory, management-approved), a standard specifies mandatory requirements, a procedure gives step-by-step instructions.

Roles and segregation

Data owner - business-side, accountable, classifies data and authorizes access. Data custodian - implements and operates the controls. Data user - uses data per policy. Information security administrators run the technical mechanisms. Segregation of duties separates authorization, custody, recording and reconciliation; in small organizations, compensating controls (supervisory review, independent log review) are the correct answer.

Risk and resources

Enterprise risk management links IT risk to business risk; the board sets risk appetite. Resource management covers sourcing, staff competency, and third-party management: due diligence, right-to-audit clauses, SLAs and a defined exit strategy.

Traps

Board sets policy, management implements. The steering committee prioritizes projects and resolves conflicts - it does not do technical design. Independence traps: the CIO should not unilaterally appraise the security function.

Rule of thumb

When asked who should act, choose the highest-level body competent for that decision.

Information Systems Acquisition, Development and Implementation

Life cycle and audit points

Typical SDLC phases: feasibility/business case, requirements definition, design, development or configuration, testing, implementation and post-implementation review. Auditor focus: an approved business case with measurable benefits, meaningful user involvement, documented requirements sign-off, segregation between developers and the production environment, and test data that is synthetic or masked rather than live production data.

Methods

Waterfall suits stable requirements and heavy documentation; agile/iterative delivers in increments with continuous user feedback but lighter documentation - the auditor confirms that product-level controls (version control, review, testing) still exist. Also recognize prototyping, RAD, and commercial off-the-shelf versus custom build. Control objectives apply regardless of methodology.

Testing

Unit (developer), integration, system, user acceptance (business users), regression, and parallel/pilot/phased implementation. UAT is the key acceptance gate and auditors examine its evidence. Data conversion demands record counts, control totals, reconciliation and a rollback plan.

Project and change control

Project governance: sponsor, charter, WBS, baselines, milestones, risk register. Red flags include scope creep, missing baselines and no user sign-off. Change management flow: request → impact assessment → authorization → testing → approval by someone independent of the developer → implementation with back-out plan → post-implementation review. Emergency changes are reviewed retrospectively.

Post-implementation

The PIR compares actual costs and benefits against the business case once the system has stabilized; it is the evidence of benefits realization.

Traps

The developer approving their own change; IT performing UAT; and the auditor participating in system design - all wrong.

Rule of thumb

Whoever builds it should not be the only one testing it, and should never promote it to production.

Information Systems Operations and Business Resilience

Service management

Know the service management distinctions: incident management restores service quickly; problem management finds and eliminates root cause; change, release and configuration management (with a CMDB) control the environment. Service level agreements are with customers, operational level agreements are internal, underpinning contracts are with vendors. Incident priority = impact × urgency. Capacity and performance are monitored against agreed service targets.

Operations controls

Job scheduling must be authorized and separated from operations duties. Console and operator logs are reviewed independently. Backups: full, incremental (since last backup of any type) and differential (since last full); only a successful restore test proves a backup works. Media rotate offsite and are retained per legal and regulatory requirements. Source code lives in a controlled library with versioning and restricted production access.

Resilience

A business impact analysis identifies critical processes, dependencies, maximum tolerable downtime, RTO (how long until restoration) and RPO (how much data loss is tolerable). Strategies include hot, warm and cold sites, reciprocal agreements, mobile sites and cloud failover. DR testing escalates in rigor: checklist → structured walk-through/tabletop → simulation → parallel test → full interruption. Auditors prefer parallel or full interruption but accept the most rigorous test management can sustain.

Traps

Confusing RTO with RPO; treating incident management as business continuity; believing a hot site removes the need for a BIA; assuming an untested plan provides assurance.

Rule of thumb

Sequence is always BIA → recovery strategy → plan → test → update.

Protection of Information Assets

Security management

Security is a business issue owned by senior management; the CISO advises and coordinates. A classification scheme (owner-assigned) drives handling rules. Core principles: least privilege, need-to-know, defense in depth, and balance - more controls are not automatically better if they break usability.

Access control

Sequence: identification → authentication → authorization → accountability via audit trails. The three factors are something you know, have, or are; true two-factor authentication combines different types. Biometrics: false rejection rate (Type I) rejects a valid user; false acceptance rate (Type II) admits an imposter; the crossover error rate where they meet measures system accuracy - lower is better. MAC uses system-enforced labels and clearances; DAC lets the owner grant access; RBAC ties rights to roles and simplifies transfers. Single sign-on improves usability but concentrates risk.

Cryptography

Symmetric encryption is fast but has key-distribution problems; asymmetric encryption solves key exchange. Hashing is one-way and provides integrity without a key. A digital signature (hash encrypted with the sender's private key) gives integrity, authentication and nonrepudiation - but not confidentiality. PKI relies on a certificate authority and registration authority; a digital envelope combines asymmetric and symmetric for efficiency.

Network and physical

Firewalls, a DMZ for public-facing systems, IDS (detects, passive) versus IPS (blocks), VPNs, segmentation, hardened wireless (current WPA standards, rogue access point detection), malware controls, DLP and security awareness training. Physical: layered perimeter, access logs, environmental controls.

Traps

Claims that digital signatures provide confidentiality, or that encryption delivers availability.

Rule of thumb

If asked what proves a message came from a given sender and was unaltered, the answer is a digital signature.

CISA cheat sheet

Quick reference

Information Systems Auditing Process

  • Audit risk model: Audit risk = inherent risk x control risk x detection risk. Detection risk is the only component the auditor controls, and it moves inversely to the extent of substantive testing.

  • Evidence is judged on sufficiency (quantity) and appropriateness (relevance plus reliability). Evidence obtained directly by the auditor outranks management representations and verbal third-party statements.

  • Compliance testing asks whether a control exists and operates as designed; substantive testing asks whether transactions or balances are complete and accurate. Controls are tested first, then the amounts they should protect.

  • Attribute sampling suits control deviation rates (upper deviation limit at a stated confidence); variable sampling suits monetary amounts; stop-or-go and discovery sampling fit a single yes/no question such as whether any exception exists.

  • CAAT families: generalized audit software for extraction and comparison, test data with known good and bad inputs, integrated test facility using a dummy entity in a live system, parallel simulation, and snapshot.

  • The audit charter is approved by the board or audit committee and defines authority, scope, responsibilities and reporting lines; reporting to the audit committee protects independence.

  • Independence rule: the IS auditor may review, observe and advise on control design but must not design, implement or operate the controls being audited.

  • A finding contains five elements: criteria, condition, cause, effect (risk) and recommendation, followed by a management response with an owner and a remediation date.

  • SOC 1 reports address controls relevant to financial reporting, SOC 2 addresses trust services criteria, SOC 3 is a general-use seal; Type 1 is as of a point in time, Type 2 covers a period.

Quick reference

Governance and Management of Information Technology

  • Governance versus management: governance evaluates, directs and monitors (ISO/IEC 38500); management plans, builds, runs and monitors within that direction.

  • COBIT principles include providing stakeholder value, a holistic approach, a dynamic governance system, governance distinct from management, tailoring to enterprise needs, and end-to-end coverage.

  • The board or audit committee is accountable for IT governance and IT risk; the IT steering committee prioritizes investments, allocates resources and resolves cross-functional conflicts.

  • Balanced scorecard perspectives are financial, customer, internal business process, and learning and growth; KGIs measure whether outcomes were achieved, KPIs measure process performance.

  • Document hierarchy: policy states mandatory management intent, standards set mandatory specific requirements, procedures give mandatory step-by-step instructions, and guidelines are discretionary recommendations.

  • Effectiveness means objectives were attained; efficiency means the resources consumed to attain them. Performance reporting addresses both.

  • A business case contains costs, benefits, risks, ROI and TCO; it is approved before funding and its benefits are verified at the post-implementation review.

  • Segregation of duties and least privilege limit fraud opportunity; mandatory vacations and job rotation expose concealed or collusive activity.

  • Framework mapping: TOGAF (architecture development method) and Zachman (architecture taxonomy) for enterprise architecture, ITIL for service management, COBIT for IT governance.

Quick reference

Information Systems Acquisition, Development and Implementation

  • SDLC sequence with formal sign-off gates: feasibility and business case, requirements, design, build or acquire, test, implement, post-implementation review.

  • Test order: unit (developer) then integration, system, user acceptance (business) and regression; volume and stress tests probe capacity limits rather than functional correctness.

  • Project metrics: CV = EV - AC, SV = EV - PV, CPI = EV/AC, SPI = EV/PV. A value below 1 signals budget overrun (CPI) or schedule slippage (SPI); the critical path has zero float.

  • Change management flow: request, impact analysis, authorization, testing in a non-production environment, user sign-off, controlled migration. Developers must not promote their own code.

  • Input controls include field/format, size, range or limit, validity (table lookup), reasonableness, dependency, check digit and batch control totals.

  • Processing controls include run-to-run totals, control totals, record and file counts, reconciliation, and reasonableness checks on computed values.

  • Output controls cover distribution lists, spool and report protection, reconciliation of output to control totals, and retention.

  • Cutover options: direct or big bang (cheapest, riskiest), parallel (safest, costliest), pilot (single site or unit), phased (module by module).

  • Application controls act on individual transactions; general controls such as change management, logical access and operations provide the environment on which application controls depend.

Quick reference

Information Systems Operations and Business Resilience

  • The business impact analysis precedes recovery strategy: it identifies critical processes, dependencies and the escalating impact of an outage over time, producing priorities, RTOs and RPOs.

  • RTO must not exceed the maximum tolerable downtime; RPO sets backup and replication frequency; availability is approximated by MTBF / (MTBF + MTTR).

  • Backup types: full (copies all, resets the archive bit), incremental (changes since the last backup of any type, resets the bit), differential (changes since the last full, does not reset the bit). Restore chains therefore differ.

  • Grandfather-father-son rotation with offsite vaulting is standard; restoration must be tested periodically, and backup media should be encrypted at rest and in transit.

  • Alternate site ranking: hot (mirrored, minutes, highest cost), warm (partially equipped, hours to days), cold (shell only, weeks); reciprocal agreements and mobile sites are low-cost, low-assurance options.

  • DR test escalation by rigour and risk: checklist review, tabletop or structured walkthrough, simulation, parallel test, full interruption (most realistic, highest risk).

  • ITIL distinctions: incident management restores service quickly, often via a workaround; problem management removes root cause; change management controls alterations; configuration management maintains the CMDB.

  • Data centre controls: raised floor, temperature and humidity control, water detection, clean-agent fire suppression (Halon withdrawn), UPS plus generator, and elimination of single points of failure.

  • Operations monitoring: automated scheduling with job dependencies, review of console and exception reports, capacity and performance monitoring, and disciplined patch and problem management.

Quick reference

Protection of Information Assets

  • Risk = likelihood x impact, arising from threat and vulnerability; treatments are mitigate, transfer, accept and avoid, with acceptance documented by the accountable owner. Controls are preventive, detective or corrective and layered for defense in depth.

  • Access sequence: identification, authentication, authorization, then accountability through logging; least privilege and need-to-know govern what is authorized.

  • Authentication factors are something you know, something you have and something you are; multi-factor requires two or more different categories, so two passwords or a password plus PIN do not qualify.

  • Biometric metrics are FAR, FRR and CER; a lower crossover error rate means better accuracy. High FAR risks unauthorized access, high FRR risks locking out legitimate users.

  • Symmetric algorithms (AES) are fast but suffer key distribution problems; asymmetric algorithms (RSA, ECC) solve distribution but are slow, so hybrid schemes encrypt a symmetric session key asymmetrically.

  • Hashing (SHA-2, SHA-3) provides integrity only; a digital signature is a hash encrypted with the sender's private key and gives integrity, authenticity and nonrepudiation but not confidentiality.

  • Digital certificates bind an identity to a public key and are issued by a certification authority; validity is checked via CRL or OCSP within a PKI that includes registration authority and repository.

  • Network controls: firewall rule sets and ACLs, a DMZ for public-facing services, IDS for detection and alerting, IPS inline for blocking, proxy and NAT to mask internal addressing, TLS/IPSec for data in transit.

  • Forensics: preserve chain of custody and follow order of volatility (registers and cache, RAM, swap and temp files, disk, logs, backups and archival media), using write blockers on storage media.

CISA key terms

IS Audit Charter

A formal, approved document that defines the IS audit function's purpose, authority, responsibility, and reporting lines. It establishes the auditor's right to access records and people and is approved at board or senior management level.

Related: Audit Risk, Risk-Based Auditing
Audit Risk

The risk that an auditor issues an inappropriate conclusion because material errors or control weaknesses went undetected. It combines inherent risk, control risk, and detection risk, and is managed by adjusting the nature, timing, and extent of testing.

Related: Materiality, Audit Sampling, Substantive Testing
Materiality

The threshold at which an error, omission, or control weakness is significant enough to change a decision-maker's judgment. Auditors use it to decide which areas to test and which findings to report.

Related: Audit Risk, Risk-Based Auditing
Risk-Based Auditing

An approach that directs audit resources to the areas of greatest risk by first assessing likelihood and impact of failure. Higher-risk areas receive more attention, greater depth, and more frequent testing.

Related: Audit Risk, IS Audit Charter, Audit Sampling
Compliance Testing

Testing that checks whether prescribed controls exist and operate as designed, for example verifying that approvals were obtained. It answers whether the control is working rather than confirming the accuracy of underlying amounts.

Related: Substantive Testing, Control Self-Assessment
Substantive Testing

Detailed testing of transactions, balances, or records to detect errors or misstatements directly. It is used when controls are weak or to corroborate the results of compliance testing.

Related: Compliance Testing, Audit Sampling
Control Self-Assessment

A facilitated process in which process owners and staff evaluate their own controls and identify risks and gaps. It broadens audit coverage and builds ownership, but auditors should validate the results.

Related: Compliance Testing, Risk-Based Auditing
Audit Sampling

Selecting a subset of a population so the auditor can draw conclusions about the whole. Sampling risk, the chance the sample is unrepresentative, is controlled through sample size and selection method.

Related: Audit Risk, Substantive Testing
IT Governance

The leadership, structures, and processes that ensure IT supports and extends business strategy, delivers value, and manages risk. It determines who decides, how priorities are chosen, and how performance is monitored.

Related: COBIT, IT Steering Committee, IT Risk Appetite
COBIT

An ISACA framework of governance and management objectives for enterprise IT. It links business goals to IT activities through defined processes, supporting maturity assessment, control design, and audit scoping.

Related: IT Governance, IT Portfolio Management
IT Steering Committee

A cross-functional executive group that sets IT priorities, approves major investments and projects, and resolves conflicts between business units. It provides oversight and ensures IT initiatives align with strategy.

Related: IT Governance, IT Portfolio Management, IT Risk Appetite
Enterprise Architecture

A blueprint describing an organization's business, data, application, and technology layers and how they relate. It guides standards and investment so systems remain integrated, scalable, and aligned with strategy.

Related: IT Governance, IT Portfolio Management
IT Portfolio Management

Managing IT investments as a portfolio by evaluating, prioritizing, and monitoring projects and assets against strategic value and risk. It helps terminate low-value work and balance spending across the organization.

Related: IT Steering Committee, Enterprise Architecture
IT Risk Appetite

The amount and type of IT-related risk an organization is willing to accept in pursuit of its objectives, stated qualitatively or quantitatively. It guides decisions on controls, projects, and outsourcing arrangements.

Related: IT Governance, IT Steering Committee
Segregation of Duties

Splitting critical tasks such as authorization, custody, recording, and review among different people so no one person can both cause and conceal an error or fraud. In IT it also separates development, testing, and production.

Related: Role-Based Access Control, Change Control (Application Development)
Systems Development Life Cycle (SDLC)

The structured phases used to build or acquire a system, typically initiation, feasibility, requirements, design, development, testing, implementation, and post-implementation review. Controls at each phase reduce the cost of late defects.

Related: Feasibility Study, User Acceptance Testing, Post-Implementation Review
Feasibility Study

An assessment of whether a proposed system is technically achievable, economically justified, and legally and operationally viable before major spending. It typically compares alternatives and recommends a course of action.

Related: Systems Development Life Cycle (SDLC), Post-Implementation Review
Application Controls

Controls built into a business application covering input, processing, and output, such as edit checks, validation rules, reconciliation, and report distribution. They help ensure transactions are complete, accurate, authorized, and timely.

Related: User Acceptance Testing, Change Control (Application Development)
User Acceptance Testing

Testing performed by business users with realistic data to confirm a system meets requirements and is fit for use before go-live. Formal sign-off transfers ownership from the project team to the business.

Related: Systems Development Life Cycle (SDLC), Application Controls, Post-Implementation Review
Change Control (Application Development)

A formal process for requesting, assessing, approving, testing, and documenting modifications to software or configuration. It prevents unauthorized or untested changes from reaching production and keeps versions traceable.

Related: Segregation of Duties, Application Controls
Critical Path Method

A scheduling technique that identifies the longest sequence of dependent tasks in a project, which determines the shortest possible completion time. Any delay on the critical path delays the entire project.

Related: Systems Development Life Cycle (SDLC), Post-Implementation Review
Post-Implementation Review

A structured review after a system goes live that compares actual costs, benefits, and performance with the original business case, and records lessons learned and unresolved issues.

Related: Feasibility Study, User Acceptance Testing, Systems Development Life Cycle (SDLC)
Business Impact Analysis

A study identifying critical business processes, their dependencies, and the financial and operational impact of disruption over time. Its outputs set recovery priorities and the recovery time and recovery point objectives.

Related: Recovery Time Objective (RTO), Recovery Point Objective (RPO), Business Continuity Plan
Recovery Time Objective (RTO)

The maximum acceptable time a business process or system can be unavailable after a disruption. It drives recovery strategy choices such as site type and redundancy, and must be validated through testing.

Related: Business Impact Analysis, Recovery Point Objective (RPO), Disaster Recovery Plan
Recovery Point Objective (RPO)

The maximum acceptable amount of data loss, measured in time, before a disruption, effectively how far back the last usable copy may be. It drives backup and replication frequency.

Related: Business Impact Analysis, Recovery Time Objective (RTO), Disaster Recovery Plan
Disaster Recovery Plan

Documented procedures to restore critical IT infrastructure, data, and applications at an alternate facility after a major disruption. It supports the business continuity plan and should be tested on a regular schedule.

Related: Business Continuity Plan, Recovery Time Objective (RTO), Business Impact Analysis
Business Continuity Plan

A plan describing how an organization will keep delivering critical business functions during and after a disruption, covering people, facilities, suppliers, and communications. It is broader than, and dependent on, IT recovery planning.

Related: Disaster Recovery Plan, Business Impact Analysis
Incident Management

The process of detecting, logging, classifying, escalating, resolving, and closing service incidents to restore normal operation quickly, while limiting business impact and preserving information for later root-cause analysis.

Related: Problem Management, Business Continuity Plan
Problem Management

The process of finding and eliminating the root causes of recurring incidents through trend analysis, known-error records, and permanent fixes. Unlike incident management, which restores service, it aims to reduce incident volume.

Related: Incident Management
Information Security Management System (ISMS)

The set of policies, procedures, roles, and controls an organization uses to manage information security risk, often built on ISO/IEC 27001. It follows a continual improvement cycle of plan, do, check, and act.

Related: Data Classification, CIA Triad
CIA Triad

The three core goals of information security: confidentiality, meaning only authorized parties access data; integrity, meaning data is accurate and unaltered; and availability, meaning systems and data are accessible when needed.

Related: Information Security Management System (ISMS), Data Classification
Role-Based Access Control

An access model in which permissions are assigned to roles based on job function and users are granted roles. It simplifies administration and supports least privilege and segregation of duties.

Related: Segregation of Duties, Data Classification
Public Key Infrastructure

The policies, software, and certificate authorities that issue, distribute, and revoke digital certificates binding public keys to identities. It underpins encryption, authentication, and digital signatures across untrusted networks.

Related: Digital Signature, CIA Triad
Digital Signature

A cryptographic value created with a sender's private key and verified with the corresponding public key, proving the message's origin and that it was not altered. It provides authenticity, integrity, and nonrepudiation.

Related: Public Key Infrastructure, CIA Triad
Intrusion Detection System

A tool that monitors network or host activity and alerts on suspicious patterns or policy violations. A detection-only control; an intrusion prevention system additionally blocks the traffic it identifies as malicious.

Related: Penetration Testing, CIA Triad
Data Classification

Assigning data to categories such as public, internal, confidential, or restricted according to sensitivity and legal obligations. The category then determines handling, access, retention, and protection requirements.

Related: Role-Based Access Control, Information Security Management System (ISMS)
Penetration Testing

An authorized, simulated attack that exploits vulnerabilities to determine how far an intruder could get and what damage is possible. It complements, but does not replace, routine vulnerability scanning.

Related: Intrusion Detection System, CIA Triad

CISA study plan

8 weeks · About 8 hours per week

Week 1

Information Systems Auditing Process

  • Map the IS audit function's roles, responsibilities, and reporting lines to the audit charter and ISACA standards

  • Build an audit program from a written scenario by selecting scope, objectives, and test procedures

  • Rank evidence types (observation, interview, inspection, reperformance) by reliability and justify each ranking

  • Explain how risk-based auditing drives audit universe prioritization and sampling decisions

  • Differentiate compliance, substantive, and control testing and pick the right one for three scenarios

Your checkpoint

One-page audit program outline for a supplied scenario plus a scored 30-question Domain 1 self-assessment (target 70% or higher)

Week 2

Information Systems Auditing Process & Protection of Information Assets

  • Apply the audit risk model (inherent, control, detection risk) to compute and interpret engagement risk for two case studies

  • Distinguish preventive, detective, and corrective controls and classify 20 listed controls without error

  • Draft audit findings in the standard condition/criteria/cause/effect/recommendation structure

  • Describe the layered defense concept and place logical, physical, and administrative controls in the correct layer

  • Identify the auditor's responsibilities for fraud detection, follow-up, and reporting to management versus the board

Your checkpoint

Three complete audit findings written in condition-criteria-cause-effect-recommendation format, each self-graded against an 8-point rubric

Week 3

Protection of Information Assets

  • Compare discretionary, mandatory, role-based, and rule-based access control models and select the appropriate model for four described environments

  • Distinguish symmetric encryption, asymmetric encryption, and hashing by purpose, key handling, and appropriate use case

  • Explain certificate authority trust chains and how digital certificates support authentication and nonrepudiation

  • Position firewalls, IDS/IPS, proxies, and VPNs in a network architecture and state what each does and does not protect

  • Apply a data classification scheme to assign handling, retention, and destruction requirements to sample data sets

Your checkpoint

Crypto and access-control decision table covering 12 scenarios with a written rationale for each choice, plus a 25-question Domain 5 quiz scored at 75% or higher

Week 4

Protection of Information Assets & Information Systems Operations and Business Resilience

  • Differentiate RTO, RPO, MTD, and MTBF and calculate each from supplied outage data

  • Match backup strategies (full, incremental, differential, mirroring, snapshot) to stated recovery objectives

  • Sequence incident response, problem management, and escalation steps for a simulated security event

  • Evaluate types of resilience testing (checklist, tabletop, simulation, parallel, full interruption) for cost and risk

  • Identify controls over job scheduling, capacity monitoring, and media handling in an operations walkthrough

Your checkpoint

Completed business continuity/disaster recovery test plan for a supplied scenario, including defined RTO/RPO targets and chosen test type, plus a timed 75-question mixed mock exam scored at 70% or higher

Week 5

Information Systems Operations and Business Resilience

  • Explain how IT operations management practices (change, configuration, problem, capacity) interact with business resilience

  • Design a backup rotation and offsite retention scheme that satisfies stated retention and recovery requirements

  • Audit a change management process by identifying where segregation of duties and approval evidence are required

  • Distinguish hot, warm, and cold recovery sites and justify site selection for two cost/risk profiles

  • Interpret monitoring, logging, and job-scheduling output to detect operational failures

Your checkpoint

Written gap analysis of an operations and resilience control set covering 15 controls, each rated as adequate or deficient with a stated remediation action

Week 6

Governance and Management of Information Technology

  • Align IT strategy to enterprise objectives using a documented IT governance framework and identify misalignment symptoms

  • Distinguish policies, standards, procedures, and guidelines and place 15 sample statements into the correct category

  • Structure an enterprise IT risk register with likelihood, impact, risk response, and owner for six sample risks

  • Differentiate IT roles and structures (steering committee, CIO, data owner, data custodian, security officer) by accountability

  • Evaluate IT performance using maturity models and balanced scorecard metrics for a described organization

Your checkpoint

Two-page IT governance assessment for a synthetic organization covering structure, policy hierarchy, and a six-item risk register with owners and responses

Week 7

Information Systems Acquisition, Development & Implementation

  • Sequence SDLC phases and specify the control activities and audit involvement appropriate to each phase

  • Compare waterfall, iterative, agile, and DevOps delivery models by where audit evidence is produced and retained

  • Evaluate test types (unit, integration, system, UAT, regression) and assign the correct owner and exit criteria for each

  • Audit change management and data migration controls including authorization, testing, and rollback planning

  • Define post-implementation review objectives and the criteria for deciding whether benefits were realized

Your checkpoint

Phase-by-phase SDLC control checklist with at least 20 controls, each tagged with the responsible role and the evidence the auditor would examine

Week 8

Information Systems Auditing Process & Governance and Management of Information Technology & Information Systems Acquisition, Development & Implementation & Information Systems Operations and Business Resilience & Protection of Information Assets

  • Complete a full-length timed mock exam under exam-day conditions without reference material

  • Triage every missed question into a domain, a root cause (knowledge gap, misread, or reasoning error), and a remediation action

  • Re-study the three highest-error subdomains using condensed notes and targeted drills

  • Construct a one-page exam-day decision framework for eliminating distractors on scenario questions

  • Rehearse a time budget that allocates roughly one minute per question with flagged-question review

Your checkpoint

Full-length timed mock exam scored at 78% or higher, accompanied by an error log in which every missed item has a named subdomain and completed remediation action

Milestones

Week 2: Solve 40 cumulative Domain 1 questions at 72% or higher and submit three rubric-graded audit findings; if either is missed, recycle Domain 1 drills into week 3's warm-up slot

Week 4: Score 70% or higher on a 75-question timed exam weighted to Domains 1 and 5, with no single domain below 60%

Week 6: Score 70% or higher on a 50-question exam covering Domains 2 and 4, and demonstrate a complete governance assessment and risk register deliverable

Week 8: Score 78% or higher on a full-length timed mock exam with every missed question logged, categorized, and remediated before exam day

CISA exam day

Your checklist

Primary photo ID

Bring a valid, unexpired government-issued photo ID with your signature. The name on the ID must match the name on your exam registration exactly. If your legal name has changed since you registered, contact the certification body before exam day to update your record.

Second form of ID

Some test delivery providers ask for a second piece of identification (e.g., a credit card or employee badge with signature). Requirements vary by location and delivery mode.

Appointment confirmation / authorization to test

Have your appointment confirmation number and the email confirming your exam authorization available (printed or on paper, since phones are typically not allowed in the testing room).

Exact test center address and route

Confirm the address and building/floor the day before. Test centers are often inside office parks or shared facilities; do a map review and note parking or transit options so you are not hunting for the door.

Remote-proctoring system check (if testing online)

If you are taking the exam via live remote proctoring, run the provider's system/equipment test in advance on the same computer and network you will use, and confirm your webcam, microphone, and browser meet requirements.

Arrival buffer

Plan to arrive well before your appointment time to allow for check-in and ID verification. Late arrivals may be refused entry or have time deducted, so build in a cushion for traffic and security screening. Confirm the provider's recommended arrival window.

Leave prohibited items behind or plan for storage

Phones, smartwatches, fitness trackers, notes, books, and bags are not allowed in the testing room. Many centers provide a locker; confirm what storage is available and avoid bringing valuables.

Know the allowed test aids

Personal calculators, scratch paper, and pens are generally not permitted; any calculator or note-taking tool used will be the one provided on screen or by the proctor. Confirm the current aid policy with the provider before relying on it.

Comfort and logistics

Use the restroom and drink water before entering the room, dress in layers for variable room temperature, and bring a snack for after the exam. Plan for a roughly four-hour continuous sitting.

Exam-day mindset material (review only)

Bring a one-page summary of the five CISA domains and their approximate weighting, plus your personal list of recurring traps (e.g., 'BEST', 'FIRST', 'MOST', auditor independence, control objectives before controls). Review it before check-in, not during the exam.

Adequate sleep and a normal meal

Do not sacrifice sleep for extra cramming in the final night. Fatigue costs more points on a 150-question, four-hour exam than one more practice set gains.

Plan the day

Final 72 hours - logistics

Reconfirm your appointment date, time, time zone, and location (or remote-proctoring setup). Verify your ID name matches your registration, and resolve any discrepancy with the provider now rather than at check-in. Print or save your confirmation details.

Final 72 hours - study

Stop learning new material. Do timed practice sets of 25–40 questions to rehearse pacing, then review only your error log: the domains and question types where you consistently lose points. Re-read your own summary sheets.

Final 72 hours - pacing rehearsal

Practice against the real budget: 150 questions in 240 minutes is about 1.6 minutes per question. Aim to finish a full-length practice set with 20–30 minutes left for flagged items.

Final 72 hours - body clock

Shift your sleep and meal schedule toward your exam start time so you are alert during the actual testing window.

24 hours before

Do a light review only (domain weights, key definitions, mnemonics). Pack your ID and confirmation, lay out clothes, confirm travel time and parking, and set two alarms. Avoid heavy practice tests the day before - a bad score the night before only erodes confidence.

24 hours before - provider policies

Re-read the provider's candidate handbook for arrival time, ID requirements, permitted items, break policy, and reschedule rules, so nothing at check-in is a surprise.

Morning of

Eat a normal meal, hydrate, and avoid caffeine beyond your usual amount. Do not cram in the car or lobby. Arrive early, complete ID verification, use the restroom, and take a few calm breaths before the clock starts.

During the test - first pass

Read the full question stem before the options. Watch for qualifiers: BEST, MOST likely, FIRST step, PRIMARY. Eliminate two options, then choose between the remainder based on what an IS auditor would do. If a question stalls you past about two minutes, pick your best answer, flag it, and move on.

During the test - mid-point check

At roughly the halfway mark, compare questions completed to time remaining. If you are behind, tighten your pace and stop re-reading answers you have already chosen. Never leave a question blank: there is no penalty for guessing.

During the test - final phase

Reserve the last 15–20 minutes for flagged items. Change an answer only if you can point to a specific word or fact you misread - second-guessing without a reason usually hurts.

After the test

Collect your preliminary result if one is issued at the center, note anything you want to remember about the experience, and then stop analyzing questions. Official confirmation and scoring details arrive through your certification account - confirm the stated turnaround with the provider.

Rules to check

  • Identification: the name on your government-issued photo ID must exactly match your registration. Name changes or discrepancies must be resolved with the certification body before exam day; a mismatch can result in being turned away.

  • Prohibited items: no phones, smartwatches, wearable technology, notes, books, or study materials in the testing room. Unauthorized items - even if unused - can lead to score invalidation. Confirm the provider's storage and permitted-item list in advance.

  • Continuous sitting: plan for a roughly four-hour, 150-question exam. Any break policy (scheduled or unscheduled, and whether the clock keeps running) is set by the provider - confirm it in the candidate handbook before test day.

  • Scoring: CISA is scored on a scaled range of 200–800, and 450 is the passing score, based on 150 multiple-choice questions. There is no penalty for incorrect answers, so answer every question even when uncertain.

  • Results: preliminary pass/fail information may be issued at the test center, and official results are typically published in your certification account afterward. Do not treat the preliminary notice as final; confirm timing with the provider.

  • Rescheduling and retakes: fees, deadlines, and any waiting period between attempts are set by the certification body and can change. Confirm current terms with the provider rather than relying on secondhand information.

  • Conduct and confidentiality: do not attempt to record, reproduce, or share exam content, and follow the proctor's instructions at all times. Irregularities or suspected cheating can void your result and affect eligibility for future attempts.

  • Exam-day decisions over perfection: answer each question as the auditor described in the exam's own framework would, pick the BEST available option rather than the theoretically perfect one, and manage the clock so that no question is left unanswered.

CISA FAQ

How many CISA practice questions are available?

The practice set has 200 CISA questions. Each one includes the choices, the correct answer, and an explanation, and the set is free to read with no signup.

How many CISA flashcards are available?

The flashcard set has 32 CISA cards. Each card shows the term and its definition.

Which topics does the CISA study material cover?

The CISA study material has 5 sections, including Information Systems Auditing Process, Governance and Management of IT, and Information Systems Acquisition, Development and Implementation.

What format facts does the catalog list for the CISA exam?

The catalog lists these item types: computer-based and administered at authorized PSI testing centers globally or as remotely proctored exams for the CISA exam.