AEE Certified Energy Manager (CEM) Practice Test

Certified Energy Manager (CEM)

AEE Certified Energy Manager (CEM) overview

  • 200 practice questions
  • 32 flashcards
  • 10 study guide topics
  • 40 key terms

What you'll study

  • Codes and Standards10%
  • Electrical Power Systems and Motors10%
  • Maintenance and Commissioning10%
  • Energy Audits and Instrumentation10%
  • CHP Systems and Renewable Energy10%
  • HVAC Systems10%
  • Building Automation and Control Systems10%
  • Thermal Energy Storage Systems10%
  • Lighting Systems10%
  • Energy Savings Performance Contracting and Measurement and Verification10%

The Certified Energy Manager (CEM®) is a professional credential awarded by the Association of Energy Engineers to individuals who can demonstrate broad, practical knowledge of energy management. It is aimed at engineers, facility and plant managers, energy consultants, commissioning and sustainability staff, and others accountable for reducing energy use and cost in commercial, institutional, and industrial facilities. The exam is drawn from a published body of knowledge organized into sections covering Codes and Standards, Electrical Power Systems and Motors, Maintenance and Commissioning, Energy Audits and Instrumentation, CHP Systems and Renewable Energy, HVAC Systems, Building Automation and Control Systems, Thermal Energy Storage Systems, Lighting Systems, and Energy Savings Performance Contracting and Measurement and Verification. AEE revised that body of knowledge in 2018: the High Performance Buildings section moved into Codes and Standards, Motors and Drives merged into Electrical Power Systems and Motors, and subtopics such as electronically commutated motors, micro-grids and battery storage, smart pumps, chilled beam systems, the Internet of Things, phase change materials, thermal storage for heating, luminaire-specific lighting controls, and Utility Energy Services Contracts were added. AEE validates the exam through a Job Task Analysis roughly every five years. Preparation should center on the current body of knowledge, supported by AEE training programs or, for already-certified and lapsed CEMs, the two-day CEM Update course.

Common mistakes

Selects the standard whose number looks familiar instead of reading the applicability language in the stem - e.g., applying ASHRAE 90.1 envelope or LPD limits to a project the stem describes as a single-family residential renovation, or citing 90.1 for a scope where the stem names the IECC.

The exam draws on many overlapping documents (90.1, 62.1, 55, IECC, NFPA 70, state codes), and candidates pattern-match on standard numbers they have memorized rather than checking scope, occupancy type, and new-versus-existing status.

What to do instead

Before choosing an answer, underline in the stem the applicability triggers: building type, new vs. existing/alteration, scope (envelope, HVAC, lighting, whole building), and jurisdiction. Eliminate any standard whose stated scope does not match those triggers, even if the number is the one you know best.

Computes three-phase motor input power as P = V x I x power factor, omitting the square root of three, and then carries that understated kW into demand and energy savings calculations.

The single-phase formula is the one most often rehearsed, and in a timed exam the missing 1.732 is invisible because the resulting number still looks plausible.

What to do instead

Write P(3-phase) = 1.732 x V(line-to-line) x I(line) x PF on your scratch sheet before starting the electrical items, and sanity-check any motor kW against nameplate horsepower x 0.746 divided by efficiency.

Recommends 'commissioning' as the remedy for an existing building whose chillers are short-cycling and whose economizer dampers are stuck, when the stem is describing an ongoing operations-and-maintenance deficiency.

Cx, retro-commissioning, monitoring-based commissioning, and M&V are used loosely in practice, so the terms blur; candidates pick the word they associate with 'finding problems' rather than the process that fits the building's life stage.

What to do instead

Keep a four-line definition on your scratch sheet: Cx = new building/verification of design intent; RCx = existing building, no capital; MBCx = ongoing with trend data and fault diagnostics; M&V = quantifying savings against a baseline. Match the stem's building life stage and whether a baseline is being established.

Builds an annual motor or chiller energy estimate from a single instantaneous clamp-on ammeter reading taken during a walk-through, then multiplies by 8,760 hours.

Spot readings are fast and available during a Level 1 walk-through, and the arithmetic is easy, so the result looks rigorous; the missing load profile, duty cycle, and part-load behavior are never surfaced in the answer choices.

What to do instead

Match data quality to the audit level: Level 1 may use billing and nameplate with assumed load factors; Level 2 and 3 require interval loggers (power or current) over a representative week or more, with operating hours and load factor derived from the logged profile. Where a spot reading is all you have, say so and apply an explicit, stated load factor.

Reports combined heat and power plant efficiency as electrical output divided by fuel input, concluding the plant is roughly 35 percent efficient and inferior to grid-supplied power.

Power-plant efficiency conventions are deeply ingrained, and candidates forget that the CHP question is asking about total system efficiency including useful thermal recovery.

What to do instead

Use total system efficiency = (net electrical output + recovered useful thermal output) / fuel energy input, and separately state the power-to-heat ratio. If thermal output is being dumped, say so, because that is the finding the question is testing.

Compares two cooling options where one is rated by EER and the other by COP, and picks the higher number without converting to a common metric.

EER, SEER, COP, and kW/ton all describe cooling efficiency, and under time pressure the numbers look interchangeable when they are on different scales.

What to do instead

Convert everything to one metric before comparing: COP = EER / 3.412, and kW/ton = 12 / EER. Note also that SEER is a seasonal (part-load, bin-weighted) rating and cannot be compared directly against a full-load EER or COP.

Claims an energy (kWh) saving from a control-sequence change such as lowering a supply-air temperature reset or widening a static-pressure setpoint, without analyzing the simultaneous fan, reheat, and terminal-box effects.

Setpoint changes are described in the BAS narrative as though they are free, and candidates credit the intended effect on one component while ignoring the coupled response elsewhere in the air system.

What to do instead

Treat any control change as a whole-system question: identify which end uses gain and which lose, then quantify with a bin or hourly method. If the stem gives no basis for quantifying the interaction, the correct answer is usually 'insufficient information' or a metered M&V plan, not a single-direction savings claim.

States that adding chilled-water or ice thermal energy storage reduces annual kWh consumption, and credits the full shifted load as energy savings.

Load shifting is visually compelling on a demand profile, and the distinction between reducing kWh and moving kWh off peak is easy to lose when the question is framed around a utility bill.

What to do instead

Frame TES as a cost measure first: it shifts kW and kWh to lower-cost periods and may reduce demand charges, but it adds parasitic pump/compressor energy and standby tank heat gain, so site kWh typically rises slightly. Savings claims belong on the cost side using the actual TOU and demand rate structure.

Calculates lighting power density from lamp wattage alone (or from lamp lumens divided by a rule-of-thumb efficacy) instead of using luminaire input watts including ballast or driver losses.

Lamp wattage is what appears on the label and in the catalog headline, and ballast factor and driver losses are a small-looking percentage that is easy to skip.

What to do instead

Use luminaire input watts (lamp watts divided by ballast efficiency, or driver input watts) for every LPD and energy calculation, and state the ballast factor and the calculation method (building-area vs. space-by-space) explicitly, since the two methods give different allowances.

Computes first-year savings in an ESPC project by subtracting post-retrofit metered energy from the pre-retrofit baseline year, without applying routine adjustments for weather, occupancy, or production changes.

The straightforward baseline-minus-actual arithmetic is what most people have seen, and the routine-adjustment step is easy to drop when the question presents a clean table of two years of data.

What to do instead

Under IPMVP, the baseline must be adjusted for routine determinants (degree-days, occupancy, production) before comparison. Check whether the stem supplies weather or occupancy data; if it does, the answer requires normalized savings; if not, flag the result as unadjusted. Also confirm the option (A, B, C, D) matches the measurement boundary and whether interactive effects are in scope.

Exam requirements can change. Confirm current details with the exam provider.

AEE Certified Energy Manager (CEM) practice

200 questions. Each one lists the choices, the correct answer, and an explanation. With JavaScript, this list opens one question at a time. The checker at the top of this page saves progress in this browser when it is available.

  1. Question 1Codes and Standards

    ASHRAE Standard 90.1 applies to which of the following buildings?

    1. A two-story duplex apartment
    2. A three-story multifamily residence
    3. A one-story single-family house
    4. A three-story office tower Correct answer.

    Explanation

    ASHRAE 90.1 covers buildings except low-rise residential buildings, which are defined as residential buildings three stories or fewer above grade. Single-family houses, duplexes, and low-rise multifamily buildings fall under ASHRAE 90.2 instead. A three-story office tower is a commercial building and therefore within 90.1 scope.

  2. Question 2Codes and Standards

    The International Energy Conservation Code (IECC) is developed and published by which organization?

    1. The National Fire Protection Association
    2. The American Society of Heating, Refrigerating and Air-Conditioning Engineers
    3. The U.S. Green Building Council
    4. The International Code Council Correct answer.

    Explanation

    The IECC is a model energy code maintained and published by the International Code Council. ASHRAE publishes Standard 90.1, which is a separate energy standard often referenced as an alternative compliance path. NFPA and USGBC publish fire codes and green building rating systems, respectively.

  3. Question 3Codes and Standards

    ASHRAE Standard 62.1 addresses which subject?

    1. Energy efficiency in new commercial buildings
    2. Thermal comfort in occupied spaces
    3. Ventilation and indoor air quality Correct answer.
    4. Energy use in existing buildings

    Explanation

    ASHRAE 62.1 is titled Ventilation for Acceptable Indoor Air Quality and sets minimum ventilation rates and other IAQ requirements. Thermal comfort is addressed by Standard 55, and energy efficiency in new commercial buildings by Standard 90.1. Standard 100 addresses existing buildings.

  4. Question 4Codes and Standards

    ASHRAE Standard 55 sets requirements for which of the following?

    1. Motor efficiency test methods
    2. Energy performance of data centers
    3. Human thermal comfort conditions Correct answer.
    4. Residential ventilation requirements

    Explanation

    ASHRAE 55 defines the ranges of indoor thermal environmental conditions that are acceptable to a specified percentage of occupants. It addresses temperature, humidity, air speed, radiant asymmetry, and clothing and metabolic factors. It does not set ventilation rates, motor efficiency, or data center energy requirements.

  5. Question 5Codes and Standards

    In ASHRAE 90.1, lighting power density for a building is normally expressed in which units?

    1. Kilowatt-hours per square foot
    2. Watts per square foot Correct answer.
    3. Footcandles per square meter
    4. Lumens per watt

    Explanation

    Lighting power density (LPD) is the connected lighting power divided by the floor area of the space or building, expressed in watts per square foot in inch-pound units. Lumens per watt is efficacy, and footcandles measure illuminance. Kilowatt-hours per square foot measures annual energy use, not connected power density.

  6. Question 6Codes and Standards

    The Energy Independence and Security Act of 2007 established efficiency standards that phased out which lamps?

    1. T8 linear fluorescent tube lamps
    2. Integrated LED downlight fixtures
    3. Standard incandescent bulbs Correct answer.
    4. Ceramic metal halide arc lamps

    Explanation

    EISA 2007 set maximum wattage standards for general service incandescent lamps in common wattages, which effectively phased out the least efficient standard incandescent bulbs. The law did not phase out fluorescent, metal halide, or LED products. It also addressed other efficiency measures, including federal building performance.

  7. Question 7Codes and Standards

    Under ASHRAE 90.1, the requirement for an air-side economizer on a comfort cooling system depends primarily on which two factors?

    1. Cooling capacity and climate zone Correct answer.
    2. Chiller efficiency and refrigerant type
    3. Fan power and duct static pressure
    4. Building height and occupancy type

    Explanation

    ASHRAE 90.1 Section 6.5.1 requires economizers based on the cooling system capacity and the ASHRAE climate zone in which the building is located. Larger systems in cooler climate zones are more likely to require economizers, while some climate zones have exceptions. Fan power, chiller efficiency, and building height do not trigger the economizer requirement.

  8. Question 8Codes and Standards

    In the ASHRAE 62.1 Ventilation Rate Procedure, the breathing zone outdoor airflow rate Vbz is calculated by which expression?

    1. Rp x Az + Ra x Pz
    2. Ra x Pz + Rp x Az
    3. Rp x Pz + Ra x Az Correct answer.
    4. Pz x Az / (Rp + Ra)

    Explanation

    The breathing zone outdoor airflow is the sum of the people component and the area component: Vbz = Rp x Pz + Ra x Az. Rp is the outdoor airflow rate required per person, Pz is the zone population, Ra is the rate per unit area, and Az is the zone floor area. The other expressions incorrectly combine or divide these terms.

  9. Question 9Codes and Standards

    ISO 50001 contains requirements for which of the following?

    1. A building energy code
    2. A lighting power budget
    3. A refrigerant management plan
    4. An energy management system Correct answer.

    Explanation

    ISO 50001 specifies requirements for establishing, implementing, maintaining, and improving an energy management system. It is built on the Plan-Do-Check-Act cycle and requires an energy policy, energy objectives, and action plans. It is not a prescriptive building code or a lighting or refrigerant regulation.

  10. Question 10Codes and Standards

    ASHRAE 90.1 requires automatic lighting shutoff controls for interior lighting in buildings larger than what floor area?

    1. 10,000 square feet
    2. 2,000 square feet
    3. 25,000 square feet
    4. 5,000 square feet Correct answer.

    Explanation

    ASHRAE 90.1 Section 9.4.1.1 requires automatic lighting shutoff controls in buildings larger than 5,000 square feet. The controls may be time-switch based, occupancy based, or another approved automatic method. Smaller buildings are not subject to that specific automatic shutoff requirement.

  11. Question 11Codes and Standards

    In EPA's ENERGY STAR Portfolio Manager, a 1-100 energy score of 75 for an office building indicates which of the following?

    1. It has met 75% of certification requirements
    2. It uses 75% of the energy of an average building
    3. It uses 75% less energy than the national median
    4. It ranks in the top 25% of similar buildings Correct answer.

    Explanation

    The ENERGY STAR score compares a building's source energy use with that of similar buildings nationwide; a score of 75 means it performs better than 75% of its peers, placing it in the top quartile. A score of 50 represents median performance. A score of 75 is one eligibility criterion for ENERGY STAR certification, but other criteria must also be met.

  12. Question 12Codes and Standards

    ASHRAE Standard 100 provides requirements for which of the following?

    1. Energy efficiency in low-rise residential buildings
    2. Ventilation for acceptable indoor air quality
    3. Energy efficiency in existing buildings Correct answer.
    4. Thermal comfort in occupied spaces

    Explanation

    ASHRAE Standard 100 is the energy efficiency standard for existing buildings. It addresses operation, maintenance, and retrofit measures to improve energy performance over time. New commercial buildings are covered by 90.1, and low-rise residential buildings by 90.2.

  13. Question 13Codes and Standards

    California's Title 24, Part 6 contains which of the following?

    1. Energy efficiency standards Correct answer.
    2. Voluntary green rating requirements
    3. Plumbing fixture requirements
    4. Fire and life safety requirements

    Explanation

    Title 24, Part 6 is the California Energy Code, which contains the state's building energy efficiency standards. It covers residential and nonresidential energy requirements and is updated on a three-year cycle. Fire requirements are in Part 9, and plumbing requirements are in Part 5.

  14. Question 14Codes and Standards

    ASHRAE Standard 189.1 provides requirements for which type of building?

    1. High-performance green buildings Correct answer.
    2. Health care facilities only
    3. Existing buildings only
    4. Low-rise residential buildings of three stories or fewer

    Explanation

    ASHRAE 189.1 is the Standard for the Design of High-Performance Green Buildings and is often used as the technical basis for the International Green Construction Code. It covers site, water, energy, materials, and indoor environmental quality beyond the minimum energy code. It applies broadly to new construction and major renovations.

  15. Question 15Codes and Standards

    ASHRAE 90.1 limits HVAC fan system power primarily by which method?

    1. A fixed 5 horsepower cap per air handler
    2. A maximum W/cfm based on system type Correct answer.
    3. A percentage of connected chiller capacity
    4. A maximum duct static pressure of 2 in. w.c.

    Explanation

    ASHRAE 90.1 Section 6.5.3 limits fan system power in watts per cubic foot per minute of supply air, with the allowable value depending on the system type. The limitation is intended to encourage efficient fan and duct design. It does not impose a fixed horsepower cap or a universal duct static pressure limit.

  16. Question 16Codes and Standards

    ASHRAE 62.1 demand-controlled ventilation typically modulates outdoor air based on which sensor?

    1. A differential temperature sensor
    2. A carbon dioxide sensor Correct answer.
    3. A duct static pressure sensor
    4. A relative humidity sensor

    Explanation

    Demand-controlled ventilation commonly uses carbon dioxide concentration as an indicator of occupancy and adjusts outdoor air delivery accordingly. It is permitted where the zone population varies and the design maintains the required minimum rates. Static pressure, humidity, and temperature sensors serve other control functions.

  17. Question 17Codes and Standards

    In ASHRAE 90.1 Appendix G, the baseline building performance is determined by simulating the proposed design at how many orientations?

    1. Four orientations Correct answer.
    2. Eight orientations
    3. Two orientations
    4. One orientation

    Explanation

    Appendix G requires the baseline building model to be rotated to the four cardinal orientations, and the average of the four results is used as the baseline performance. This reduces sensitivity to the actual building orientation. The proposed design is modeled in its actual orientation.

  18. Question 18Codes and Standards

    Under ASHRAE 62.1, the Indoor Air Quality Procedure differs from the Ventilation Rate Procedure in which way?

    1. It prescribes fixed outdoor airflow rates per person
    2. It removes the requirement for outdoor air
    3. It relies on contaminant limits Correct answer.
    4. It applies only to residential occupancies

    Explanation

    The Indoor Air Quality Procedure is a performance-based approach that limits known contaminants and maintains acceptable perceived air quality. The Ventilation Rate Procedure is prescriptive and uses tabulated outdoor airflow rates per person and per unit area. Both procedures require adequate outdoor air and apply to nonresidential occupancies covered by 62.1.

  19. Question 19Codes and Standards

    Which ASHRAE 90.1 compliance path allows trade-offs among envelope, lighting, and HVAC systems?

    1. The energy cost budget method Correct answer.
    2. The envelope trade-off option only
    3. The mandatory provisions only
    4. The prescriptive path only

    Explanation

    The Energy Cost Budget method compares the proposed design's annual energy cost with that of a budget building, allowing trade-offs across envelope, lighting, and HVAC systems. The prescriptive provisions in Sections 5 through 10 generally must be met without cross-system trade-offs, except for the limited envelope trade-off option. The mandatory provisions apply regardless of the compliance path.

  20. Question 20Codes and Standards

    For commercial buildings, the IECC generally permits compliance by showing that the building meets which ASHRAE standard as an alternative?

    1. ASHRAE 90.1 Correct answer.
    2. ASHRAE 55
    3. ASHRAE 62.1
    4. NFPA 101

    Explanation

    The IECC commercial provisions allow compliance with ASHRAE 90.1 as an alternative to the IECC's own commercial requirements. A building designed to meet 90.1 is generally deemed to satisfy the IECC commercial energy provisions. Standards 62.1 and 55 address ventilation and thermal comfort rather than the energy code alternative.

  21. Question 21Electrical Power Systems and Motors

    Power factor in an AC electrical system is defined as which ratio?

    1. Reactive power divided by real power
    2. Real power divided by reactive power
    3. Real power divided by apparent power Correct answer.
    4. Apparent power divided by real power

    Explanation

    Power factor is the cosine of the angle between voltage and current, numerically equal to real power (kW) divided by apparent power (kVA). Inductive loads such as motors draw lagging reactive power, which drives the ratio below unity. Utilities penalize low power factor because the extra current heats conductors without delivering useful work.

  22. Question 22Electrical Power Systems and Motors

    The synchronous speed of a polyphase induction motor is given by which expression, where f is supply frequency in hertz and P is the number of poles?

    1. f/(120P)
    2. 120f/P Correct answer.
    3. 60f/P
    4. P/(120f)

    Explanation

    Synchronous speed in revolutions per minute equals 120 times the frequency divided by the number of poles. The constant 120 combines the conversion from hertz to revolutions per minute with the fact that a pole pair is completed every half cycle. Actual rotor speed is a few percent lower because of slip.

  23. Question 23Electrical Power Systems and Motors

    An electric bill shows both a kilowatt-hour charge and a kilowatt demand charge. The demand charge is based on which quantity?

    1. Peak power demand reached in the period Correct answer.
    2. Average power measured across the period
    3. Total energy consumed over the whole period
    4. Reactive energy supplied to the facility

    Explanation

    The demand charge recovers the cost of capacity the utility must hold available, so it is set by the highest rate of power use recorded in the billing period. Energy charges recover fuel and variable costs and are based on accumulated kilowatt-hours. Demand is normally integrated over a short window such as 15 or 30 minutes.

  24. Question 24Electrical Power Systems and Motors

    A variable frequency drive controls the speed of an AC induction motor primarily by varying which parameter?

    1. Supply frequency Correct answer.
    2. Number of motor poles
    3. Supply voltage magnitude only
    4. Stator winding resistance

    Explanation

    The inverter stage of a drive changes the frequency of the voltage applied to the motor, and synchronous speed is directly proportional to frequency. Volts-per-hertz control adjusts voltage along with frequency so that air-gap flux stays essentially constant. Pole count and winding resistance are fixed by the motor design.

  25. Question 25Electrical Power Systems and Motors

    In a transformer, the copper (winding) losses vary in proportion to which quantity?

    1. The square of the load current Correct answer.
    2. The load power factor
    3. The load current directly
    4. The square root of the applied voltage

    Explanation

    Winding loss is resistive loss, equal to current squared times resistance, so it rises with the square of load current and is called a variable or load loss. Core loss from hysteresis and eddy currents is essentially constant at rated voltage and frequency. Maximum efficiency occurs where the two loss components are equal.

  26. Question 26Electrical Power Systems and Motors

    Load factor for a facility is defined as which ratio?

    1. Peak demand divided by average load
    2. Average load divided by peak demand Correct answer.
    3. Connected load divided by peak demand
    4. Peak demand divided by connected load

    Explanation

    Load factor is average load divided by peak demand over the same period, and it measures how fully the peak capacity is used. A low load factor means capital-intensive capacity sits idle much of the time. It is distinct from demand factor, which relates peak demand to connected load.

  27. Question 27Electrical Power Systems and Motors

    A 500 kW load operates at 0.80 power factor. What capacitor rating is required to raise the plant power factor to 0.95?

    1. 286 kVAr
    2. 164 kVAr
    3. 375 kVAr
    4. 211 kVAr Correct answer.

    Explanation

    Required reactive compensation equals real power times the difference between the tangents of the initial and target power factor angles. For 500 kW: 500 x (0.750 - 0.329), which is about 211 kVAr. Adding capacitors supplies reactive power locally and does not change the kW demand of the load.

  28. Question 28Electrical Power Systems and Motors

    A balanced three-phase motor draws 460 V, 60 A at 0.85 power factor. What is its electrical input power?

    1. 23.5 kW
    2. 34.5 kW
    3. 47.8 kW
    4. 40.6 kW Correct answer.

    Explanation

    Three-phase input power is the square root of three times line voltage times line current times power factor. Substituting gives 1.732 x 460 x 60 x 0.85, or roughly 40.6 kW. Ignoring the power factor would yield apparent power in kVA rather than real power.

  29. Question 29Electrical Power Systems and Motors

    Which of the following best describes the function of a solid-state soft starter?

    1. It converts DC power to AC for the motor
    2. It corrects the motor power factor to unity
    3. It maintains constant motor speed regardless of load
    4. It limits inrush current during acceleration Correct answer.

    Explanation

    A soft starter uses thyristors to ramp the applied voltage during acceleration, which reduces starting current and torque compared with a direct-on-line start. It is bypassed once the motor reaches full speed and does not regulate running speed. Continuous speed control requires a variable frequency drive instead.

  30. Question 30Electrical Power Systems and Motors

    A 4-pole, 60 Hz induction motor has a nameplate full-load speed of 1750 rpm and is measured at 1762 rpm. What is its approximate load?

    1. About 50%
    2. About 95%
    3. About 76% Correct answer.
    4. About 30%

    Explanation

    Slip is the gap between synchronous speed and actual rotor speed; for 4 poles at 60 Hz the synchronous speed is 1800 rpm. Full-load slip is 1800 minus 1750, or 50 rpm, while measured slip is 1800 minus 1762, or 38 rpm. Load is therefore roughly 38 divided by 50, about 76% of rating.

  31. Question 31Electrical Power Systems and Motors

    Voltage unbalance on a three-phase induction motor primarily causes which adverse effect?

    1. Higher shaft speed and increased windage losses
    2. Lower starting torque and reduced inrush current
    3. Negative-sequence current that heats the rotor Correct answer.
    4. Higher power factor and reduced line current

    Explanation

    An unbalanced supply resolves into positive- and negative-sequence components; the negative-sequence component rotates against the rotor and induces currents near twice line frequency. Those currents concentrate in the rotor and cause rapid heating and reduced insulation life. Motors are therefore derated for unbalance well before 5%.

  32. Question 32Electrical Power Systems and Motors

    When a standard-efficiency induction motor is replaced with a NEMA Premium efficiency unit, the savings are greatest under which operating condition?

    1. Long idle periods with the motor energized
    2. Continuous full-load operation for many hours Correct answer.
    3. Intermittent duty of under one hour per day
    4. Frequent starting and stopping at light load

    Explanation

    Savings equal the efficiency improvement multiplied by the energy the motor actually consumes, so they are largest for motors that run many hours near rated load. Light, intermittent, or idle duty leaves little energy to save and stretches the simple payback past the motor's life. High-hour, high-load motors are therefore screened first.

  33. Question 33Electrical Power Systems and Motors

    A tariff contains a 12-month ratchet of 80% of the highest billing demand. If the July peak was 400 kW and January's peak is 250 kW, what demand is billed in January?

    1. 320 kW Correct answer.
    2. 400 kW
    3. 200 kW
    4. 250 kW

    Explanation

    A ratchet clause bills the greater of the current period's demand or a stated percentage of the highest demand over the preceding months. Here 80% of 400 kW equals 320 kW, which exceeds the January peak of 250 kW. The ratchet is designed to recover fixed capacity costs from customers whose peaks drop seasonally.

  34. Question 34Electrical Power Systems and Motors

    Six-pulse variable frequency drives are a significant source of which harmonic orders in a facility's electrical system?

    1. 3rd and 9th
    2. 2nd and 3rd
    3. 5th and 7th Correct answer.
    4. 4th and 8th

    Explanation

    A six-pulse converter generates characteristic harmonics at orders equal to six times an integer plus or minus one, so the 5th, 7th, 11th, and 13th dominate. The 5th and 7th are usually the largest in magnitude. Even-order and triplen harmonics largely cancel in a balanced three-phase bridge.

  35. Question 35Electrical Power Systems and Motors

    An induction motor that is substantially oversized for its driven load will typically exhibit which operating characteristic?

    1. Higher power factor and lower efficiency
    2. Lower power factor and higher efficiency
    3. Lower power factor and lower efficiency Correct answer.
    4. Higher power factor and a higher efficiency

    Explanation

    At light load the magnetizing current becomes a large share of total current, so power factor falls sharply. Part-load efficiency also drops because fixed losses are spread over a smaller useful output. Matching motor size to actual load is therefore a standard efficiency measure.

  36. Question 36Electrical Power Systems and Motors

    At what loading does a transformer reach its maximum efficiency?

    1. When the load power factor is unity
    2. When core losses equal copper losses Correct answer.
    3. When copper losses are twice the core losses
    4. When the transformer carries full-load current

    Explanation

    Efficiency peaks where the constant core, or no-load, losses exactly equal the variable copper losses. Because copper loss grows with the square of load current, this balance typically occurs below nameplate rating. The load power factor affects how kVA converts to kW but not the loss-equality condition.

  37. Question 37Electrical Power Systems and Motors

    A 100 kW centrifugal pump runs 4,000 hours per year. A variable frequency drive reduces average flow to 80% of design. Using the affinity laws and ignoring drive losses, what is the approximate annual energy saving?

    1. About 100,000 kWh
    2. About 320,000 kWh
    3. About 80,000 kWh
    4. About 195,000 kWh Correct answer.

    Explanation

    For a centrifugal machine, shaft power varies with the cube of speed and flow. At 80% flow the power becomes 0.8 cubed, or about 0.512 of the original, a saving of roughly 48.8%. Applied to 100 kW for 4,000 hours, the saving is about 195,000 kWh per year.

  38. Question 38Electrical Power Systems and Motors

    Installing power factor correction capacitors in a facility with high harmonic distortion can create which problem?

    1. Parallel resonance that amplifies harmonic currents Correct answer.
    2. Harmonic distortion is reduced at the capacitor bank
    3. Lower harmonic levels because capacitors absorb them
    4. Higher motor synchronous speed and reduced slip

    Explanation

    The capacitor bank forms a resonant circuit with the source and transformer inductance, and the resonant frequency can coincide with a harmonic produced by drives. When that happens, harmonic voltages and currents are amplified, stressing capacitors and causing nuisance trips. Detuned reactors or tuned filter banks are used to shift the resonance safely.

  39. Question 39Electrical Power Systems and Motors

    A 50 hp (37 kW) motor with 94% nameplate efficiency draws a measured 30 kW at the input. What is its approximate load?

    1. About 60%
    2. About 81%
    3. About 76% Correct answer.
    4. About 94%

    Explanation

    Shaft output equals measured input power multiplied by motor efficiency, so 30 kW times 0.94 is about 28.2 kW. Dividing by the 37 kW rating gives roughly 76% load. Shaft output is always below the measured input because of motor losses.

  40. Question 40Electrical Power Systems and Motors

    A 300 kVAr capacitor bank is connected to a 480 V three-phase bus. What line current does the bank draw?

    1. 208 A
    2. 361 A Correct answer.
    3. 625 A
    4. 180 A

    Explanation

    Three-phase reactive power equals the square root of three times line voltage times line current, so current is kVAr divided by 1.732 times the line voltage. For 300 kVAr at 480 V, that is 300,000 divided by 831, or about 361 A. This is the same magnitude as the reactive current the bank supplies to the load.

  41. Question 41Maintenance and Commissioning

    Which of the following best describes the primary objective of a preventive maintenance program for building mechanical equipment?

    1. Repair of equipment only after a failure has occurred and a work order has been issued
    2. Scheduled service based on manufacturer guidance and operating history, before failure occurs Correct answer.
    3. Reduction of total maintenance labor by eliminating routine inspections and all scheduled service tasks
    4. Replacement of major equipment at fixed intervals regardless of its measured condition

    Explanation

    Preventive maintenance is planned, time- or usage-based service intended to reduce unplanned failures and preserve equipment efficiency. It is triggered by schedules and operating history rather than by breakdown. This keeps labor and downtime predictable and protects performance between capital renewals.

  42. Question 42Maintenance and Commissioning

    Vibration analysis performed on a large centrifugal fan motor is best classified as which type of maintenance activity?

    1. Deferred maintenance, postponed to a future budget cycle
    2. Predictive maintenance, based on measured condition data Correct answer.
    3. Routine housekeeping, performed by janitorial staff
    4. Corrective maintenance, performed after a deficiency is found

    Explanation

    Predictive or condition-based maintenance uses measured parameters such as vibration, temperature, and oil analysis to trend degradation and schedule intervention before functional failure. Corrective maintenance is the repair work done after a problem is identified. Vibration monitoring is a diagnostic input, not a repair task.

  43. Question 43Maintenance and Commissioning

    An infrared scan of an electrical panel shows one breaker termination running much hotter than the other two phases at comparable load. What is the most appropriate first action?

    1. De-energize the entire building immediately and replace the panel and all of its breakers
    2. Raise the load on the panel temporarily to confirm that the temperature reading repeats reliably
    3. Log the anomaly and check the termination; a phase delta under load signals added resistance Correct answer.
    4. Ignore the reading, since phase-to-phase temperature differences of this size are always normal

    Explanation

    Thermographic surveys compare phase-to-phase and similar-load conditions; an unbalanced temperature rise indicates a high-resistance connection such as a loose lug or deteriorated conductor. The finding is recorded, prioritized by severity, and the connection is investigated and repaired under a safe work plan. Load is not increased to verify a suspected hot connection.

  44. Question 44Maintenance and Commissioning

    A steam trap survey finds one trap discharging live steam continuously to the condensate return. What does this indicate and what action is required?

    1. The trap has failed open; repair or replace it, since live steam is being wasted Correct answer.
    2. The trap is undersized; a larger trap of the same type should be installed
    3. The trap is cold and blocked; it should be warmed slowly with live steam
    4. The trap is working normally; continuous discharge is expected on all steam traps

    Explanation

    A trap passing live steam to the return has failed in the open position, wasting the steam's latent heat and adding flash load to the condensate system. Trap surveys classify findings as blowing-through, cold or plugged, and leaking so repairs can be prioritized. Failed-open traps typically produce the largest energy penalty.

  45. Question 45Maintenance and Commissioning

    A plant compressor runs loaded most of the time, and a leak survey attributes a significant share of its output to leaks. Which approach best quantifies the value of repairing them?

    1. Compare the compressor nameplate horsepower with the plant electrical service rating
    2. Count the leaks found and multiply by the purchase price of a replacement fitting
    3. Convert saved airflow to input power using specific power, then to energy cost Correct answer.
    4. Measure the ambient temperature rise in the compressor room during loaded operation

    Explanation

    Leak savings are quantified by the reduction in delivered air flow, converted to compressor input power through the compressor's specific power in kW per cfm, then multiplied by operating hours and energy cost. This produces an annual dollar figure and simple payback for the repair program. Counting leaks yields no energy value.

  46. Question 46Maintenance and Commissioning

    In the commissioning process, the commissioning authority (CxA) is normally contracted by and reports to which party?

    1. The general contractor, so the CxA can direct the subcontractors' work
    2. The equipment manufacturer, so equipment warranties are protected
    3. The design engineer of record, so design issues can be resolved quickly
    4. The owner, so findings stay independent of the design and construction team Correct answer.

    Explanation

    The CxA serves the owner's interest, which requires independence from the organizations whose work is being verified. Independence lets the CxA report deficiencies candidly without commercial pressure from designers or builders. The CxA observes and documents contractor testing but does not direct construction means and methods.

  47. Question 47Maintenance and Commissioning

    The Owner's Project Requirements (OPR) developed at the start of a commissioning project primarily does which of the following?

    1. States the owner's measurable performance, occupancy and operating goals Correct answer.
    2. Serves as the contractor's means-and-methods plan for installing the systems
    3. Substitutes for the construction drawings and project specifications
    4. Serves as the contractor's schedule of pay applications and retainage

    Explanation

    The OPR documents what the owner needs the facility to do: measurable performance targets, occupancy schedules, redundancy, and operating constraints. Design and commissioning verification are then judged against those stated goals. It does not replace contract documents.

  48. Question 48Maintenance and Commissioning

    Functional performance testing of an air handling unit should demonstrate correct response under which set of conditions?

    1. Normal operation, staging, safeties, alarms and representative part loads Correct answer.
    2. Only with all VAV terminal boxes fully open and the fan at full speed
    3. Only at design full-load conditions with all terminal boxes at maximum
    4. Only with the building unoccupied and the controls in unoccupied mode

    Explanation

    Functional testing verifies interactive system behavior across its operating range, including staging transitions, safeties, alarms, and part-load sequences. Testing only at one condition leaves control logic unverified. Deferred or seasonal testing is used when a condition cannot be created at turnover.

  49. Question 49Maintenance and Commissioning

    An older office building has no reported operating problems, but the owner wants low-cost efficiency gains without major capital work. Which approach fits best?

    1. Commissioning of new construction against the contract documents
    2. Retro-commissioning, which tunes existing systems without major capital work Correct answer.
    3. Replacement of the entire HVAC system under a design-build contract
    4. A code-compliance review limited to envelope and lighting requirements

    Explanation

    Retro-commissioning applies a systematic investigation and tune-up process to existing systems and controls to restore performance toward intended design. It typically produces operational and energy savings at low cost. Major equipment replacement and new-construction commissioning address different situations.

  50. Question 50Maintenance and Commissioning

    Monitoring-based commissioning (MBCx) is characterized by which of the following?

    1. Ongoing analysis of trend data to detect faults Correct answer.
    2. Visual inspection of equipment nameplates and labels
    3. A single test performed only at project turnover
    4. Verification based only on monthly utility bills

    Explanation

    MBCx uses permanent metering and building automation trend data with analytics to detect performance faults continuously over time. It converts commissioning from a one-time event into a persistent process. Utility bills alone are too coarse and too delayed to locate faults.

  51. Question 51Maintenance and Commissioning

    Trend data show that on a mild day with outdoor air far cooler than return air, the economizer damper stays at minimum while the cooling coil valve is wide open. What is the most likely cause?

    1. The chiller is oversized for the connected building load
    2. The supply fan is rotating backwards, reducing airflow
    3. Economizer enable logic or the damper actuator is failing Correct answer.
    4. The return air temperature sensor is reading higher than actual

    Explanation

    When outdoor air conditions permit free cooling, the economizer should modulate open and mechanical cooling should stage down or off. A damper pinned at minimum while the coil valve is active points to a failed enable command, changeover sensor, or actuator. This is one of the most common faults found in retro-commissioning.

  52. Question 52Maintenance and Commissioning

    A chiller's condensing approach has risen steadily over two cooling seasons at similar load and similar entering condenser water temperature. What is the most likely cause and the appropriate maintenance action?

    1. Refrigerant overcharge; recover refrigerant until subcooling returns to design
    2. Failed compressor unloaders; remove and overhaul the compressor
    3. Low evaporator load; reduce the chilled water flow through the evaporator
    4. Fouled condenser tubes; clean the tubes and verify water treatment Correct answer.

    Explanation

    Condensing approach, the difference between condensing temperature and leaving condenser water temperature, measures condenser heat transfer. A gradual rise at comparable load and water temperature indicates scale, fouling, or tube deposits. Mechanical cleaning followed by corrected water treatment restores the approach.

  53. Question 53Maintenance and Commissioning

    A cooling tower rated for a 7 F approach at design flow measures 12 F approach at design flow with correct fan operation and clean fill. Which conclusion is most defensible?

    1. Raising condenser water flow will always reduce approach and restore the rating
    2. Tower performance is degraded; investigate distribution, fill and airflow Correct answer.
    3. The tower exceeds its rating, since a higher approach means more cooling
    4. Approach reflects chiller performance, not the tower, so no action is needed

    Explanation

    Approach is leaving water temperature minus entering air wet-bulb temperature and is the standard measure of tower capability at a given flow and wet bulb. A larger-than-rated approach at design conditions means less heat transfer, so water distribution, nozzles, fill condition, and airflow should be examined. Raising flow generally increases approach rather than reducing it.

  54. Question 54Maintenance and Commissioning

    A hot water boiler's stack temperature rises substantially at the same firing rate while combustion-test efficiency falls. What is the most likely cause?

    1. A leaking air separator on the hot water loop
    2. Fouled fireside or waterside surfaces reducing heat extraction Correct answer.
    3. A decrease in the excess combustion air supplied to the burner
    4. A lower return water temperature entering the boiler

    Explanation

    Stack temperature reflects how much heat the flue gas still carries after passing the heat transfer surfaces. Soot on the fireside or scale on the waterside reduces heat extraction, raising stack temperature and lowering efficiency at the same firing rate. Lower return water temperature would reduce, not raise, stack temperature.

  55. Question 55Maintenance and Commissioning

    During testing, adjusting and balancing of an air system, the balancing contractor adjusts which of the following to achieve design airflows?

    1. Supply air temperature at each diffuser while the system runs at full load
    2. Damper positions, fan speed and branch volume dampers Correct answer.
    3. Calibration accuracy of each VAV terminal box airflow sensor
    4. Fan motor current draw compared with the nameplate full-load amps

    Explanation

    Air balancing adjusts the distribution hardware: fan speed through sheave changes or VFD settings, main and branch volume dampers, and terminal settings, until measured flows match design within tolerance. Refrigerant charge and electrical measurements are outside the balancing scope.

  56. Question 56Maintenance and Commissioning

    Duct leakage testing of a new air distribution system is performed primarily to do which of the following?

    1. Compare fan motor current draw with the nameplate full-load amps
    2. Quantify air lost through joints and seams so the system can be sealed Correct answer.
    3. Measure supply air temperature at each diffuser while the system runs at full load
    4. Check the calibration accuracy of each VAV terminal box airflow sensor

    Explanation

    A duct leakage test pressurizes a duct section and measures the airflow required to hold the test pressure, expressed as a fraction of design flow. The result shows whether leakage limits are met and drives sealing of joints, seams, and connections. It does not evaluate temperature or terminal calibration.

  57. Question 57Maintenance and Commissioning

    For a V-belt driven supply fan, which maintenance practice is appropriate?

    1. Check sheave alignment and tension, and replace belts in matched sets Correct answer.
    2. Tension the belt to the maximum to eliminate any possibility of slip
    3. Apply belt dressing to a glazed belt as a permanent cure for slip
    4. Mix new and worn belts on the same multiple-belt drive to save cost

    Explanation

    Misalignment and incorrect tension are the main causes of premature belt and bearing failure, and matched sets share load evenly across a multiple-belt drive. Overtensioning overloads fan and motor bearings. Belt dressing masks slip without correcting the underlying cause.

  58. Question 58Maintenance and Commissioning

    A technician greases an electric motor's bearings every month, and the bearings fail prematurely with grease being forced out past the seals. What is the most likely explanation?

    1. The grease color does not match the color specified by the motor vendor
    2. Monthly greasing is a universal requirement of all motor manufacturers
    3. Over-lubrication raises bearing temperature and pressure, damaging seals Correct answer.
    4. Motor bearings should never be lubricated after initial installation

    Explanation

    Excess grease churns in the bearing, raising temperature and internal pressure that can push past seals and admit contaminants. Lubricant quantity and interval should follow the manufacturer's recommendations and the actual duty cycle. More frequent greasing is not automatically better.

  59. Question 59Maintenance and Commissioning

    An energy services company installs a VFD on a chilled water pump and claims savings using whole-facility utility bill data with a baseline adjusted for weather and operating changes. Which IPMVP option does this describe?

    1. Option B, retrofit isolation with continuously measured key parameters
    2. Option D, calibrated simulation of the whole building
    3. Option C, whole-facility measurement using utility meter data Correct answer.
    4. Option A, retrofit isolation with measured capacity and stipulated operation

    Explanation

    Option C evaluates savings from whole-building utility meter data with a baseline model adjusted for independent variables such as weather and occupancy. It is appropriate when the measure's effect is expected to be visible at the whole-facility level. Options A and B isolate the measure's own metered performance instead.

  60. Question 60Maintenance and Commissioning

    A commissioning project reaches substantial completion in December, and the chiller plant's full-load sequence cannot be demonstrated in winter conditions. What is the appropriate action?

    1. Delete the test from the commissioning plan so the schedule is not delayed
    2. Substitute a review of the manufacturer's literature for the field test
    3. Defer the test to suitable weather and track it as an open issue Correct answer.
    4. Close the commissioning report and assume the sequence will work as programmed

    Explanation

    Tests that cannot be run at turnover because of weather or load are deferred to the warranty or seasonal testing period and completed when conditions allow. They remain open items in the commissioning issues log until resolved and documented. Waiving the test leaves an unverified sequence in a critical plant.

  61. Question 61Energy Audits and Instrumentation

    A Level 1 ASHRAE energy audit primarily consists of which activity?

    1. Calibrated whole-building energy simulation
    2. Detailed sub-metered end-use measurements
    3. Investment-grade measurement and verification
    4. A walk-through survey and bill review Correct answer.

    Explanation

    The Level 1 audit is a screening effort: a brief walk-through of the facility combined with a review of utility bills, producing a preliminary energy use index and a list of low- or no-cost measures. Measurement, simulation, and rigorous verification are added in later audit levels.

  62. Question 62Energy Audits and Instrumentation

    Energy use intensity (EUI) is normally expressed in which units?

    1. Kilowatts per ton of refrigeration capacity
    2. Therms per heating degree-day per year
    3. Kilowatt-hours per building occupant per year
    4. Btu per square foot per year Correct answer.

    Explanation

    EUI divides annual site energy consumption by the conditioned floor area, so it is reported as energy per unit area per year, commonly Btu/ft²·yr or kWh/m²·yr. This normalization allows buildings of different sizes to be benchmarked against one another.

  63. Question 63Energy Audits and Instrumentation

    Electrical power factor is defined as which ratio?

    1. Real power divided by apparent power Correct answer.
    2. Reactive power divided by real power
    3. Apparent power divided by real power
    4. Real power divided by reactive power

    Explanation

    Power factor equals kW divided by kVA, or the cosine of the phase angle between voltage and current. It approaches unity for resistive loads and falls as inductive reactive load increases.

  64. Question 64Energy Audits and Instrumentation

    A pitot tube inserted in an air duct measures which quantity directly?

    1. Static pressure difference across the fan
    2. Wet-bulb temperature of the airstream
    3. Volumetric airflow rate in cubic feet per minute
    4. Velocity pressure, from which velocity is found Correct answer.

    Explanation

    A pitot tube senses the difference between total and static pressure, which is velocity pressure. Velocity is then obtained from V = 1096 times the square root of velocity pressure divided by air density, and multiplied by duct area to get flow.

  65. Question 65Energy Audits and Instrumentation

    An infrared thermometer is most appropriate for which survey task?

    1. Measuring current in a motor feeder
    2. Measuring surface temperature without contact Correct answer.
    3. Measuring duct air velocity at a supply grille
    4. Measuring the flue gas oxygen concentration

    Explanation

    Infrared instruments infer temperature from emitted radiation, allowing fast non-contact readings of surfaces such as steam lines, bearings, and electrical panels. They indicate surface temperature only and cannot read gas composition, airflow, or current.

  66. Question 66Energy Audits and Instrumentation

    Illuminance levels in an occupied space are measured with which instrument?

    1. A hygrometer
    2. A lux meter Correct answer.
    3. An anemometer
    4. A wattmeter

    Explanation

    Illuminance, expressed in lux or footcandles, is measured with a photocell-type light meter held at the work plane. Readings are taken after lamps have stabilized and are compared with the design target for the task.

  67. Question 67Energy Audits and Instrumentation

    In the two-wattmeter method for a three-phase, three-wire circuit, total real power equals which of the following?

    1. The sum of the two wattmeter readings Correct answer.
    2. The difference of the two wattmeter readings
    3. The square root of three times one reading
    4. Twice the average of the two readings

    Explanation

    With the two-wattmeter connection, total three-phase real power is the algebraic sum W1 + W2 for any load, balanced or not. For a balanced load the ratio of the readings additionally indicates the power factor.

  68. Question 68Energy Audits and Instrumentation

    A balometer (air flow hood) is used during an energy audit for which purpose?

    1. Measuring airflow at a ceiling diffuser Correct answer.
    2. Measuring the flue gas temperature in a stack
    3. Measuring the pressure drop across a filter bank
    4. Measuring the refrigerant charge in a chiller

    Explanation

    The flow hood covers the diffuser face and averages the air passing through a calibrated grid, giving a direct cfm or L/s reading per outlet. Summing outlet readings provides the zone or air-handler airflow used to check fan energy and ventilation rates.

  69. Question 69Energy Audits and Instrumentation

    Which instrument is best suited for locating individual compressed-air leaks in a plant?

    1. An infrared pyrometer aimed at the piping
    2. An ultrasonic leak detector Correct answer.
    3. A vane anemometer held near the pipe joints
    4. A clamp-on power meter on the compressor feeder

    Explanation

    Air escaping through a small orifice generates broadband ultrasound that an ultrasonic detector can sense directionally and isolate even in noisy plants. Power and temperature readings can reveal that leakage exists but cannot pinpoint it.

  70. Question 70Energy Audits and Instrumentation

    A combustion analyzer shows 8% oxygen in the flue gas of a natural-gas boiler that previously read 3%. Which conclusion is most consistent with this change?

    1. The boiler now produces more steam per unit of fuel
    2. Excess air decreased and the flame became richer
    3. Excess air increased and stack loss rose Correct answer.
    4. Carbon monoxide in the stack has fallen to zero

    Explanation

    Flue oxygen increases only when more air is supplied than the stoichiometric requirement. The additional excess air raises the mass of gas leaving the stack and the associated sensible loss, reducing combustion efficiency.

  71. Question 71Energy Audits and Instrumentation

    Compared with a thermocouple, an RTD used for HVAC temperature measurement is generally which of the following?

    1. Usable over a much wider temperature range
    2. More accurate and more stable over time Correct answer.
    3. Unaffected by lead-wire resistance errors
    4. Faster responding and less expensive to install

    Explanation

    An RTD uses a metallic element, usually platinum, whose resistance changes in a highly repeatable way, giving better accuracy and long-term drift than a thermocouple. The trade-offs are higher cost, slower response, and a narrower usable range.

  72. Question 72Energy Audits and Instrumentation

    Heating and cooling degree-days are used in an energy audit primarily to do which of the following?

    1. Determine the combustion air needed by a boiler
    2. Normalize energy use for weather between years Correct answer.
    3. Estimate the thermal resistance of a wall assembly
    4. Convert electrical demand into energy consumption

    Explanation

    Degree-days quantify how far the mean daily outdoor temperature departs from a reference balance point, forming an independent variable for weather normalization. Comparing consumption per degree-day removes much of the year-to-year variation caused by weather.

  73. Question 73Energy Audits and Instrumentation

    Which device measures liquid flow in an existing pipe without penetrating it?

    1. Positive displacement meter
    2. Insertion turbine flow meter
    3. Clamp-on ultrasonic flow meter Correct answer.
    4. Orifice plate with differential transmitter

    Explanation

    A clamp-on ultrasonic meter straps transducers to the outside of the pipe and times signals travelling with and against the flow, leaving the system undisturbed. This makes it a common choice for short-term audit measurements on chilled and hot water lines.

  74. Question 74Energy Audits and Instrumentation

    Under IPMVP, a regression model built from 12 months of utility bills and weather data serves which purpose?

    1. Verifying individual motor efficiency at part load
    2. Estimating the installed cost of retrofit measures
    3. Sizing transformers for a new service entrance
    4. Establishing a weather-adjusted baseline Correct answer.

    Explanation

    Whole-facility metering builds a baseline model relating energy use to independent variables such as degree-days or production. Post-installation energy use is adjusted with that model so savings are not distorted by weather or activity changes.

  75. Question 75Energy Audits and Instrumentation

    A utility demand charge is normally based on the maximum average kW measured over which period?

    1. A full billing month of consumption
    2. A single instantaneous peak reading
    3. A one-second sampling scan
    4. A 15-minute demand interval Correct answer.

    Explanation

    Demand is billed as an integrated average over short, repeated intervals, most commonly 15 or 30 minutes. Short spikes are averaged down, so reducing sustained load during the interval that sets the monthly peak is what lowers the charge.

  76. Question 76Energy Audits and Instrumentation

    The small static pressures found in an air-handling system are most accurately measured with which instrument?

    1. An inclined liquid manometer Correct answer.
    2. A diaphragm pressure switch
    3. A bourdon-tube pressure gauge
    4. A mercury barometer

    Explanation

    Inclining the manometer leg lengthens the scale for a given pressure, so readings of a few tenths of an inch of water can be made accurately. Bourdon gauges and switches lack the resolution for such low duct pressures.

  77. Question 77Energy Audits and Instrumentation

    A three-phase motor draws 50 A at 480 V with a power factor of 0.85. What is the approximate real power input?

    1. 24.0 kW
    2. 41.6 kW
    3. 20.4 kW
    4. 35.3 kW Correct answer.

    Explanation

    For a balanced three-phase load, kW equals the square root of three times voltage times current times power factor. Here 1.732 x 480 x 50 x 0.85 divided by 1,000 gives approximately 35.3 kW.

  78. Question 78Energy Audits and Instrumentation

    With all production equipment shut off, a 100-hp air compressor runs loaded for 2 minutes and unloaded for 6 minutes, cycling continuously. What fraction of its capacity is being lost to leaks?

    1. 75%
    2. 12%
    3. 33%
    4. 25% Correct answer.

    Explanation

    During an unloaded-leak test, the loaded time represents air going only to leaks while the unloaded time represents the receiver refilling. The leak load is therefore loaded time divided by total cycle time, or 2/8 = 25% of capacity.

  79. Question 79Energy Audits and Instrumentation

    A facility carries a load of 500 kW at 0.80 lagging power factor. How much capacitor kilovolt-amperes reactive is needed to raise the power factor to 0.95?

    1. About 211 kVAR Correct answer.
    2. About 500 kVAR
    3. About 375 kVAR
    4. About 164 kVAR

    Explanation

    Required kVAR equals kW times the difference between the tangents of the initial and target phase angles. The tangent of 0.80 power factor is 0.750 and of 0.95 is 0.329, so 500 x 0.421 is about 211 kVAR.

  80. Question 80Energy Audits and Instrumentation

    A 4-pole, 60 Hz induction motor has a nameplate speed of 1750 rpm and a measured speed of 1758 rpm during the survey. Which value best approximates the motor load?

    1. About 84% Correct answer.
    2. About 120%
    3. About 96%
    4. About 50%

    Explanation

    Synchronous speed is 1800 rpm, so rated slip is 50 rpm and measured slip is 42 rpm. Load fraction is approximately the ratio of measured to rated slip, 42/50, or about 84%.

  81. Question 81CHP Systems and Renewable Energy

    What is the defining feature of a combined heat and power (CHP) system?

    1. It converts waste heat into electricity without any fuel input.
    2. It generates electricity only during periods of peak utility demand.
    3. It produces electricity and useful heat from one fuel input. Correct answer.
    4. It relies exclusively on renewable fuels such as biogas or biomass.

    Explanation

    CHP, or cogeneration, sequentially uses a fuel to generate electrical or mechanical power and then recovers the remaining thermal energy for heating, cooling, or process use. The efficiency advantage comes from using both energy outputs rather than discarding waste heat. CHP is not limited to renewable fuels and cannot create electricity from waste heat without an initial fuel input.

  82. Question 82CHP Systems and Renewable Energy

    Which of the following energy resources is classified as renewable?

    1. Wind Correct answer.
    2. Natural gas
    3. Coal
    4. Diesel fuel

    Explanation

    Renewable resources are replenished by natural processes on human timescales, including wind, solar, hydro, biomass, and geothermal. Fossil fuels such as natural gas, coal, and diesel are finite and are not renewable.

  83. Question 83CHP Systems and Renewable Energy

    A photovoltaic module generates electricity by which principle?

    1. Converting light directly into direct current. Correct answer.
    2. Turning a turbine with heated air.
    3. Using the temperature difference between two dissimilar metals.
    4. Concentrating sunlight to boil a working fluid.

    Explanation

    Photovoltaic cells use semiconductor junctions to convert incident light directly into direct-current electricity through the photovoltaic effect. The process has no moving parts and does not require a working fluid. The other options describe solar thermal or thermoelectric conversion.

  84. Question 84CHP Systems and Renewable Energy

    The power available in the wind is proportional to which relationship with wind speed?

    1. Proportional to the cube of wind speed. Correct answer.
    2. Inversely proportional to wind speed.
    3. Proportional to the square of wind speed.
    4. Directly proportional to wind speed.

    Explanation

    Wind power is given by P = 0.5 ρ A v^3, where ρ is air density, A is rotor swept area, and v is wind speed. Because power scales with the cube of velocity, a small increase in wind speed yields a large increase in available power.

  85. Question 85CHP Systems and Renewable Energy

    Capacity factor for a generating unit is defined as which ratio?

    1. Actual energy output divided by maximum possible output. Correct answer.
    2. Hours of operation divided by hours of downtime.
    3. Rated output divided by the peak site load.
    4. Fuel energy input divided by the net electrical energy output.

    Explanation

    Capacity factor compares actual generation over a period with the energy the unit would have produced at continuous rated output. It is a measure of utilization, not of thermodynamic efficiency. Wind farms often have capacity factors near 30–45%, while thermal plants can be higher.

  86. Question 86CHP Systems and Renewable Energy

    In a gas turbine CHP plant, what is the role of the heat recovery steam generator (HRSG)?

    1. It cools the combustion air before it enters the compressor.
    2. It converts steam directly into electricity without a turbine.
    3. It recovers exhaust heat to generate steam. Correct answer.
    4. It removes sulfur from the fuel gas.

    Explanation

    An HRSG transfers sensible heat from the gas turbine exhaust to water, producing steam for process heating, district heating, or a steam turbine. It is the key component that allows the plant to recover thermal energy that would otherwise be exhausted.

  87. Question 87CHP Systems and Renewable Energy

    The spark spread for a CHP plant is best described as which of the following?

    1. The electricity market price minus the fuel cost of generation. Correct answer.
    2. The difference between the thermal output and the electric output.
    3. The cost of connecting the plant to the utility distribution system.
    4. The ratio of fuel input to total energy output.

    Explanation

    Spark spread compares the revenue from selling a unit of electricity with the fuel cost of producing that unit, typically using the plant heat rate. A positive spark spread suggests that generation is economically attractive at current prices. It does not include capital or fixed operating costs.

  88. Question 88CHP Systems and Renewable Energy

    A CHP gas turbine has an electrical heat rate of 9,000 Btu/kWh. What is its approximate electrical efficiency?

    1. 32.0%
    2. 37.9% Correct answer.
    3. 42.0%
    4. 28.0%

    Explanation

    Electrical efficiency equals 3,412 Btu/kWh divided by the heat rate in Btu/kWh, because 3,412 Btu is equivalent to one kWh. Here, 3,412 / 9,000 = 0.379, or about 37.9%.

  89. Question 89CHP Systems and Renewable Energy

    In a trigeneration system, an absorption chiller is used primarily to do which of the following?

    1. Increase the electrical output of the generator.
    2. Remove moisture from the fuel gas.
    3. Produce chilled water using thermal energy. Correct answer.
    4. Store thermal energy for later use.

    Explanation

    Absorption chillers use heat-such as steam, hot water, or exhaust-to drive a refrigeration cycle instead of a mechanical compressor. This allows a CHP plant to supply cooling in summer and reduces electric demand for conventional chillers.

  90. Question 90CHP Systems and Renewable Energy

    Net metering allows a customer-generator to do which of the following?

    1. Avoid all interconnection and safety requirements.
    2. Operate in island mode during a utility outage without additional equipment.
    3. Sell electricity to the utility at a guaranteed above-market tariff.
    4. Offset grid consumption with electricity exported to the grid. Correct answer.

    Explanation

    Net metering credits a customer's exported generation against electricity consumed from the grid, usually at the retail rate. It is distinct from a feed-in tariff, which pays a specified price for all generation. Grid-tied systems still require approved interconnection and anti-islanding protection.

  91. Question 91CHP Systems and Renewable Energy

    A renewable portfolio standard (RPS) typically requires which of the following?

    1. Customers to pay a fixed carbon tax on fossil fuel use.
    2. Utilities to install a fixed number of solar panels on every customer's roof.
    3. Suppliers to source a minimum share of sales from renewables. Correct answer.
    4. Generators to use only renewable fuels at all times.

    Explanation

    An RPS sets a minimum percentage or quantity of retail electricity sales that must come from qualifying renewable resources. Compliance is often demonstrated with renewable energy certificates. It does not mandate rooftop installations or require every generator to use only renewables.

  92. Question 92CHP Systems and Renewable Energy

    A 300 W photovoltaic module receives an average of 5 peak sun hours per day. Ignoring losses, what is its approximate daily energy production?

    1. 60 kWh
    2. 0.6 kWh
    3. 6.0 kWh
    4. 1.5 kWh Correct answer.

    Explanation

    Daily energy equals rated power times peak sun hours: 300 W × 5 h = 1,500 Wh, or 1.5 kWh. Peak sun hours represent an equivalent period of 1,000 W/m² irradiance.

  93. Question 93CHP Systems and Renewable Energy

    A 2 MW wind turbine operates at a 35% capacity factor. What is its approximate annual electricity production?

    1. 700 MWh
    2. 6,130 MWh Correct answer.
    3. 17,520 MWh
    4. 2,450 MWh

    Explanation

    Annual energy equals rated power × 8,760 hours × capacity factor: 2 MW × 8,760 h × 0.35 ≈ 6,132 MWh. Rounding gives about 6,130 MWh.

  94. Question 94CHP Systems and Renewable Energy

    Landfill gas used in a CHP engine consists primarily of which two components?

    1. Hydrogen and oxygen
    2. Methane and carbon dioxide Correct answer.
    3. Nitrogen and sulfur dioxide
    4. Propane and water vapor

    Explanation

    Landfill gas is produced by anaerobic decomposition and is typically about 50–60% methane and 40–50% carbon dioxide, with trace contaminants. The methane content makes it suitable for use in reciprocating engines or boilers after treatment.

  95. Question 95CHP Systems and Renewable Energy

    Compared with a conventional separate system, a trigeneration (CCHP) system adds which capability?

    1. Production of hydrogen through electrolysis using surplus electricity.
    2. Storage of electricity in batteries for grid balancing.
    3. Conversion of electricity into light without heat.
    4. Simultaneous electricity, heating, and cooling from one fuel source. Correct answer.

    Explanation

    Trigeneration, or combined cooling, heating, and power, extends CHP by using recovered heat in an absorption chiller to provide cooling. It therefore delivers electricity, heating, and cooling from a single fuel input. This can raise overall fuel utilization and reduce peak electric demand.

  96. Question 96CHP Systems and Renewable Energy

    A renewable energy certificate (REC) typically represents which of the following?

    1. A government loan guarantee for a renewable project.
    2. The physical electricity delivered to a specific retail customer.
    3. One ton of avoided carbon dioxide emissions.
    4. The renewable attributes of one megawatt-hour of electricity. Correct answer.

    Explanation

    A REC is a tradable instrument representing the environmental and other non-power attributes of one megawatt-hour of renewable generation. RECs can be sold together with or separately from the underlying electricity. They are used for RPS compliance and voluntary green-power claims.

  97. Question 97CHP Systems and Renewable Energy

    A facility has a base thermal load of 10 MMBtu/h and a peak thermal load of 25 MMBtu/h. A CHP system sized to the base thermal load is likely to do which of the following?

    1. Eliminate the need for any supplemental boiler capacity.
    2. Operate at high utilization but need peaking heat. Correct answer.
    3. Export large amounts of electricity to the grid at all times.
    4. Cycle frequently and achieve low annual efficiency.

    Explanation

    Sizing CHP to the base thermal load keeps the unit operating at high hours and high overall efficiency, because the recovered heat is almost always usable. Thermal peaks above the CHP capacity must be met with supplemental boilers, thermal storage, or load shedding. Sizing to peak thermal load instead would leave the unit underutilized most of the year.

  98. Question 98CHP Systems and Renewable Energy

    When a CHP generator is paralleled with the utility grid, which protection function is essential to prevent islanding?

    1. A manual transfer switch operated by the utility company.
    2. Anti-islanding protection that trips on utility loss. Correct answer.
    3. Power factor correction capacitors.
    4. A surge arrester on the service transformer.

    Explanation

    Anti-islanding protection detects loss of the utility source and disconnects the generator so it cannot energize an isolated section of the grid. This protects line workers and equipment and is a core requirement of interconnection standards such as IEEE 1547. Manual switching alone is not considered adequate for grid-parallel generation.

  99. Question 99CHP Systems and Renewable Energy

    According to the Betz limit, what is the maximum theoretical fraction of wind kinetic energy that a wind turbine can extract?

    1. 100%
    2. 59.3% Correct answer.
    3. 33.3%
    4. 75%

    Explanation

    The Betz limit arises from conservation of mass and momentum in an ideal actuator disk and equals 16/27, or about 59.3% of the kinetic energy in the wind. Practical turbines extract less because of aerodynamic and mechanical losses. No turbine can extract 100% because the exiting air must retain some velocity.

  100. Question 100CHP Systems and Renewable Energy

    The levelized cost of energy (LCOE) for a renewable project is calculated as which ratio?

    1. Installed capital cost divided by rated capacity.
    2. Total annual operating hours divided by project life.
    3. Lifetime costs divided by lifetime energy, both discounted. Correct answer.
    4. Annual fuel cost divided by annual electricity sales revenue.

    Explanation

    LCOE divides the present value of all lifetime costs-capital, fuel, and operations-by the present value of lifetime electricity production. It allows comparison of technologies with different capital and operating profiles on a per-unit-energy basis. It is not a simple capital-cost-per-kilowatt metric.

  101. Question 101HVAC Systems

    According to the fan affinity laws, at constant air density the shaft power of a centrifugal fan varies with fan speed in which way?

    1. To the fourth power
    2. Linear
    3. Cubed Correct answer.
    4. Squared

    Explanation

    The affinity laws state that airflow varies linearly with speed, static pressure varies with the square of speed, and shaft power varies with the cube of speed. This cubic relationship is the reason reducing fan speed is such a powerful energy-saving measure.

  102. Question 102HVAC Systems

    Cooling tower approach is defined as the difference between the leaving condenser water temperature and which other temperature?

    1. The ambient dry-bulb temperature
    2. The entering condenser water temperature
    3. The condenser water range
    4. The entering air wet-bulb temperature Correct answer.

    Explanation

    Approach is the gap between the cold water leaving the tower and the entering air wet-bulb, which is the thermodynamic limit for evaporative cooling. A small approach indicates an effective tower with adequate airflow and fill.

  103. Question 103HVAC Systems

    An air-side economizer reduces mechanical cooling energy by taking which action?

    1. Using outdoor air for free cooling Correct answer.
    2. Recovering heat from condenser water
    3. Reducing supply airflow at part load
    4. Preheating outdoor air with exhaust air

    Explanation

    When outdoor air is cool or low in enthalpy relative to return air, the economizer dampers admit more outdoor air and reduce or stop mechanical cooling. This is often called free cooling, although fan and damper energy still apply.

  104. Question 104HVAC Systems

    In a natural-gas-fired steam boiler, the economizer section performs which function?

    1. It removes dissolved solids from the water
    2. It reduces excess air in the burner
    3. It recovers blowdown heat to make flash steam
    4. It preheats feedwater using flue gas heat Correct answer.

    Explanation

    A boiler economizer transfers sensible heat from the leaving flue gas to the incoming feedwater, lowering stack temperature and raising overall boiler efficiency. Each 40 degrees F of stack temperature reduction typically improves efficiency by roughly one percentage point.

  105. Question 105HVAC Systems

    Compared with a constant-air-volume system, a VAV system saves fan energy primarily by taking which action?

    1. Reducing supply airflow as loads fall Correct answer.
    2. Increasing the outdoor air fraction
    3. Lowering supply air temperature at part load
    4. Cycling the supply fan on and off

    Explanation

    VAV boxes throttle airflow as space loads decrease, so the supply fan moves less air at part load. Because fan power follows the cube of airflow, even modest airflow reductions yield large savings.

  106. Question 106HVAC Systems

    In a vapor-compression refrigeration cycle, the compressor performs which function?

    1. Meters refrigerant into the evaporator
    2. Removes moisture from the refrigerant
    3. Rejects heat to the condenser
    4. Raises refrigerant pressure Correct answer.

    Explanation

    The compressor takes low-pressure vapor from the evaporator and raises its pressure and temperature so that heat can be rejected in the condenser. The pressure lift it creates is the main determinant of compressor power.

  107. Question 107HVAC Systems

    A chiller is rated at 0.60 kW per ton of cooling. What is its approximate COP?

    1. 3.5
    2. 4.7
    3. 7.0
    4. 5.9 Correct answer.

    Explanation

    COP equals 3.517 divided by the power input in kW per ton, because one ton of cooling equals 3.517 kW of thermal output. Dividing 3.517 by 0.60 gives about 5.86, or roughly 5.9.

  108. Question 108HVAC Systems

    A cooling tower receives condenser water at 95 degrees F and discharges it at 85 degrees F while the entering air wet-bulb is 78 degrees F. What is the tower approach?

    1. 3 degrees F
    2. 17 degrees F
    3. 10 degrees F
    4. 7 degrees F Correct answer.

    Explanation

    Approach is the leaving water temperature minus the entering air wet-bulb, so 85 minus 78 equals 7 degrees F. The range, which is entering water minus leaving water, is 10 degrees F for this tower.

  109. Question 109HVAC Systems

    A variable-speed supply fan is slowed so that it delivers 80 percent of design airflow against the same system. Fan power drops by approximately which amount?

    1. About 20%
    2. About 80%
    3. About 50% Correct answer.
    4. About 36%

    Explanation

    Fan power scales with the cube of speed, so 0.8 cubed equals 0.512, meaning power falls to about 51 percent of design. That equals a reduction of roughly 49 percent, which rounds to about 50 percent.

  110. Question 110HVAC Systems

    A differential enthalpy economizer high-limit control permits free cooling only under which condition?

    1. Outdoor enthalpy is below the design coil enthalpy
    2. Outdoor wet-bulb is below the tower approach
    3. Outdoor enthalpy is below return air enthalpy Correct answer.
    4. Outdoor dry-bulb is below the return air dry-bulb

    Explanation

    Differential enthalpy control compares the total heat content of outdoor air with that of the return air and enables the economizer only when outdoor enthalpy is lower. Because enthalpy includes moisture, it avoids admitting humid air that would raise latent cooling loads.

  111. Question 111HVAC Systems

    Resetting chilled water supply temperature upward at part load saves chiller energy but typically causes which offsetting effect?

    1. Reduces condenser water flow requirements
    2. Increases the cooling tower approach
    3. Raises supply fan and coil energy use Correct answer.
    4. Lowers space relative humidity

    Explanation

    Warmer chilled water reduces compressor lift and chiller power, but coils then need more airflow or more coil surface to meet the same sensible load, raising fan energy and possibly pump energy. The optimum reset point balances plant savings against air-side penalties.

  112. Question 112HVAC Systems

    Lowering the condenser water supply temperature entering a chiller generally produces which result?

    1. Reduces chiller capacity and increases power
    2. Reduces chiller power per ton of cooling Correct answer.
    3. Increases chiller power but improves tower performance
    4. Has no effect on chiller efficiency

    Explanation

    A colder condenser water supply reduces the condensing temperature and therefore the pressure lift the compressor must overcome. Lower lift means less compressor work per ton, although the tower fan energy needed to achieve it must also be considered.

  113. Question 113HVAC Systems

    A runaround coil heat recovery loop is most appropriate in which situation?

    1. Only latent recovery is required
    2. The two airstreams are adjacent and easily joined
    3. The exhaust air contains heavy grease
    4. Supply and exhaust ducts are far apart Correct answer.

    Explanation

    A runaround loop uses two finned coils connected by a pumped fluid loop, so it can transfer heat between airstreams that are physically separated. It is also chosen where cross-contamination between airstreams must be avoided.

  114. Question 114HVAC Systems

    In a VAV system, resetting the duct static pressure setpoint downward at part load saves energy for which reason?

    1. Fan speed and power are reduced Correct answer.
    2. The supply air temperature can be raised
    3. Outdoor air intake is reduced
    4. The minimum airflow setpoints increase

    Explanation

    When the static pressure setpoint is lowered, the supply fan does not need to run as fast to satisfy the boxes, and fan power drops with the cube of speed. The setpoint is typically reset until at least one VAV box damper is nearly fully open.

  115. Question 115HVAC Systems

    Surface blowdown on a steam boiler is normally regulated to hold which parameter within a specified limit?

    1. Boiler water conductivity Correct answer.
    2. Flue gas oxygen concentration
    3. Feedwater temperature
    4. Boiler water pH

    Explanation

    Conductivity tracks the concentration of dissolved solids in the boiler water, so continuous or automatic blowdown is controlled to keep conductivity below a set limit. Over-blowing wastes heated water and chemicals, while under-blowing risks carryover and scaling.

  116. Question 116HVAC Systems

    A steam trap serving a heating coil has failed in the fully open position. What is the most likely result?

    1. Reduce steam flow to the load
    2. Pass live steam and waste energy Correct answer.
    3. Back up condensate in the steam line
    4. Cause water hammer in the coil

    Explanation

    A trap stuck open cannot distinguish condensate from steam, so live steam escapes into the condensate return and is wasted. The visible symptom is often a hot return line and elevated condensate temperature, with lost flash steam energy.

  117. Question 117HVAC Systems

    A cooling coil has a bypass factor of 0.15 and an apparatus dew point of 50 degrees F. Air enters the coil at 78 degrees F dry-bulb. What is the approximate leaving dry-bulb temperature?

    1. 62 degrees F
    2. 50 degrees F
    3. 54 degrees F Correct answer.
    4. 46 degrees F

    Explanation

    Leaving dry-bulb equals the apparatus dew point plus the bypass factor times the difference between entering dry-bulb and apparatus dew point: 50 + 0.15 times 28 equals about 54 degrees F. The bypass factor represents the fraction of air that passes the coil untreated.

  118. Question 118HVAC Systems

    Flue gas from a natural-gas-fired boiler measures about 4 percent oxygen on a dry basis. The approximate excess air level is which of the following?

    1. About 40%
    2. About 5%
    3. About 20% Correct answer.
    4. About 60%

    Explanation

    For natural gas, roughly 3 percent oxygen corresponds to about 15 percent excess air and 5 percent oxygen to about 25 percent, so 4 percent oxygen is approximately 20 percent excess air. Excess air above the optimum raises stack losses and lowers boiler efficiency.

  119. Question 119HVAC Systems

    In a hot, humid climate, an air-side economizer with a fixed dry-bulb high limit rather than differential enthalpy control will tend to do which of the following?

    1. Prevent free cooling entirely in humid weather
    2. Admit humid air that raises latent loads Correct answer.
    3. Require a larger cooling tower
    4. Always save more energy than enthalpy control

    Explanation

    A dry-bulb limit permits free cooling whenever outdoor air is cooler than the setpoint, even if that air is humid and carries a high latent load. Enthalpy control avoids this by comparing total heat content, so in humid climates differential enthalpy usually saves more energy.

  120. Question 120HVAC Systems

    A chilled water plant suffering from low delta-T syndrome most typically exhibits which symptom?

    1. Excess pump flow and poor chiller loading Correct answer.
    2. Higher chiller efficiency at part load
    3. Reduced pump energy and full chiller loading
    4. Stable flow with colder return water

    Explanation

    When coils return water only slightly warmer than the supply, the plant must circulate more water to meet the same load, so pumps run near maximum and chillers stay lightly loaded. Common causes include three-way valves, coil fouling, and improper control valve sizing.

  121. Question 121Building Automation and Control Systems

    In a building automation system, which field device converts a physical condition such as temperature or pressure into a signal the controller can read?

    1. An actuator
    2. A damper
    3. A valve
    4. A sensor Correct answer.

    Explanation

    Sensors are input devices that measure a physical variable and send an electrical or digital signal to the controller. Actuators, dampers, and valves are output-side devices that act on the system rather than measure it.

  122. Question 122Building Automation and Control Systems

    Which open protocol was developed specifically to provide interoperability among building automation and control devices from multiple manufacturers?

    1. 4–20 mA current loop
    2. BACnet Correct answer.
    3. RS-232
    4. Modbus RTU

    Explanation

    BACnet is an open data communication protocol created for building automation and control networks. Modbus is a general industrial protocol, RS-232 is a physical serial interface, and 4–20 mA is an analog signaling method.

  123. Question 123Building Automation and Control Systems

    In a control loop, the setpoint is best described as which of the following?

    1. The target value to be maintained Correct answer.
    2. The output signal sent to the actuator
    3. The maximum allowable sensor reading
    4. The measured value of the controlled variable

    Explanation

    The setpoint is the desired value that the controller compares with the measured process variable. The measured value is the process variable, the actuator signal is the controller output, and the maximum reading relates to sensor range.

  124. Question 124Building Automation and Control Systems

    What is the main purpose of a deadband in a space temperature control sequence?

    1. To reset the setpoint to the outdoor air temperature
    2. To prevent short cycling of equipment Correct answer.
    3. To increase the sensor's effective measurement range
    4. To make the actuator respond faster to small changes

    Explanation

    A deadband creates a neutral zone in which the controller does not change its output for very small deviations from setpoint. This reduces unnecessary equipment cycling and can also help avoid simultaneous heating and cooling.

  125. Question 125Building Automation and Control Systems

    In a BAS time schedule, an 'occupied' period normally indicates which condition?

    1. The building is empty and all equipment is locked out
    2. The chiller plant must run at maximum capacity
    3. Normal use is expected and comfort setpoints are active Correct answer.
    4. Only life-safety systems are permitted to operate

    Explanation

    An occupied schedule period tells the BAS that the building is expected to be in normal use, so comfort and ventilation setpoints are applied. Unoccupied periods typically relax setpoints and shut down unnecessary equipment.

  126. Question 126Building Automation and Control Systems

    A ceiling-mounted occupancy sensor used in a lighting control sequence primarily does which of the following?

    1. Records the total electrical demand of the lighting panel
    2. Turns lights off when the space is unoccupied Correct answer.
    3. Measures the amount of daylight entering the space
    4. Adjusts lamp output in proportion to room temperature

    Explanation

    Occupancy sensors detect whether people are present and can switch or dim lighting accordingly. Daylight sensors measure illuminance, while power meters record electrical demand.

  127. Question 127Building Automation and Control Systems

    In a proportional-only controller, the output changes in direct proportion to which quantity?

    1. The rate of change of the error
    2. The current error from setpoint Correct answer.
    3. The integral of the error over time
    4. The length of time equipment has been running

    Explanation

    A proportional controller produces an output that is proportional to the instantaneous deviation between the measured variable and the setpoint. Integral action accumulates past error, and derivative action responds to the rate of change.

  128. Question 128Building Automation and Control Systems

    Which control action is responsible for eliminating a persistent offset between the measured variable and the setpoint in a PID loop?

    1. Deadband action
    2. Proportional action
    3. Integral action Correct answer.
    4. Derivative action

    Explanation

    Integral action accumulates the error over time and continues changing the output until the measured variable reaches the setpoint. Proportional action alone can leave a steady-state offset, and derivative action responds mainly to the rate of change.

  129. Question 129Building Automation and Control Systems

    An optimal-start routine in a BAS is intended to do which of the following?

    1. Reduce the ventilation rate during the first hour of occupancy
    2. Prevent any equipment from starting before the scheduled occupancy time
    3. Start all equipment at a fixed time every day regardless of conditions
    4. Reach setpoint as occupancy begins while minimizing early operation Correct answer.

    Explanation

    Optimal start calculates when to begin preheating or precooling so that zones reach setpoint near the start of occupancy. It uses zone conditions and outdoor conditions to avoid running equipment longer than necessary.

  130. Question 130Building Automation and Control Systems

    In a VAV air-handling system, a common energy-saving control strategy resets the supply-fan static pressure setpoint based on which input?

    1. Return-air relative humidity
    2. VAV damper position Correct answer.
    3. The outdoor air dew point
    4. The chiller compressor current

    Explanation

    Static pressure reset lowers the fan pressure setpoint when VAV dampers are mostly less than fully open. The setpoint is raised only as needed to keep at least one critical damper adequately open.

  131. Question 131Building Automation and Control Systems

    What is the primary function of an air-side economizer in an air-handling unit?

    1. To reduce outdoor air intake whenever the building is occupied
    2. To use cool outdoor air instead of mechanical cooling Correct answer.
    3. To recover heat from exhaust air with a heat wheel
    4. To maintain duct static pressure by modulating the return fan

    Explanation

    An air-side economizer uses outdoor air for free cooling when outdoor temperature or enthalpy is favorable. It reduces mechanical cooling energy by modulating dampers to increase outdoor airflow.

  132. Question 132Building Automation and Control Systems

    During unoccupied hours, a night setback strategy typically does which of the following?

    1. Runs the supply fan continuously to mix air
    2. Increases the minimum outdoor air intake to purge the building
    3. Lets space temperature drift within unoccupied limits Correct answer.
    4. Maintains occupied comfort setpoints around the clock

    Explanation

    Night setback relaxes heating and cooling setpoints during unoccupied periods so the HVAC system can operate less. The BAS then returns to occupied setpoints before the building is scheduled for use.

  133. Question 133Building Automation and Control Systems

    The main objective of chiller plant sequencing in a BAS is to do which of the following?

    1. Keep all chillers at their minimum load regardless of demand
    2. Run every available chiller at all times to maximize redundancy
    3. Start and stop chillers randomly to equalize wear without regard to load
    4. Match cooling load with efficient chiller staging Correct answer.

    Explanation

    Chiller sequencing stages and unstages chillers so the plant meets the cooling load with efficient operation and appropriate reserve capacity. Operating more chillers than necessary at light load usually reduces plant efficiency.

  134. Question 134Building Automation and Control Systems

    In a hot-water heating system, outdoor-air temperature reset typically does which of the following?

    1. Keeps the boiler water temperature fixed at design conditions year-round
    2. Raises the boiler water temperature as outdoor air gets warmer
    3. Lowers the boiler water temperature as outdoor air gets warmer Correct answer.
    4. Shuts off the boiler whenever outdoor air is below freezing

    Explanation

    Outdoor-air reset lowers the hot-water supply temperature as the outdoor temperature rises and heating load falls. This reduces distribution losses and boiler energy use while still meeting the load.

  135. Question 135Building Automation and Control Systems

    A daylight-harvesting lighting control sequence uses a photosensor primarily to do which of the following?

    1. Measure the power factor of the lighting circuit
    2. Dim or switch lights based on available daylight Correct answer.
    3. Control the space heating setpoint based on solar gain
    4. Detect occupancy in the space

    Explanation

    A photosensor measures illuminance and allows the lighting controller to reduce electric light output when sufficient daylight is present. Occupancy detection and power-factor measurement require different devices and control functions.

  136. Question 136Building Automation and Control Systems

    Why are trend logs from a BAS valuable for energy management?

    1. They replace the need for utility meters in all cases
    2. They supply historical data for diagnostics and verification Correct answer.
    3. They prevent network communication faults from occurring
    4. They automatically tune every control loop without human review

    Explanation

    Trend logs record point values over time and provide evidence of equipment operation, schedules, and control performance. They support fault diagnosis, commissioning, and measurement and verification, but they do not replace meters or automatically tune loops.

  137. Question 137Building Automation and Control Systems

    If the integral gain of a temperature control loop is set too high, what is the most likely result?

    1. Immediate actuator saturation with no possibility of recovery
    2. No response to changes in the measured temperature
    3. Overshoot and oscillation from overcorrecting accumulated error Correct answer.
    4. A permanent offset between measured temperature and setpoint

    Explanation

    High integral gain makes the controller accumulate and act on error very aggressively, which can drive overshoot and sustained oscillation. Integral action is intended to remove offset, but excessive gain destabilizes the loop.

  138. Question 138Building Automation and Control Systems

    An equal-percentage control valve is often selected for a heating coil because its characteristic does which of the following?

    1. Allows full flow immediately when the actuator begins to open
    2. Produces a linear change in flow for every percent of stem travel
    3. Maintains constant flow regardless of the control signal
    4. Gives small flow changes near closed and larger changes near open Correct answer.

    Explanation

    An equal-percentage valve changes flow by a constant percentage for each increment of stem travel, so flow changes are small near the closed position and larger near the open position. This characteristic often matches the nonlinear heat output of a coil.

  139. Question 139Building Automation and Control Systems

    A chilled-water supply temperature reset strategy raises the leaving chilled-water setpoint as cooling load decreases. What is the main intended benefit?

    1. It eliminates the need for a differential-pressure bypass
    2. It improves chiller efficiency while still meeting the load Correct answer.
    3. It reduces the cooling tower approach to zero
    4. It increases the chilled-water flow rate to improve heat transfer

    Explanation

    Higher chilled-water supply temperature can improve chiller efficiency as long as the terminals still meet the load. The strategy should be limited so that coils and dehumidification requirements remain satisfied.

  140. Question 140Building Automation and Control Systems

    In demand-controlled ventilation using space CO2 concentration, the outdoor-air damper is fully open but CO2 remains above setpoint. What is the most appropriate control interpretation?

    1. The system should lower the CO2 setpoint to reduce fan energy
    2. The space is unoccupied and ventilation can be reduced
    3. The CO2 sensor is certainly failed and should be ignored
    4. The ventilation system cannot meet current demand; investigate Correct answer.

    Explanation

    If the outdoor-air damper is already at maximum and CO2 remains high, the system may lack outdoor-air capacity, have a sensor problem, or be serving an unexpectedly high occupancy. The condition should be investigated rather than assumed safe or ignored.

  141. Question 141Thermal Energy Storage Systems

    The primary purpose of a thermal energy storage system in a commercial cooling plant is to:

    1. Increase the total refrigeration capacity that must be installed
    2. Eliminate the need for a condenser water loop
    3. Shift cooling production from on-peak to off-peak hours Correct answer.
    4. Raise the chilled-water supply temperature delivered to the coils

    Explanation

    Thermal storage decouples when cooling is produced from when it is used, so chillers run during low-cost off-peak hours and the stored cooling is discharged during expensive on-peak hours. It does not remove heat-rejection equipment, and it does not raise the supply temperature required at the coils.

  142. Question 142Thermal Energy Storage Systems

    In ice storage design, the latent heat of fusion of water is approximately:

    1. 144 Btu per pound Correct answer.
    2. 1 Btu per pound
    3. 970 Btu per pound
    4. 80 Btu per pound

    Explanation

    Melting one pound of ice absorbs about 144 Btu at 32°F, which is why an ice store holds far more cooling per pound than a sensible water tank. This latent term dominates the capacity calculation for ice-on-coil and encapsulated-ice systems.

  143. Question 143Thermal Energy Storage Systems

    In a naturally stratified chilled-water storage tank, the thermocline is best described as:

    1. The insulating layer applied to the outside of the tank shell
    2. The minimum water level that must be kept in the tank at all times
    3. The transition zone between warm upper and cold lower water Correct answer.
    4. The diffuser manifold that spreads flow across the tank floor

    Explanation

    Cold, dense water settles at the bottom of the tank while warm return water floats above it, and the thin gradient region between them is the thermocline. Keeping this zone thin and stable is what allows the tank to deliver cold water at a useful temperature throughout discharge.

  144. Question 144Thermal Energy Storage Systems

    For the same tank volume, an ice storage tank typically stores how much more cooling than a stratified chilled-water tank designed for a 20°F temperature difference?

    1. About six to eight times as much Correct answer.
    2. About the same amount
    3. About twenty times as much
    4. About twice as much

    Explanation

    Water cycled through 20°F holds roughly 165 Btu of sensible cooling per gallon, while an ice store holds about 1,100 Btu per gallon once the latent heat is counted. The ratio of these values is roughly six to eight, which is why ice tanks occupy far less space for the same capacity.

  145. Question 145Thermal Energy Storage Systems

    For a fixed tank volume and flow arrangement, the usable capacity of a chilled-water storage tank is increased most by:

    1. Raising the static pressure in the tank
    2. Widening the supply-to-return temperature difference Correct answer.
    3. Increasing the circulating flow rate through the tank
    4. Adding propylene glycol to the stored water

    Explanation

    Sensible capacity equals volume times density times specific heat times the temperature swing, so in a fixed tank the temperature difference is the term a designer can widen to gain capacity. Flow rate affects how fast the store is charged or discharged, not how much cooling it holds.

  146. Question 146Thermal Energy Storage Systems

    Which utility rate characteristic most directly makes thermal energy storage economically attractive?

    1. High on-peak demand charges plus a wide on-peak/off-peak price gap Correct answer.
    2. Off-peak energy priced higher than on-peak energy
    3. A declining-block energy charge that rewards higher consumption at each tier
    4. A flat energy charge with no separate demand charge on the bill

    Explanation

    Storage earns its return by moving electricity use out of expensive hours, so the rate must offer both a demand component worth avoiding and a meaningful energy price differential between periods. Without those two elements there is nothing for the storage to capture.

  147. Question 147Thermal Energy Storage Systems

    How much cooling is released when 2,000 lb of ice melt at 32°F?

    1. 33 ton-hours
    2. 48 ton-hours
    3. 24 ton-hours Correct answer.
    4. 12 ton-hours

    Explanation

    Multiplying 2,000 lb by 144 Btu per pound gives 288,000 Btu, and dividing by 12,000 Btu per ton-hour gives 24 ton-hours. Because melting occurs at nearly constant temperature, the latent heat term accounts for essentially all of this cooling.

  148. Question 148Thermal Energy Storage Systems

    A plant on storage-priority control serves an 800-ton peak load with a 500-ton chiller and a fully charged store. During the on-peak period it will:

    1. Run the chiller at full capacity and let the storage handle only the excess above 500 tons
    2. Discharge storage first and run the chiller only for the remainder Correct answer.
    3. Alternate hourly between chiller and storage to equalize their run time
    4. Keep the chiller off and let the storage carry the full 800-ton load

    Explanation

    Storage-priority control discharges the store as fast as the load allows and uses the chiller only to trim the balance, which maximizes demand reduction during expensive hours. Chiller-priority control works the other way, running the chiller fully and letting storage cover only the excess.

  149. Question 149Thermal Energy Storage Systems

    In a full-storage (load-shifting) design, the refrigeration plant is sized so that:

    1. It carries most of the on-peak load while the storage trims the peaks
    2. It recharges entirely off peak and is off, or nearly off, on peak Correct answer.
    3. It is sized for the design-day peak plus the simultaneous recharge load
    4. It runs continuously at the 24-hour average cooling load

    Explanation

    Full storage moves the entire on-peak load into the store, so the chiller is sized for the off-peak recharge window rather than the instantaneous peak. Partial storage, by contrast, keeps the chiller running through the peak and uses storage to shave the top of the load.

  150. Question 150Thermal Energy Storage Systems

    Charging an ice-on-coil store requires the chiller to make 22°F to 25°F glycol instead of 44°F chilled water. Compared with normal cooling duty, the chiller will:

    1. Deliver less capacity at a lower coefficient of performance Correct answer.
    2. Deliver the same capacity at a lower coefficient of performance
    3. Deliver the same capacity and the same coefficient of performance
    4. Deliver more capacity at a higher coefficient of performance

    Explanation

    A colder evaporator increases the temperature lift between evaporator and condenser, which reduces both refrigerating capacity and COP. This charging penalty is one reason storage systems are evaluated with a figure of merit below unity.

  151. Question 151Thermal Energy Storage Systems

    A facility has a 24-hour average cooling load of 400 tons and a design-day peak of 900 tons, and it uses partial (load-leveling) storage that runs the chillers at a constant rate. The chiller plant can be sized at approximately:

    1. 400 tons Correct answer.
    2. 1,300 tons
    3. 900 tons
    4. 250 tons

    Explanation

    With load leveling, the chillers run at the daily average and the store absorbs the difference between the average and the peak. Sizing at the average is one of the capital-cost advantages of partial storage.

  152. Question 152Thermal Energy Storage Systems

    A stratified chilled-water tank holds 150,000 gallons and is designed for a 16°F temperature swing. Its nominal capacity is approximately:

    1. 3,330 ton-hours
    2. 2,080 ton-hours
    3. 1,670 ton-hours Correct answer.
    4. 830 ton-hours

    Explanation

    Multiplying 150,000 gal by 8.33 lb/gal by 1.0 Btu/lb·°F by 16°F gives about 20.0 million Btu, which converts to roughly 1,670 ton-hours at 12,000 Btu per ton-hour. A wider 20°F swing would give the higher 2,080 ton-hour figure.

  153. Question 153Thermal Energy Storage Systems

    In an internal-melt ice-on-coil storage system, ice is melted during discharge by:

    1. Harvesting ice slabs that fall from refrigerated plates into the tank
    2. Circulating the tank water over the outside of a flooded coil assembly
    3. Warm glycol flowing inside the tubes, melting the ice from within Correct answer.
    4. Electric resistance heaters embedded in the tank walls

    Explanation

    In the internal-melt design, the same closed glycol circuit that built the ice is warmed by the building load and melts the ice from the tube surface outward. This keeps the refrigerant or glycol circuit sealed and separate from the tank water.

  154. Question 154Thermal Energy Storage Systems

    A phase-change material is being selected for a storage module that must deliver 44°F chilled water. The PCM melting point should be:

    1. A few degrees below 44°F so heat flows into the melting material Correct answer.
    2. Equal to the chiller condenser leaving-water temperature
    3. Well above 44°F, so the material freezes readily and discharges strongly
    4. Exactly equal to the 44°F supply temperature

    Explanation

    Heat transfer requires a temperature difference, so the PCM must melt below the water temperature it is chilling, typically by several degrees to keep the coil or heat exchanger compact. A melting point at or above the supply temperature provides no driving force for heat flow.

  155. Question 155Thermal Energy Storage Systems

    A 500-ton peak plant draws about 0.8 kW per ton at peak, and storage shifts the entire on-peak load off peak. If the billed demand charge is $18 per kW per month, the monthly demand-charge reduction, ignoring any ratchet, is approximately:

    1. $9,000
    2. $7,200 Correct answer.
    3. $4,000
    4. $2,400

    Explanation

    Multiplying 500 tons by 0.8 kW/ton gives 400 kW of avoided peak demand, and 400 kW times $18/kW equals $7,200 per month. A demand ratchet or a new nighttime peak would reduce the realized savings.

  156. Question 156Thermal Energy Storage Systems

    Nighttime charging of a cool storage system often improves chiller performance mainly because:

    1. The storage tank pre-cools condenser water before it reaches the cooling tower
    2. Chilled-water pumps can be operated at a higher speed during nighttime hours
    3. Cooler night wet-bulb temperatures lower condenser water temperature and raise COP Correct answer.
    4. Chilled-water return temperatures from the coils are lower during the night hours

    Explanation

    Chiller efficiency depends strongly on condenser temperature, and cooler, drier night air allows the tower to produce colder condenser water. This gain partly offsets the low-temperature penalty of making ice.

  157. Question 157Thermal Energy Storage Systems

    If the inlet velocity at a chilled-water storage tank diffuser is much higher than the design value, the most likely consequence is that:

    1. Tank insulation requirements are reduced because mixing equalizes water temperature
    2. Jet momentum mixes the tank and erodes the thermocline, cutting usable capacity Correct answer.
    3. Stratification improves noticeably because of the added turbulence at the inlet diffuser
    4. The tank discharges at a colder temperature for a longer period

    Explanation

    A stratified tank works only when buoyancy forces dominate inlet momentum, so diffusers are sized for low exit velocity. Excessive velocity produces a jet that stirs the stored water, thickening the thermocline and warming the supply late in the discharge.

  158. Question 158Thermal Energy Storage Systems

    A storage retrofit costs $600,000 and cuts demand and energy charges by $150,000 per year, but adds $30,000 per year in maintenance and pumping cost. The simple payback is:

    1. 5.0 years Correct answer.
    2. 2.5 years
    3. 4.0 years
    4. 20 years

    Explanation

    Simple payback uses net annual savings, here $150,000 minus $30,000 equals $120,000, so $600,000 divided by $120,000 gives 5.0 years. Ignoring the added operating cost would understate the payback at 4.0 years.

  159. Question 159Thermal Energy Storage Systems

    A cool storage system discharges 900 ton-hours on a design day. The charging chiller consumed 1,000 kWh of electricity at an average COP of 3.5, and 1 ton-hour equals 3.517 kWh. The figure of merit is approximately:

    1. 1.12
    2. 0.90 Correct answer.
    3. 0.75
    4. 0.63

    Explanation

    Charging with 1,000 kWh at a COP of 3.5 represents about 3,500 kWh, or roughly 995 ton-hours, of cooling. Dividing the 900 ton-hours delivered by about 995 ton-hours of charging cooling gives a figure of merit near 0.90, the shortfall reflecting tank heat gain, piping losses, and incomplete discharge.

  160. Question 160Thermal Energy Storage Systems

    Compared with an identical plant without storage, a well-designed partial-storage cool storage system typically:

    1. Slightly raises total kWh while lowering peak demand and cost Correct answer.
    2. Lowers both total site electricity use and peak demand simultaneously
    3. Lowers total electricity use while raising peak demand
    4. Has no effect on total electricity use but eliminates demand charges entirely

    Explanation

    Storage introduces a round-trip loss, additional pumping, and often a colder charging evaporator, so total site electricity use generally rises. The economic benefit comes from reducing on-peak demand and expensive on-peak energy consumption, not from reducing total energy.

  161. Question 161Lighting Systems

    A footcandle is defined as which of the following?

    1. One watt of radiant power delivered to one square foot of surface
    2. One candela of luminous intensity measured one foot from the source
    3. One lumen of luminous flux emitted per square foot of luminaire area
    4. One lumen of luminous flux incident on one square foot of surface Correct answer.

    Explanation

    Illuminance is luminous flux density on a surface. In inch-pound units one footcandle equals one lumen per square foot, while in SI units one lux equals one lumen per square meter. Dividing footcandles by 10.76 converts them to lux.

  162. Question 162Lighting Systems

    In the designation of a T8 fluorescent lamp, what does the number 8 indicate?

    1. A rated operating life of 8,000 hours before burnout
    2. Eight inches of arc length for each watt of input power
    3. An initial light output of 8,000 lumens for the lamp
    4. A lamp diameter of eight-eighths of an inch, or 1 inch Correct answer.

    Explanation

    The tubular lamp letter T is followed by the nominal tube diameter expressed in eighths of an inch. A T8 is therefore 8/8 in, or about 1 in (25 mm) in diameter, half the diameter of a T12 lamp. The smaller diameter improves optical control and often allows lower-wattage operation.

  163. Question 163Lighting Systems

    An occupancy sensor reduces lighting energy use primarily by doing which of the following?

    1. Raising the space temperature setpoint when the lights turn off
    2. Reducing lamp lumen output whenever the space is occupied
    3. Turning off or dimming lighting when no occupants are detected Correct answer.
    4. Shifting lighting load from on-peak to off-peak hours

    Explanation

    Occupancy and vacancy sensors detect the presence of people and switch or dim lighting off in unoccupied periods. Savings come from eliminating lighting in empty spaces rather than from reducing light while the space is in use. Typical savings depend on how intermittently the space is occupied.

  164. Question 164Lighting Systems

    Which of the following lamp types typically has the highest luminous efficacy?

    1. Standard incandescent
    2. Light-emitting diode Correct answer.
    3. Tungsten-halogen
    4. Mercury vapor

    Explanation

    Luminous efficacy is light output divided by input power in lumens per watt. Modern white LEDs commonly exceed 100 lm/W at the luminaire level, well above mercury vapor at roughly 35 to 60 lm/W and incandescent or halogen sources at roughly 10 to 25 lm/W.

  165. Question 165Lighting Systems

    The color rendering index of a light source describes which characteristic?

    1. The shift in color appearance of the source as the lamp ages
    2. The ratio of visible light to total radiant power emitted
    3. How faithfully colors are rendered relative to a reference source Correct answer.
    4. The correlated color temperature of the source, expressed in kelvin

    Explanation

    CRI compares the appearance of a set of test color samples under the lamp with their appearance under a reference source of similar color temperature. A value of 100 indicates rendering identical to the reference. CRI is independent of the lamp's own apparent color, which is described by correlated color temperature.

  166. Question 166Lighting Systems

    Which of the following lamp types contains mercury and therefore requires special disposal?

    1. Linear fluorescent Correct answer.
    2. Tungsten-halogen
    3. LED
    4. Incandescent

    Explanation

    Fluorescent and other arc-discharge lamps rely on mercury vapor to generate ultraviolet energy that the phosphor converts to visible light. Because of this mercury content they are regulated as universal waste and must be recycled rather than discarded in ordinary trash. Incandescent, halogen and LED products contain no mercury.

  167. Question 167Lighting Systems

    A 10,000 square foot office is lighted by 100 luminaires that each draw 64 W including ballast losses. What is the lighting power density?

    1. 0.06 W/ft²
    2. 0.64 W/ft² Correct answer.
    3. 0.32 W/ft²
    4. 1.56 W/ft²

    Explanation

    Lighting power density equals total connected lighting power divided by conditioned floor area. The connected load is 100 fixtures times 64 W, or 6,400 W, and 6,400 W divided by 10,000 ft² gives 0.64 W/ft². Ballast or driver losses must be included in the fixture wattage.

  168. Question 168Lighting Systems

    Using the space-by-space method, a designer must light 4,000 ft² of space for which the allowed lighting power density is 0.90 W/ft². What is the maximum connected lighting load permitted?

    1. 3,600 W Correct answer.
    2. 4,440 W
    3. 36,000 W
    4. 360 W

    Explanation

    The lighting power allowance is the permitted LPD multiplied by the area of the space. Here 0.90 W/ft² times 4,000 ft² equals 3,600 W of connected lighting load. Installed load must not exceed this allowance unless a documented trade-off or exception applies.

  169. Question 169Lighting Systems

    A point source has a luminous intensity of 2,500 candela. What illuminance does it produce on a surface located 2 m directly below the source?

    1. 5,000 lux
    2. 1,250 lux
    3. 313 lux
    4. 625 lux Correct answer.

    Explanation

    The inverse-square law gives illuminance as intensity divided by the square of the distance, E = I/d². With 2,500 cd and d equal to 2 m, the illuminance is 2,500/4, or 625 lux. The relationship holds for a point source striking the surface perpendicularly.

  170. Question 170Lighting Systems

    A four-lamp luminaire uses lamps rated 3,000 initial lumens each and a ballast with a ballast factor of 0.88. What is the initial light output of the luminaire?

    1. 2,640 lm
    2. 10,560 lm Correct answer.
    3. 12,000 lm
    4. 13,636 lm

    Explanation

    Ballast factor is the ratio of light output produced on a given ballast to the output produced on the reference ballast used for lamp rating. Multiply lamp lumens by the number of lamps and by the ballast factor: 4 × 3,000 × 0.88 = 10,560 lm.

  171. Question 171Lighting Systems

    Which control strategy most directly reduces electric lighting energy in a daylit perimeter zone?

    1. Power factor correction of the lighting panel
    2. Occupancy sensing in corridors without daylight
    3. Photosensor dimming of luminaires near windows Correct answer.
    4. Time-clock scheduling of all lighting in the building

    Explanation

    Daylight harvesting uses a photosensor to reduce or switch off electric lighting in proportion to the daylight reaching the space. The savings are concentrated in perimeter zones where daylight is available. Scheduling and occupancy sensing save energy but do not respond to daylight levels.

  172. Question 172Lighting Systems

    A lamp with a correlated color temperature of 5000 K is best described as which of the following?

    1. Amber, typical of low-pressure sodium lamps
    2. Cool to neutral white, good for detailed tasks Correct answer.
    3. Greenish, typical of mercury vapor lamps without phosphor
    4. Warm white, similar to incandescent lamps

    Explanation

    Correlated color temperature describes the apparent color of the light, with lower values appearing warm and higher values appearing cool. A 5000 K source falls in the cool-to-neutral range often used where visual acuity matters. CCT says nothing about how well colors are rendered, which is the role of CRI.

  173. Question 173Lighting Systems

    The lamp lumen depreciation factor used in lighting calculations accounts for which of the following?

    1. The reduction in light output caused by ballast operation
    2. Dirt accumulation on luminaire lenses and room surfaces
    3. The decline in lamp light output as lamps age Correct answer.
    4. Voltage sags that shorten lamp operating life

    Explanation

    Light loss factors separate the causes of output loss so each can be estimated. LLD represents the drop in lamp output between initial rating and the point at which lamps are replaced. Dirt is captured by luminaire and room surface dirt depreciation factors, and ballast performance by ballast factor.

  174. Question 174Lighting Systems

    In the lumen method of lighting design, the coefficient of utilization represents which of the following?

    1. The fraction of lamp lumens that reach the work plane Correct answer.
    2. The ratio of maintained illuminance to initial illuminance
    3. The rate at which luminaire light output declines with dirt
    4. The share of input power converted into visible light

    Explanation

    The coefficient of utilization is the proportion of lumens leaving the lamps that arrives on the work plane. It depends on luminaire photometrics, room dimensions expressed as the room cavity ratio, and surface reflectances. Values are taken from luminaire manufacturer tables.

  175. Question 175Lighting Systems

    A warehouse has 200 high-bay fixtures that each draw 400 W and operate 4,000 hours per year. Replacing them with 150 W LED fixtures would save how much energy annually?

    1. 320,000 kWh
    2. 2,000,000 kWh
    3. 20,000 kWh
    4. 200,000 kWh Correct answer.

    Explanation

    Each fixture saves 250 W, so 200 fixtures save 50 kW of demand. Multiplying by 4,000 operating hours gives 200,000 kWh per year. Energy savings equal the demand reduction times the hours the equipment would have run.

  176. Question 176Lighting Systems

    Continuous dimming of fluorescent lamps requires which type of ballast?

    1. An instant-start electronic ballast
    2. An HID constant-wattage ballast
    3. A magnetic ballast with a lag circuit
    4. A dimmable electronic ballast Correct answer.

    Explanation

    Dimming fluorescent systems need a ballast designed to vary lamp current in response to a control signal, such as 0-10 V or DALI. Standard magnetic and non-dimming electronic ballasts operate only at full output. HID ballasts serve a different lamp family and cannot run fluorescent lamps.

  177. Question 177Lighting Systems

    A 2,000 ft² room requires 50 footcandles on the work plane. Each luminaire delivers 4,000 lumens, the coefficient of utilization is 0.70, and the light loss factor is 0.80. How many luminaires are required?

    1. 56
    2. 36
    3. 32
    4. 45 Correct answer.

    Explanation

    The lumen method gives the number of luminaires as required illuminance times area, divided by lumens per luminaire times CU times light loss factor. Here 50 × 2,000 = 100,000, and 4,000 × 0.70 × 0.80 = 2,240, giving 44.6, which is rounded up to 45. Designs are always rounded up so the maintained illuminance target is met.

  178. Question 178Lighting Systems

    A 100-fixture retrofit reduces each fixture's input from 100 W to 40 W. Fixtures operate 3,000 hours per year, electricity costs $0.10/kWh, and the incremental retrofit cost is $5,400. What is the simple payback period?

    1. 0.3 years
    2. 3.0 years Correct answer.
    3. 6.0 years
    4. 1.5 years

    Explanation

    The demand reduction is 60 W per fixture, or 6 kW for 100 fixtures, which over 3,000 hours saves 18,000 kWh per year. At $0.10/kWh the annual savings are $1,800, so $5,400 divided by $1,800 gives 3.0 years. Simple payback uses first-year savings and ignores escalation and time value of money.

  179. Question 179Lighting Systems

    A room is 20 ft long and 10 ft wide, and the distance from the work plane to the luminaires is 5 ft. What is the room cavity ratio?

    1. 15
    2. 1.5
    3. 3.75 Correct answer.
    4. 7.5

    Explanation

    Room cavity ratio is calculated as five times the cavity height times the sum of length and width, divided by the product of length and width. Here 5 × 5 × 30 equals 750, and dividing by 200 ft² gives 3.75. The RCR is used with luminaire photometric tables to find the coefficient of utilization.

  180. Question 180Lighting Systems

    Lighting load in a cooled office building is reduced by 10 kW. During cooling hours the reduction in electrical demand at the utility meter is typically greater than 10 kW mainly because of which effect?

    1. Less lighting heat enters the space, lowering chiller load Correct answer.
    2. The utility applies a power factor penalty to lighting circuits
    3. Lamps produce fewer lumens per watt at reduced power
    4. Reduced lighting current lowers voltage drop in the feeder

    Explanation

    Nearly all lighting input power ultimately becomes heat inside the conditioned space, so it must be removed by the cooling system. When 10 kW of lighting is removed, the chiller and fans draw less power in addition to the direct lighting savings. This compounding effect is why lighting measures often show higher total savings in cooled buildings.

  181. Question 181Energy Savings Performance Contracting and Measurement and Verification

    In an energy savings performance contract (ESPC), what is the contractor's typical commitment?

    1. Full upfront payment of all construction costs by the owner
    2. A guarantee that measured savings will cover project costs Correct answer.
    3. Only equipment installation with no savings responsibility
    4. A fixed annual fee regardless of measured performance

    Explanation

    An ESPC transfers performance risk to the contractor, who guarantees a level of energy or cost savings. Project financing is typically repaid from those savings, so the owner avoids large upfront capital outlays.

  182. Question 182Energy Savings Performance Contracting and Measurement and Verification

    Which IPMVP option relies primarily on whole-facility utility meter data to determine savings?

    1. Option B: retrofit isolation, all parameter measurement
    2. Option A: retrofit isolation, key parameter measurement
    3. Option D: calibrated simulation
    4. Option C: whole facility Correct answer.

    Explanation

    IPMVP Option C uses whole-building or facility-level utility meter data, often normalized for weather and other variables. It is suited to projects where savings are large enough to be detected at the whole-facility level.

  183. Question 183Energy Savings Performance Contracting and Measurement and Verification

    Under IPMVP, savings are determined by which general relationship?

    1. Reporting-period energy minus baseline energy, without adjustment
    2. Reporting-period energy multiplied by the utility rate only
    3. Baseline energy plus reporting-period energy, then divided by two
    4. Baseline energy minus reporting-period energy, with adjustments Correct answer.

    Explanation

    IPMVP savings are the baseline energy or demand minus the reporting-period energy, with appropriate routine and non-routine adjustments. The result is then valued using agreed energy rates to express cost savings.

  184. Question 184Energy Savings Performance Contracting and Measurement and Verification

    An energy baseline for an ESPC project is typically established using data from which period?

    1. A representative 12-month period before retrofit Correct answer.
    2. The final year of the contract term
    3. A single peak-demand day in summer
    4. The first month after equipment installation

    Explanation

    The baseline should represent normal pre-retrofit operating conditions, including seasonal variation. A full year of data is commonly used so that weather and occupancy cycles are captured.

  185. Question 185Energy Savings Performance Contracting and Measurement and Verification

    When should the M&V plan for an ESPC be developed?

    1. Whenever a dispute arises between parties
    2. At the end of the first reporting year
    3. Only after all savings have been realized
    4. Before the contract is signed and before implementation Correct answer.

    Explanation

    The M&V plan should be agreed before contract execution so that baseline, boundaries, methods, and adjustments are defined while the project can still be designed around them. Developing it later undermines the credibility of reported savings.

  186. Question 186Energy Savings Performance Contracting and Measurement and Verification

    How is an ESPC project most commonly financed?

    1. By third-party financing repaid from energy savings Correct answer.
    2. By deferring all maintenance for the contract term
    3. By increasing the building's utility rates
    4. Through a grant that does not require repayment

    Explanation

    ESPC projects are often financed by a third party, such as a bank or an ESCO's financing arm, with debt service paid from guaranteed savings. This allows the owner to implement improvements without upfront capital.

  187. Question 187Energy Savings Performance Contracting and Measurement and Verification

    A project uses IPMVP Option A for a chiller retrofit. What is measured versus stipulated?

    1. Key parameters are measured and others are stipulated Correct answer.
    2. All operating parameters are continuously measured
    3. No parameters are measured; savings are estimated
    4. Only whole-building utility bills are used

    Explanation

    Option A measures the key parameters that drive savings and stipulates the remaining parameters using agreed values. It is appropriate when the stipulated values are unlikely to change or are costly to measure.

  188. Question 188Energy Savings Performance Contracting and Measurement and Verification

    Which statement describes IPMVP Option B?

    1. It relies solely on utility bills for the whole building
    2. It stipulates all savings without field measurement
    3. It uses only calibrated computer simulation
    4. It measures all parameters affecting the retrofit's energy use Correct answer.

    Explanation

    Option B isolates the retrofit and measures all parameters that affect its energy use, often with dedicated meters or sub-meters. It provides more certainty than Option A but usually costs more.

  189. Question 189Energy Savings Performance Contracting and Measurement and Verification

    IPMVP Option D is most appropriate when which condition applies?

    1. Savings are so small that no measurement is justified
    2. Whole-building utility bills are the only data source
    3. No baseline meter data exist and a calibrated model is needed Correct answer.
    4. A single pump can be isolated and metered easily

    Explanation

    Option D uses a computer model calibrated to available data to estimate what energy use would have been. It is useful for new construction, major renovations, or cases where baseline metering is unavailable or impractical.

  190. Question 190Energy Savings Performance Contracting and Measurement and Verification

    Which is an example of a routine baseline adjustment in M&V?

    1. Replacing a failed boiler with a larger unit
    2. Adding a new data center to the facility
    3. Changing the building's operating hours permanently
    4. Normalizing for differences in weather between years Correct answer.

    Explanation

    Routine adjustments account for regular, predictable variables such as weather, occupancy, or production levels that change between the baseline and reporting periods. Weather normalization is a standard example.

  191. Question 191Energy Savings Performance Contracting and Measurement and Verification

    A factory adds a second production shift during the reporting period. How should M&V treat this change?

    1. Restart the baseline period from scratch
    2. Apply a non-routine adjustment to the baseline Correct answer.
    3. Classify it as a routine weather adjustment
    4. Ignore it because savings are based only on utility bills

    Explanation

    A permanent change in production level or facility operation changes the conditions underlying the baseline. M&V should apply a non-routine adjustment so savings reflect the effect of the project rather than the added activity.

  192. Question 192Energy Savings Performance Contracting and Measurement and Verification

    IPMVP Option C is generally best suited to which situation?

    1. A measure whose energy use cannot be isolated
    2. A single lamp retrofit with very small savings
    3. A project with savings large relative to total facility use Correct answer.
    4. A project needing calibrated simulation only

    Explanation

    Option C measures savings at the whole-facility level, so the savings signal must be large enough to be distinguished from normal variation. It is commonly used when savings exceed roughly 10 percent of facility energy use.

  193. Question 193Energy Savings Performance Contracting and Measurement and Verification

    Why must M&V account for interactive effects among measures?

    1. Interactive effects only apply to lighting projects
    2. They eliminate the need for a baseline
    3. One measure's savings can change another measure's energy use Correct answer.
    4. They guarantee savings will always increase

    Explanation

    Measures in the same facility can affect one another; for example, reduced lighting heat gain can lower cooling load and raise heating load. M&V must account for these interactions so that total reported savings are not overstated.

  194. Question 194Energy Savings Performance Contracting and Measurement and Verification

    What does the measurement boundary in an M&V plan define?

    1. The contractor's maximum profit margin
    2. The building's architectural floor area
    3. The equipment and energy flows included in savings calculations Correct answer.
    4. The utility's meter reading schedule

    Explanation

    The measurement boundary establishes which equipment, systems, and energy flows are inside the M&V analysis. It prevents double-counting and clarifies responsibility for savings.

  195. Question 195Energy Savings Performance Contracting and Measurement and Verification

    When is stipulated savings most defensible in an M&V plan?

    1. When measurement is impractical or not cost-effective Correct answer.
    2. When savings are known to be zero
    3. When the owner wants to avoid any data collection
    4. When the project has no baseline period

    Explanation

    Stipulated savings may be acceptable when direct measurement is technically difficult or disproportionately expensive relative to the savings at stake. The stipulation should be documented and based on reliable engineering evidence.

  196. Question 196Energy Savings Performance Contracting and Measurement and Verification

    How should M&V costs be considered in ESPC project economics?

    1. They are always paid by the utility
    2. They must equal at least half the savings
    3. They are excluded from project cost
    4. They should be proportional to project size and risk Correct answer.

    Explanation

    M&V activities consume project resources, so their cost should be commensurate with project size, savings magnitude, and uncertainty. Overly elaborate M&V can erode project economics, while inadequate M&V weakens the savings guarantee.

  197. Question 197Energy Savings Performance Contracting and Measurement and Verification

    Under federal law, what is the maximum term for an ESPC awarded by a U.S. federal agency?

    1. 10 years
    2. 5 years
    3. 25 years Correct answer.
    4. 40 years

    Explanation

    Federal ESPC authority under 42 U.S.C. 8287 allows contract terms of up to 25 years from the date of award. The long term helps align financing payments with realized savings.

  198. Question 198Energy Savings Performance Contracting and Measurement and Verification

    In IPMVP Option D, what must a calibrated simulation demonstrate?

    1. That it reproduces measured utility bills within accepted tolerances Correct answer.
    2. That it uses only default weather data
    3. That it ignores occupancy schedules
    4. That it matches the design drawings exactly

    Explanation

    A calibrated simulation must be adjusted until its predicted energy use closely matches measured utility data for a calibration period. Accepted statistical tolerances are used to judge whether the model is credible for estimating savings.

  199. Question 199Energy Savings Performance Contracting and Measurement and Verification

    How does a shared-savings ESPC allocate risk differently from a guaranteed-savings ESPC?

    1. Guaranteed savings always transfer all risk to the utility
    2. The ESCO bears no risk in a shared-savings contract
    3. The owner bears all performance risk in both models
    4. In shared savings, the ESCO's payment depends on realized savings Correct answer.

    Explanation

    In a shared-savings contract, the ESCO is paid a share of the savings actually achieved, so both parties bear performance risk. In a guaranteed-savings contract, the ESCO guarantees a savings level and the owner typically arranges financing.

  200. Question 200Energy Savings Performance Contracting and Measurement and Verification

    Net savings differ from gross savings in that net savings account for which factor?

    1. Only the delivered fuel price
    2. Only the baseline weather data
    3. Free riders and other market effects Correct answer.
    4. Only the contractor's overhead

    Explanation

    Gross savings measure the change in energy use at the project site, while net savings adjust for effects such as free ridership, spillover, and market transformation. Net savings are more relevant to program or policy evaluation than to a single facility's M&V.

AEE Certified Energy Manager (CEM) flashcards

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

ASHRAE 90.1
ASHRAE Standard 90.1 sets minimum energy efficiency requirements for commercial and high-rise residential buildings, excluding low-rise residential. It covers envelope, HVAC, lighting, power, and service water heating.
IECC scope
The International Energy Conservation Code establishes minimum energy efficiency provisions for residential and commercial buildings. Jurisdictions adopt it into law and may amend it locally.
ASHRAE 62.1
ASHRAE Standard 62.1 specifies minimum ventilation rates and indoor air quality requirements for commercial buildings to protect occupant health and comfort.
Power factor formula
Power factor equals real power in kW divided by apparent power in kVA. It ranges from 0 to 1 for sinusoidal loads and indicates how effectively current does useful work.
Three-phase power equation
For a balanced three-phase load, real power in kW equals the square root of three times line-to-line voltage times current times power factor, divided by 1,000.
Motor efficiency
Motor efficiency is shaft output power divided by electrical input power, expressed as a percentage. It varies with load and typically peaks near 75 to 100 percent of rated load.
Affinity laws for fans
For centrifugal fans, flow varies directly with speed, pressure varies with speed squared, and power varies with speed cubed, assuming constant system and air density.
Commissioning definition
Commissioning is a documented quality-assurance process that verifies building systems are designed, installed, functionally tested, and capable of operating according to the owner's project requirements.
Retrocommissioning
Retrocommissioning applies the commissioning process to existing buildings not previously commissioned, focusing on identifying and correcting operational problems and low-cost energy-saving opportunities.
Preventive maintenance
Preventive maintenance is scheduled, time-based or usage-based servicing of equipment to reduce failures and maintain efficiency, such as filter changes, belt inspection, and lubrication.
ASHRAE Level 1 audit
A Level 1 energy audit is a walk-through survey that identifies obvious energy-saving opportunities, provides a rough estimate of costs and savings, and helps scope further analysis.
Energy use index
Energy use index divides annual building energy consumption by conditioned floor area, commonly expressed as kBtu per square foot per year or kWh per square meter per year.
Heating degree days
Heating degree days quantify how much average daily temperature falls below a base temperature, typically 65 degrees Fahrenheit, and are used to normalize heating energy use to weather.
IPMVP Option C
IPMVP Option C measures savings for an entire facility using whole-building utility meter data, with adjustments for weather and other changes, and is suited to multifaceted retrofits.
CHP total efficiency
Combined heat and power total efficiency equals useful electrical output plus recovered useful thermal output, divided by fuel energy input, often reaching 60 to 80 percent.
CHP prime movers
Common CHP prime movers include reciprocating engines, gas turbines, microturbines, steam turbines, and fuel cells. Each differs in capacity, electric efficiency, and usable heat grade.
Solar PV yield
Estimated annual PV energy equals system direct-current capacity times peak sun hours times performance ratio. Performance ratio accounts for inverter, wiring, soiling, and temperature losses.
Sensible heat equation
In inch-pound units, sensible cooling load in Btu per hour approximately equals 1.08 times airflow in cubic feet per minute times the dry-bulb temperature difference.
Chiller kW per ton
Chiller efficiency in kW per ton equals 12 divided by EER, or 3.517 divided by COP. Lower values indicate better full-load efficiency.
Air-side economizer
An air-side economizer uses cool outdoor air instead of mechanical cooling when outdoor air enthalpy or temperature is below the return air condition, reducing compressor energy.
Fan affinity laws
For a centrifugal fan, airflow is proportional to speed, static pressure to speed squared, and shaft power to speed cubed, so modest speed reductions yield large energy savings.
PID control
PID control combines proportional, integral, and derivative actions. Proportional responds to current error, integral eliminates offset, and derivative damps response to changing error.
Demand-controlled ventilation
Demand-controlled ventilation modulates outdoor air intake based on measured occupancy indicators such as carbon dioxide concentration, reducing ventilation energy when spaces are lightly occupied.
BACnet protocol
BACnet is an open building automation and control communications protocol that enables interoperable data exchange among HVAC, lighting, and other building systems from different manufacturers.
Thermal energy storage
Thermal energy storage shifts heating or cooling production to off-peak periods by storing chilled water, ice, or phase-change material for later discharge, reducing demand charges and chiller size.
Ice storage latent heat
Ice thermal storage uses the latent heat of fusion, about 144 British thermal units per pound, to store cooling energy with a smaller tank volume than chilled-water storage.
Full versus partial storage
Full storage meets the entire peak cooling load from storage; partial storage uses storage plus operating chillers. Partial storage typically lowers first cost and chiller capacity.
Luminous efficacy
Luminous efficacy is visible light output in lumens divided by electrical input power in watts, expressed as lumens per watt. Higher efficacy means more light per unit energy.
Lighting power density
Lighting power density equals installed lighting watts divided by floor area, typically watts per square foot. Energy codes set maximum allowances by space type.
Daylighting photosensor control
A daylighting photosensor control dims or switches electric lighting in response to available daylight, reducing lighting energy while maintaining target illuminance in the space.
Energy savings performance contract
An energy savings performance contract is an agreement in which an energy service company implements efficiency measures and guarantees savings that repay project costs over the contract term.
M&V savings equation
Verified savings equal baseline energy use minus reporting-period energy use, adjusted for changes in weather, occupancy, or other agreed conditions that affect energy use.

AEE Certified Energy Manager (CEM) study guide

Codes and Standards

The code landscape and what each document governs

Codes questions test scope, not memorized numbers. ASHRAE Standard 90.1 governs energy efficiency in commercial buildings and residential buildings more than three stories above grade. The IECC splits into a residential (R) chapter and a commercial (C) chapter, and it accepts 90.1 as an alternate path for commercial work. Know the companions: 62.1 is ventilation (not energy), 55 is thermal comfort, 100 is energy efficiency in existing buildings, 105 and Guideline 0/Standard 202 cover commissioning, 211 defines audit levels, and ISO 50001 is an energy management system standard, not a design code. Federal equipment minimum efficiencies under EPAct preempt weaker state rules.

Compliance paths and the traps they create

90.1 permits a prescriptive path (envelope, lighting power density, HVAC efficiency tables) or a performance path using Appendix G, the Performance Rating Method. Appendix G compares a proposed design against a baseline built from the prescriptive tables and produces a percentage improvement in energy cost, not energy use. Traps: treating Appendix G as a comparison to the existing building; confusing lighting power density (W/ft2, which the code regulates) with illuminance (foot-candles, which it does not); citing Standard 62.1 as an energy requirement; and applying a new-construction code to an existing-building alteration when Standard 100 governs.

Rule of thumb

Three stories or fewer above grade means residential scope; four or more means commercial scope. A four-story hotel follows 90.1 or IECC-Commercial; a three-story apartment building follows IECC-Residential.

Electrical Power Systems and Motors

The four relationships to write from memory

Real power (kW) does work, apparent power (kVA) loads conductors and transformers, and reactive power (kVAR) is the gap between them: kW = kVA x PF. Three-phase real power = 1.732 x V(line-line) x I x PF. Demand (kW) drives the monthly demand charge while consumption (kWh) drives the energy charge; load factor = average kW / peak kW, and low load factor signals a spiky, expensive profile. Capacitor correction reduces kVA and demand but never reduces kWh, which is why power factor correction is a demand-charge strategy, not an energy strategy.

Motors, drives, and the affinity laws

Motor efficiency peaks near 75% load, so oversized motors run inefficiently with poor power factor. NEMA Premium (IE3) motors cut losses several points versus standard efficiency. Variable speed drives save energy on centrifugal fans and pumps because power scales with the cube of speed: at 80% speed, ideal power is 51% (0.8 cubed). Traps: applying the cube law to a static-head-dominated system where savings are far smaller; confusing motor efficiency (shaft output divided by electrical input) with drive efficiency; and forgetting that part-load motor efficiency drops sharply below about 40% load.

Worked example

Input kW = hp x 0.746 x load fraction / efficiency. A 100 hp motor at 75% load and 93% efficiency draws 100 x 0.746 x 0.75 / 0.93 = 60.2 kW. At 2,000 hours per year that is 120,400 kWh, about $9,630 at $0.08/kWh. Capacitor sizing: kVAR = kW x (tan theta1 - tan theta2).

Maintenance and Commissioning

Maintenance strategy

Reactive (run-to-failure) maintenance is cheap to administer and expensive in downtime; preventive maintenance is calendar-based; predictive (condition-based) maintenance uses vibration analysis, oil analysis, infrared thermography, and ultrasonic leak detection to intervene just before failure. Reliability-centered maintenance prioritizes tasks by failure consequence using FMEA and MTBF data. In energy terms, deferred maintenance appears as fouled coils, leaking valves, slipped belts, and stuck dampers, each silently raising kW/ton or fan power.

Commissioning versus retrocommissioning

Commissioning is a quality process, not a repair. It begins with the owner's project requirements and the basis of design, proceeds through functional performance testing, and closes with seasonal verification, training, and a systems manual. ASHRAE Guideline 0 and Standard 202 define the process, and 90.1 requires commissioning for new commercial construction above a size threshold. Existing-building commissioning targets low-cost operational fixes and typically yields 5 to 15% whole-building savings. Monitoring-based commissioning sustains those savings through continuous trend review and fault detection.

Traps

Questions blur commissioning with testing, adjusting, and balancing (TAB is only one input), or assert that commissioning guarantees energy savings (it verifies design intent). The commissioning authority should be independent of the design and construction team, and savings from retrocommissioning decay within a few years without persistence measures.

Rule of thumb

Budget new-building commissioning at roughly 0.5 to 2% of construction cost.

Energy Audits and Instrumentation

The three audit levels

ASHRAE Standard 211 defines the levels the exam expects. Level 1 is a walk-through: utility bill analysis, rough benchmarking, a list of low-cost opportunities, and no rigorous savings calculations. Level 2 is an energy survey and analysis: end-use breakdown, measured or trended data, financial analysis of individual measures, and a recommended package. Level 3 is a detailed analysis of capital-intensive modifications, adding calibrated models, hourly simulation, and tighter cost estimates. The common trap is assigning a chiller plant replacement or boiler overhaul to Level 2; capital-intensive work requires Level 3 rigor.

Instrumentation and data quality

Match the tool to the measurement: power analyzers and watt-hour loggers for electrical loads; clamp-on or ultrasonic flow meters where pipe cannot be broken; pitot tube traverses for ducts; flow hoods for grilles; hot-wire anemometers for open faces; infrared imaging for envelope and electrical hot spots; combustion analyzers for boilers (oxygen, CO, stack temperature). Record accuracy, calibration date, and measurement boundary, because both Standard 211 and IPMVP depend on defensible boundaries. Logging interval must match the load cycle; spot readings miss duty cycling.

Metrics and rule of thumb

EUI (kBtu/ft2-yr) = total site energy in kBtu / conditioned floor area, with 1 kWh = 3,412 Btu. Degree-days support weather normalization. A typical U.S. office falls on the order of 50 to 70 kBtu/ft2-yr site energy, so benchmark against a regional median rather than a national average. Never base savings on nameplate data when a measured load profile exists.

CHP Systems and Renewable Energy

CHP fundamentals

Combined heat and power recovers waste heat from on-site generation. Prime movers include reciprocating engines (strong electrical efficiency plus recoverable jacket and exhaust heat), gas turbines and microturbines (high-temperature exhaust usable for steam or absorption cooling), fuel cells (high electrical efficiency, low emissions), and back-pressure steam turbines. Total CHP efficiency = (electrical output + useful thermal output) / fuel input, and well-matched systems reach 75 to 90%, compared with roughly 33 to 45% for grid power plus separate boilers.

Load matching is the design question

The real question is not how much can be generated but what the coincident thermal-to-electric ratio is. Reciprocating engines produce roughly 1 to 1.5 units of recoverable heat per unit of electricity; turbines are more electric-heavy. If thermal load is small, excess heat is dumped and overall efficiency collapses. Sizing to the base thermal load (thermal-led) maximizes efficiency; sizing to the electrical peak (electric-led) usually forces power export and standby and interconnection charges. The spark spread between fuel cost per kWh and purchased power price is the screening metric.

Renewables and traps

PV is rated in kW-DC at standard test conditions; annual output = kW x 8,760 x capacity factor, with typical U.S. capacity factors of 15 to 22%. Performance ratio captures soiling, wiring, inverter, and temperature losses. Traps: confusing module efficiency with capacity factor, and assuming nameplate kW equals annual kWh.

Worked example

A 1 MW CHP unit with 40% electrical and 45% recovered thermal efficiency: fuel input = 1,000 / 0.40 = 2,500 kW; useful thermal = 0.45 x 2,500 = 1,125 kW; total efficiency = 85%.

HVAC Systems

Efficiency metrics and conversions

COP = EER / 3.412, and 1 kW/ton equals COP 3.517 and EER 12.0. EER is a full-load rating, SEER is seasonal for small unitary equipment, and IEER or IPLV captures part-load behavior, which is the honest number for a chiller running most hours at 30 to 60% load. Boilers report combustion efficiency, thermal efficiency, and AFUE; AFUE is annualized for small equipment and based on higher heating value, so it is not directly comparable to steady-state combustion efficiency.

Air-side and water-side fundamentals

Q-sensible (Btu/h) = 1.08 x cfm x delta-T; Q-total = 4.5 x cfm x delta-h. VAV with static pressure reset, supply air temperature reset, and a functioning air-side economizer is the standard efficient configuration. Simultaneous heating and cooling, such as terminal reheat fighting a cold supply, is a classic audit finding. Fan and pump laws: flow varies with speed, head with speed squared, power with speed cubed.

Traps

Watch for economizer high-limit setpoints that lock out free cooling, minimum outdoor air set from 62.1 rather than a fixed percentage, and part-load ratings quoted at AHRI conditions that do not match actual entering condenser water temperature. Do not mix tons (12,000 Btu/h) with MBH, and remember that chiller kW/ton includes compressor, condenser, and auxiliary power.

Rule of thumb

A chilled water plant averaging 0.60 kW/ton including towers and pumps is well run; 0.80 or above signals trouble. A 0.1 to 0.2 in. w.c. duct static reset often yields 5 to 10% fan savings.

Building Automation and Control Systems

Points, loops, and sequences

Field DDC controllers run local sequences; supervisory controllers handle scheduling, trending, and alarms. Protocols include BACnet, Modbus, and LonWorks, with gateways translating between them. Point types: analog input (temperature sensor), analog output (valve command), binary input (status), binary output (start/stop). A control loop has a setpoint, a process variable, and an output. PID control adds proportional, integral, and derivative action to remove offset without hunting; proportional-only control leaves steady-state error, and overly tight deadbands cause valve and damper hunting. Most savings come from sequencing and reset strategies, not from replacing hardware.

High-value strategies

Scheduling with optimum start/stop, night setback and setup, duct static pressure reset, supply air temperature reset, chilled and condenser water temperature reset, ventilation reset with CO2-based demand control, economizer lockout diagnostics, chiller staging and plant optimization, and continuous trend review. Fault detection and diagnostics and analytics platforms convert trends into persistent savings.

Traps

Questions conflate setback with full shutdown, or assume a CO2 sensor measures ventilation rate directly; it is only an occupancy proxy. Another trap is applying a reset schedule without checking coil and terminal capacity limits, or leaving a hot-water valve and chilled-water valve open simultaneously through a changeover.

Rule of thumb

Roughly 1% heating savings per degree Fahrenheit of night setback over an 8-hour unoccupied period, so a 10 F setback yields about 10% if the building actually coasts down. Controls tune-ups commonly deliver 5 to 15% savings at low capital cost.

Thermal Energy Storage Systems

Storage types and sizing

Thermal energy storage decouples production from demand. Chilled water storage uses sensible heat: 1 ton-hour = 12,000 Btu, and with a 10 F usable delta-T one cubic foot of water holds about 624 Btu, so plan roughly 19 cubic feet per ton-hour plus unusable stratified volume. Ice storage uses latent heat and needs only about 2 to 3 cubic feet per ton-hour, but requires a chiller that charges at low evaporating temperature, costing efficiency and raising kWh. Hot water storage serves boiler plants and solar thermal the same way.

Strategies and trade-offs

Full storage shifts the entire on-peak load, maximizing demand reduction and requiring the largest tank. Partial storage runs the chiller alongside storage during the day and is usually more capital-efficient. Control modes include chiller-priority, storage-priority, and constant proportion. The economics rest on demand charges and time-of-use differentials, not total kWh; storage typically increases site energy slightly because charging still requires compressor work, and ice charging occurs at a lower COP.

Traps

Confusing tons of capacity with ton-hours of capacity; ignoring standby and tank heat gain (storage efficiency typically 85 to 95%); assuming storage saves energy when it mainly saves demand dollars; and overlooking that ice-capable chillers have different selections, flows, and efficiencies.

Worked example

A 500-ton peak with a 10-hour on-peak window requires 5,000 ton-hours for full storage. A 2,000 ton-hour ice tank at 2.5 cubic feet per ton-hour needs 5,000 cubic feet. Under partial storage, a 300-ton chiller plus a 2,000 ton-hour tank covers the same day: 300 x 10 + 2,000 = 5,000 ton-hours.

Lighting Systems

Metrics and terminology

Lumens measure light output, efficacy is lumens per watt, illuminance is foot-candles (1 fc = 10.76 lux), and lighting power density is W/ft2. Codes regulate LPD, not illuminance, and LPD must be computed from fixture input watts, meaning lamp watts plus ballast or driver losses, not lamp watts alone. Color metrics matter too: CRI for rendering, CCT in kelvin, and BUG ratings for exterior luminaires.

Technology and controls

LEDs dominate with efficacies well above fluorescent T8/T5 and HID sources, and they dim smoothly, which makes them natural partners for controls. Fluorescent systems still appear on exams: ballast factor modifies both lamp lumens and system watts, and lamp lumen depreciation combined with dirt depreciation yields the light loss factor used to select fixture quantities. Controls deliver savings in a predictable order: occupancy sensing, daylight-responsive dimming at perimeter glazing, scheduled sweep, and personal tuning.

Traps

Comparing lamp efficacy with fixture efficacy; omitting ballast or driver watts from LPD; treating foot-candles and lux as interchangeable; assuming occupancy sensors pay in continuously occupied spaces such as control rooms; and forgetting that 90.1 offers both space-by-space and whole-building LPD methods, which give different allowances.

Worked example

A 60-fixture office retrofit: existing fixtures draw 3 x 32 W lamps at 1.0 ballast factor plus 12 W of ballast loss, or 108 W each; new LED fixtures draw 38 W. Savings = 70 W x 60 = 4.2 kW, or 12,600 kWh at 3,000 hours per year, plus reduced cooling load.

Energy Savings Performance Contracting and Measurement and Verification

IPMVP options

Measurement and verification rests on a transparent, adjusted baseline. IPMVP defines four options: A (retrofit isolation with key parameters measured, others stipulated), B (retrofit isolation with all parameters measured), C (whole-building metering), and D (calibrated simulation). Use A or B when savings are large relative to the whole building and equipment-level separation is practical; use C when measures are numerous and diverse; use D when no baseline period data exist or the design is new. The classic trap is calling a project Option B when operating hours were stipulated, or letting Option A stipulations substitute for defensible engineering.

Savings mechanics

Savings = adjusted baseline energy minus reporting-period energy, plus or minus adjustments. Routine adjustments normalize for weather, occupancy, or production using regression on an independent variable. Non-routine adjustments cover changes to the facility itself, such as added loads, changed schedules, or new equipment. Build the baseline from at least 12 months or a full operating cycle, document meters and calibration, and specify the reporting period, verification frequency, and uncertainty in the M&V plan.

Contract structure

An energy savings performance contract uses an ESCO to design, install, and often finance measures, with savings servicing the investment. Structures include guaranteed savings, shared savings, and design-build with a guarantee. Watch measurement boundaries, escalation and discount-rate assumptions, M&V cost, and persistence, since savings decay without follow-up commissioning.

Rule of thumb

Use Option C for a portfolio of many small measures; use Option A or B for one large chiller or boiler plant.

AEE Certified Energy Manager (CEM) cheat sheet

Quick reference

Codes and Standards

  • ASHRAE 90.1 applies to commercial and high-rise residential buildings; ASHRAE 90.2 applies to low-rise residential buildings.

  • The IECC is a model energy code; it becomes enforceable only after adoption by the authority having jurisdiction, including local amendments.

  • ASHRAE 62.1 sets minimum ventilation and indoor air quality requirements for commercial buildings; ASHRAE 62.2 covers residential buildings.

  • ASHRAE 55 defines acceptable thermal comfort conditions using operative temperature, humidity, air speed, and clothing/metabolic factors.

  • ASHRAE 100 provides energy efficiency requirements for existing commercial buildings, including O&M and retrofit guidance.

  • NFPA 70 is the National Electrical Code; NFPA 70E addresses electrical workplace safety; NFPA 70B addresses electrical equipment maintenance.

  • ISO 50001 specifies requirements for an energy management system; ISO 50002 covers energy audits; ISO 50006 addresses energy performance indicators and baselines.

  • ASHRAE audit levels: Level 1 walk-through, Level 2 energy survey and analysis, Level 3 detailed capital-intensive analysis.

  • Model codes are not automatically law: verify the locally adopted edition and amendments before applying a requirement.

Quick reference

Electrical Power Systems and Motors

  • S² = P² + Q² for apparent (kVA), real (kW), and reactive (kVAR) power; power factor PF = P/S = kW/kVA.

  • Balanced three-phase real power: P(kW) = √3 × V_LL × I × PF / 1000.

  • Motor input power: kW = √3 × V × I × PF / 1000; motor efficiency η = shaft output / electrical input.

  • Motor load factor ≈ measured input kW divided by rated input kW at operating voltage; part-load efficiency falls sharply below about 50% load.

  • Centrifugal fan or pump affinity laws: flow ∝ speed, head ∝ speed², power ∝ speed³, assuming constant system and density.

  • Voltage unbalance derates three-phase motors; NEMA derating factor depends on percent voltage unbalance, and current unbalance can exceed voltage unbalance.

  • Power factor correction capacitor kVAR = kW × (tan θ1 − tan θ2), where θ1 and θ2 are the initial and target power-factor angles.

  • Transformer losses consist of no-load core loss plus load-dependent I²R copper loss; efficiency peaks when copper loss equals core loss.

  • IEEE 519 limits harmonic current and voltage distortion at the point of common coupling; THD is a common screening metric.

Quick reference

Maintenance and Commissioning

  • Commissioning verifies systems meet the owner's project requirements (OPR) through documented design review, functional performance tests, and issue resolution.

  • Retrocommissioning applies the Cx process to existing buildings; monitoring-based commissioning uses trend data and analytics to persist savings.

  • ASHRAE Guideline 0 describes the commissioning process; ASHRAE Guideline 1.1 addresses HVAC&R commissioning.

  • Preventive maintenance is time- or usage-based; predictive maintenance uses vibration, thermography, oil analysis, or performance trends to schedule work.

  • Dirty filters, fouled coils, incorrect refrigerant charge, and simultaneous heating/cooling each degrade efficiency and are common commissioning findings.

  • An economizer functional test verifies damper travel, actuator linkage, changeover logic, and minimum outdoor-air position.

  • A CMMS tracks work orders, equipment histories, and maintenance costs; trended run hours and alarms support condition-based decisions.

  • Commissioning authority independence from design and construction reduces conflict of interest in verification.

Quick reference

Energy Audits and Instrumentation

  • Level 1 audit: walk-through survey and rough savings estimate; Level 2: energy survey with end-use breakdown and economic screening; Level 3: detailed analysis of capital-intensive measures.

  • Energy use index EUI = annual energy consumption / conditioned floor area; common units are kBtu/ft²·yr or kWh/m²·yr.

  • Heating and cooling degree days use a base temperature, commonly 65°F, to weather-normalize energy use.

  • Regression baseline: energy = intercept + slope × driver (e.g., HDD or CDD); R² indicates how much variation the model explains.

  • True-RMS meters are required for distorted or nonlinear loads; averaging meters can misread variable-frequency-drive and electronic loads.

  • Instrument accuracy stated as percent of reading is not interchangeable with percent of full scale; verify calibration and range before use.

  • Spot measurements capture one moment; continuous data logging captures duty cycles, schedules, and variability needed for savings estimates.

  • IPMVP options: A retrofit isolation with key parameters, B retrofit isolation with all parameters, C whole facility, D calibrated simulation.

Quick reference

CHP Systems and Renewable Energy

  • CHP total efficiency = (useful electric output + recovered useful thermal output) / fuel energy input; well-matched systems can reach 60–80%.

  • CHP prime movers include reciprocating engines, gas turbines, microturbines, steam turbines, and fuel cells; electric efficiency and heat grade differ by type.

  • CHP sizing rule: match the prime mover to the base thermal or electric load that persists for many hours; oversized units cycle and lose efficiency.

  • Useful heat recovery sources include exhaust gas, jacket water, lube oil, and turbine exhaust; recoverable temperature limits the usable heat.

  • Annual PV energy ≈ array kW_DC × peak sun hours × performance ratio; performance ratio includes inverter, wiring, soiling, and temperature losses.

  • Wind power in the rotor sweep is P = 0.5 × air density × swept area × wind speed³; the Betz limit is 59.3% of that power.

  • IEEE 1547 governs interconnection of distributed energy resources with the electric utility grid.

  • Net metering credits exported generation against imports; a power purchase agreement sets contracted energy price and term.

Quick reference

HVAC Systems

  • Sensible heat (IP): Q_s(Btu/h) ≈ 1.08 × CFM × ΔT(°F).

  • Latent heat (IP): Q_l(Btu/h) ≈ 0.68 × CFM × ΔW(grains/lb); total heat ≈ 4.5 × CFM × Δh(Btu/lb).

  • Cooling efficiency conversions: EER = 12 / (kW/ton); COP = EER / 3.412; COP ≈ 3.517 / (kW/ton).

  • Chiller plant efficiency improves with higher chilled-water supply temperature, lower condenser-water temperature, and higher chilled-water ΔT.

  • Air-side economizer uses outdoor air for free cooling when outdoor air enthalpy or dry-bulb is below return air; verify changeover and damper leakage.

  • VAV systems save fan energy with static-pressure reset and supply-air-temperature reset; excessive minimum airflow can waste reheat energy.

  • Boiler combustion efficiency = (input − stack losses) / input; stack temperature and excess air are key indicators.

  • Refrigerant charge diagnosis uses superheat and subcooling; low charge can reduce capacity and efficiency.

  • Energy recovery ventilator effectiveness = (actual heat transfer) / (maximum possible heat transfer) between airstreams.

Quick reference

Building Automation and Control Systems

  • DDC controllers use PID loops; proportional band, integral time, and derivative time must be tuned to the controlled process.

  • Scheduling with optimal start/stop reduces run time while meeting occupancy; override limits prevent indefinite after-hours operation.

  • BACnet, Modbus, and LonWorks are common BAS protocols; BACnet is an open ASHRAE/ANSI standard for interoperable building data.

  • Trend logs and alarms are the primary BAS diagnostic data for detecting simultaneous heating/cooling, stuck dampers, and schedule drift.

  • Demand-controlled ventilation uses CO2 or occupancy sensors to reset outdoor-air intake and reduce ventilation load.

  • A sequence of operations defines setpoints, interlocks, staging, and reset logic; commissioning verifies it matches design intent.

  • Point mapping and as-built documentation are needed to avoid control gaps when integrating third-party equipment.

  • Reset schedules for supply air temperature, static pressure, and chilled water temperature reduce energy while maintaining comfort.

Quick reference

Thermal Energy Storage Systems

  • TES shifts cooling or heating production to off-peak hours, reducing peak demand charges and allowing smaller chillers or boilers.

  • Sensible chilled-water storage capacity Q = m × c_p × ΔT; water's c_p is about 1 Btu/lb·°F.

  • Ice storage uses latent heat of fusion of about 144 Btu/lb, giving much higher volumetric storage density than chilled water.

  • Full storage meets the entire peak load from storage; partial storage runs chillers and storage together to reduce first cost.

  • TES charging and discharging must be controlled with tank temperature, state of charge, and chiller staging to avoid standby losses.

  • Phase-change materials store energy at a nearly constant temperature and can fit space-constrained retrofits.

  • TES economics depend on time-of-use rate spread, demand charges, and the number of charge/discharge cycles per year.

Quick reference

Lighting Systems

  • Luminous efficacy = lumens / watts; LEDs commonly exceed 100 lm/W, while incandescent lamps are about 10–17 lm/W.

  • Lighting power density LPD = installed lighting watts / floor area; energy codes set maximum LPD by space type.

  • Lumen method: number of luminaires = (target illuminance × area) / (lumens per luminaire × coefficient of utilization × maintenance factor).

  • Lighting controls include occupancy sensing, daylight dimming, scheduling, and task tuning; each reduces hours or power.

  • CRI describes color rendering (0–100), and CCT describes light appearance in kelvin; neither alone measures energy efficiency.

  • Ballast factor scales lamp output and input power; a lower ballast factor reduces both light output and wattage.

  • LED retrofits can reduce wattage and maintenance; verify luminaire efficacy, glare control, dimming compatibility, and code compliance.

  • Daylighting photosensor control must be commissioned with setpoints and deadbands to avoid nuisance switching or dimming.

Quick reference

Energy Savings Performance Contracting and Measurement and Verification

  • ESPC: an energy service company implements efficiency measures and guarantees energy or cost savings that repay project costs over the term.

  • IPMVP savings = baseline energy − reporting-period energy ± adjustments for weather, occupancy, and other agreed variables.

  • Measurement boundary defines which meters, systems, and fuels are included; double counting must be avoided across measures.

  • Option A uses key-parameter measurement with some stipulated values; Option B measures all parameters affecting the retrofit's energy use.

  • Option C uses whole-building utility data and is suited to projects with many interactive measures; Option D uses calibrated simulation.

  • M&V plans specify baseline, measurement boundary, methods, frequency, uncertainty, and reporting responsibilities.

  • Shared-savings and guaranteed-savings contracts allocate risk differently; contract terms define baseline adjustments and savings verification.

  • Routine and non-routine adjustments separate weather or occupancy changes from true measure performance.

AEE Certified Energy Manager (CEM) key terms

ASHRAE Standard 90.1

Sets minimum energy efficiency requirements for the design and operation of most commercial and high-rise residential buildings, covering envelope, HVAC, service water heating, power, lighting, and other equipment.

Related: International Energy Conservation Code (IECC), Prescriptive Compliance Path, Lighting Power Density (LPD)
International Energy Conservation Code (IECC)

A model energy code published by the International Code Council that sets minimum efficiency requirements for residential and commercial buildings; local jurisdictions adopt it, often by reference, as enforceable law.

Related: ASHRAE Standard 90.1, Prescriptive Compliance Path
ASHRAE Standard 62.1

Standard specifying minimum ventilation rates and indoor air quality requirements for commercial and institutional buildings; its outdoor-air rates directly affect heating, cooling, and fan energy use.

Related: Demand-Controlled Ventilation (DCV)
Prescriptive Compliance Path

A code compliance route in which each building component must individually satisfy listed minimum requirements, such as insulation levels or lighting wattage limits, without relying on whole-building energy modeling trade-offs.

Related: ASHRAE Standard 90.1, Lighting Power Density (LPD)
Power Factor

The ratio of real power in kilowatts to apparent power in kilovolt-amperes in an AC circuit. Low power factor raises current for the same useful work, increasing losses and often triggering utility penalties.

Related: Demand Charge, Variable Frequency Drive (VFD)
Demand Charge

A monthly utility charge based on the highest rate of energy use recorded during a billing period, usually averaged over a short interval such as 15 minutes; reducing peaks lowers this charge.

Related: Peak Shaving, Power Factor, Thermal Energy Storage (TES)
NEMA Premium Efficiency Motor

An electric motor efficiency designation defined by NEMA MG 1 that exceeds prior standard-efficiency levels; many codes require premium-efficiency motors for general-purpose applications in new and replacement installations.

Related: Variable Frequency Drive (VFD), Power Factor
Variable Frequency Drive (VFD)

An electronic device that varies the speed of an AC motor by adjusting the frequency and voltage supplied to it, so fan and pump output tracks load instead of running at constant full speed.

Related: Power Factor, Variable Air Volume (VAV) System
Commissioning (Cx)

A quality-focused process for verifying that building systems and assemblies are designed, installed, tested, and able to operate and be maintained according to the owner's requirements and the design intent.

Related: Retro-commissioning (RCx), Functional Performance Test (FPT)
Retro-commissioning (RCx)

A systematic process applied to existing buildings that were not newly commissioned, to identify and correct operational deficiencies and tune controls and equipment so systems perform as intended or better.

Related: Commissioning (Cx), Functional Performance Test (FPT), Energy Baseline
Functional Performance Test (FPT)

A documented test in which a system is operated under staged conditions to demonstrate that it performs its intended function and interacts correctly with related systems and controls.

Related: Commissioning (Cx), Retro-commissioning (RCx)
Energy Use Intensity (EUI)

Total annual site energy use of a building divided by its gross floor area, typically stated in kBtu per square foot per year or kWh per square meter per year; a convenient benchmark for comparing similar buildings.

Related: ASHRAE Level 2 Energy Audit, Energy Baseline
ASHRAE Level 2 Energy Audit

An energy survey with detailed analysis of energy use and costs broken down by end use, plus identification and rough costing of conservation measures; more thorough than a walk-through but short of investment-grade analysis.

Related: Energy Use Intensity (EUI), Infrared Thermography, Retro-commissioning (RCx)
Blower Door Test

A diagnostic test that mounts a calibrated fan in an exterior doorway to pressurize or depressurize a building, measuring envelope air leakage and helping locate infiltration paths.

Related: Infrared Thermography
Infrared Thermography

An inspection technique using thermal cameras to visualize surface temperature differences, revealing insulation gaps, air leakage, moisture, and overheating electrical connections that are invisible to the naked eye.

Related: Blower Door Test, ASHRAE Level 2 Energy Audit
Combined Heat and Power (CHP)

On-site generation of electricity and useful thermal energy from a single fuel source, such as a gas turbine or engine, with recovered heat used for process loads, space heating, or absorption cooling.

Related: Heat Rate, Capacity Factor
Heat Rate

The fuel energy input required to produce one unit of useful output, typically Btu per kWh for generators or a dimensionless ratio for boilers; a lower heat rate means higher efficiency.

Related: Combined Heat and Power (CHP), Capacity Factor
Capacity Factor

The ratio of energy actually produced by a generating unit over a period to the energy it would have produced at rated output continuously; wind and solar typically show low values compared with dispatchable plants.

Related: Renewable Energy Credit (REC), Heat Rate
Renewable Energy Credit (REC)

A tradable certificate representing the environmental attributes of one megawatt-hour of electricity generated from renewable sources, used to claim renewable use and to comply with portfolio standards.

Related: Capacity Factor
Coefficient of Performance (COP)

The ratio of useful heating or cooling output to energy input expressed in consistent units; a COP of 4 delivers four units of cooling per unit of electricity, roughly equal to 13.6 EER.

Related: Chiller Efficiency (kW/ton)
Air-Side Economizer

A control strategy that uses cool outdoor air instead of mechanical cooling when outdoor conditions permit, by modulating outdoor-air and relief dampers to bring outside air into the building.

Related: Demand-Controlled Ventilation (DCV), Variable Air Volume (VAV) System
Variable Air Volume (VAV) System

An air distribution system in which the supply fan delivers a varying volume of air at a roughly constant temperature, and zone boxes throttle airflow to match each zone's changing load.

Related: Air-Side Economizer, Variable Frequency Drive (VFD), Control Deadband
Chiller Efficiency (kW/ton)

Electrical demand in kilowatts divided by cooling output in tons of refrigeration; lower values are better, with efficient machines typically near 0.5 to 0.6 kW per ton at design conditions.

Related: Coefficient of Performance (COP), Thermal Energy Storage (TES)
BACnet

A standard data communication protocol, ASHRAE Standard 135, that lets building automation devices from different manufacturers exchange data over a common network, supporting interoperability and competitive bidding.

Related: Proportional-Integral-Derivative (PID) Control, Control Deadband
Proportional-Integral-Derivative (PID) Control

A control algorithm whose output combines proportional, integral, and derivative responses to the difference between setpoint and measured value, giving stable control of temperature, pressure, and flow.

Related: Control Deadband, BACnet
Control Deadband

The range of values around a setpoint within which no control action is taken, preventing equipment from cycling rapidly between heating and cooling; wider deadbands generally save energy.

Related: Proportional-Integral-Derivative (PID) Control, Occupancy Sensor
Demand-Controlled Ventilation (DCV)

A ventilation strategy that modulates outdoor air intake in response to measured occupancy, often using carbon dioxide sensors, so spaces get needed outdoor air without over-ventilating and wasting conditioning energy.

Related: ASHRAE Standard 62.1, Occupancy Sensor
Thermal Energy Storage (TES)

A system that stores cooling or heating capacity, usually in water, ice, or phase-change material, during low-cost or off-peak periods and discharges it later to meet building loads.

Related: Ice Storage, Peak Shaving, Thermal Stratification
Ice Storage

A thermal storage approach that builds ice in tanks or on coils using a chiller at night, then melts it during the day to supply chilled water, shifting electric demand to off-peak hours.

Related: Thermal Energy Storage (TES), Peak Shaving, Thermal Stratification
Peak Shaving

Deliberately reducing facility electric demand during high-cost or constrained periods, often through storage discharge, load shedding, or on-site generation, to cut demand charges and capacity costs.

Related: Thermal Energy Storage (TES), Demand Charge
Thermal Stratification

The natural layering of a stored fluid by temperature, with warmer, lighter water at the top and cooler, denser water below; good stratification preserves usable capacity in chilled or hot water storage tanks.

Related: Ice Storage, Thermal Energy Storage (TES)
Lighting Power Density (LPD)

Installed lighting wattage in a space divided by its floor area, expressed in watts per square foot; energy codes set maximum allowed values used in prescriptive and whole-building compliance calculations.

Related: ASHRAE Standard 90.1, Luminaire Efficacy, Daylight Harvesting
Luminaire Efficacy

The delivered light output of a complete luminaire in lumens divided by the power it draws in watts, including driver or ballast losses; the key metric for comparing lighting products.

Related: Lighting Power Density (LPD), Ballast Factor
Ballast Factor

The ratio of light output from a fluorescent lamp operated on a given ballast to the output obtained with a standard reference ballast; it scales both lumen output and input wattage.

Related: Luminaire Efficacy, Lighting Power Density (LPD)
Daylight Harvesting

A control strategy that dims or switches electric lighting in response to available daylight measured by photosensors, maintaining target illuminance while cutting lighting energy and cooling load.

Related: Occupancy Sensor, Lighting Power Density (LPD)
Occupancy Sensor

A device that detects whether a space is occupied, using passive infrared, ultrasonic, or both, and turns lighting or ventilation off or down when the area is empty.

Related: Daylight Harvesting, Demand-Controlled Ventilation (DCV)
Energy Savings Performance Contract (ESPC)

A contracting arrangement in which an energy services company finances and installs efficiency improvements and is repaid from measured savings, under guaranteed or shared-savings terms set in the contract.

Related: International Performance Measurement and Verification Protocol (IPMVP), Energy Baseline
International Performance Measurement and Verification Protocol (IPMVP)

An industry framework published by EVO defining common measurement and verification options, boundary definitions, baseline adjustment, and reporting conventions so claimed energy savings can be verified consistently and transparently.

Related: Energy Baseline, Retrofit Isolation, Energy Savings Performance Contract (ESPC)
Energy Baseline

The measured or modeled energy use during a defined pre-retrofit period, adjusted for routine factors such as weather, occupancy, and production, against which post-installation consumption is compared to determine savings.

Related: International Performance Measurement and Verification Protocol (IPMVP), Retrofit Isolation
Retrofit Isolation

A measurement and verification option in which savings for an individual measure are determined by field measurement of that measure's energy use, separate from the rest of the facility, using short-term or continuous metering.

Related: Energy Baseline, International Performance Measurement and Verification Protocol (IPMVP)

AEE Certified Energy Manager (CEM) study plan

8 weeks · About 7 hours per week

Week 1

Codes and Standards & Energy Audits and Instrumentation

  • Map ASHRAE 90.1, ASHRAE 100, IECC, and NFPA 70E each to the specific CEM decision it governs (new envelope design, existing-building retrofit, code baseline, electrical safety).

  • Distinguish prescriptive from performance compliance paths and work one envelope trade-off through a performance path.

  • Match each measurement (power, flow, temperature, light level, flue gas) to an instrument, and state its accuracy, range, and calibration interval.

  • Compute load factor, demand factor, and diversity factor from a self-built 15-minute interval data set.

  • Draft a 3-day Level II audit measurement plan: what to log, at what interval, for how long.

Your checkpoint

One-page audit instrumentation matrix (parameter to instrument to accuracy to calibration interval) plus a 10-question self-quiz scored at 80% or higher.

Week 2

Electrical Power Systems and Motors

  • Compute single-phase and three-phase kW, kVA, current, and power factor for ten load scenarios without notes.

  • Size feeders, overcurrent protection, and transformers for a stated load, and justify the 125% and 80% rules applied.

  • Calculate demand charges, energy charges, and power-factor penalties from a sample utility bill, then price a power-factor correction capacitor bank.

  • Break motor losses into core, stator I2R, rotor, stray, and friction/windage, and compute annual kWh savings from an efficiency upgrade.

  • Compare across-the-line, soft-start, and VFD starting on inrush, then calculate VFD energy savings using the affinity laws.

Your checkpoint

A twelve-problem worked electrical set with formulas and units shown on every line, self-scored at 85% or higher.

Week 3

Electrical Power Systems and Motors & HVAC Systems

  • Apply NEC Article 430 branch-circuit conductor, short-circuit, and overload sizing to three motor nameplate examples.

  • Convert between dry-bulb, wet-bulb, RH, dew point, humidity ratio, and enthalpy for five air states.

  • Compute coil sensible and latent loads and supply-air CFM from the governing equations, then check the result against a plotted state-point pair.

  • Quantify the annual energy difference between constant-air-volume and VAV operation using a simplified bin method.

  • Explain how motor load factor and part-load efficiency interact with fan and pump system curves.

Your checkpoint

A five-point psychrometric plot with coil loads and airflow calculated for each point, plus a 20-question electrical/HVAC mixed quiz scored at 80% or higher.

Week 4

HVAC Systems

  • Calculate chiller kW/ton, COP, and part-load value, and rank three chiller options on annual energy and demand.

  • Compute combustion, thermal, and annual fuel utilization efficiency from flue-gas temperature and O2/CO2 readings.

  • Estimate savings from economizer operation, air-side heat recovery, and chilled-water and supply-air temperature reset.

  • Compare VAV, fan-powered VAV, and chilled-beam options on first cost, annual kWh, and simple payback.

  • Diagnose eight common HVAC operational faults and name the measurement or trend that confirms each.

Your checkpoint

A four-measure HVAC comparison matrix listing kW/ton (or efficiency), annual kWh, peak kW, and simple payback for each measure.

Week 5

CHP Systems and Renewable Energy

  • Size a CHP prime mover against an 8,760-hour load duration curve and report electric and thermal utilization.

  • Compute overall CHP efficiency, power-to-heat ratio, and operating cost from fuel price and spark spread.

  • Estimate PV annual output from plane-of-array irradiance, system derate, and tilt/azimuth correction.

  • Compare PV, solar thermal, wind, and biomass on levelized cost of energy using a common discount rate.

  • Identify standby-charge, interconnection, and net-metering constraints that change a renewable project's economics.

Your checkpoint

A three-scenario CHP-versus-PV feasibility memo reporting annual kWh, recovered thermal energy, levelized cost of energy, and simple payback.

Week 6

Thermal Energy Storage Systems & Lighting Systems

  • Size a chilled-water thermal storage tank from a load profile and quantify peak-demand reduction for full and partial storage.

  • Calculate plant efficiency with and without storage, including the charging penalty and part-load chiller behavior.

  • Compute illuminance, fixture efficacy, and lighting power density, and compare LED, fluorescent, and HID options on a lumens-per-watt and life-cycle basis.

  • Calculate lighting retrofit savings from LPD reduction, operating hours, and demand reduction, adding the associated cooling-load savings.

  • Apply lighting power density allowances and automatic-control credits when checking a design against code.

Your checkpoint

A single spreadsheet model that outputs annual kWh savings, peak kW reduction, and simple payback for one thermal storage scenario and one LED retrofit.

Week 7

Building Automation and Control Systems & Energy Savings Performance Contracting and Measurement and Verification

  • Write a sequence of operation for an air-handler economizer and a duct static-pressure reset, naming the analog and binary points involved.

  • Detect economizer and simultaneous heating/cooling faults from a trend-data set and quantify the wasted energy.

  • Specify optimum start-stop, night setback, and demand-limiting strategies, with an expected savings estimate for each.

  • Assign IPMVP Options A, B, C, and D to four project scenarios and defend each choice.

  • Build a weather-normalized baseline with a change-point regression, compute adjusted savings, and state the uncertainty and persistence requirements.

Your checkpoint

A one-page measurement and verification plan for a chiller retrofit stating the IPMVP option, baseline period, measurement boundary, independent variables, and uncertainty, checked against a self-scored criteria list.

Week 8

Maintenance and Commissioning

  • Write a commissioning plan for a new chiller plant covering pre-functional checks, functional performance tests, and seasonal testing.

  • Distinguish commissioning, retro-commissioning, and monitoring-based commissioning, and state the typical cost and savings range for each.

  • Build a preventive and predictive maintenance schedule and estimate the annual energy impact of the tasks on it.

  • Complete a timed 100-question cumulative mock exam and remediate every missed item to its source concept.

  • Condense all ten domains into a single one-page formula and definition sheet.

Your checkpoint

A timed 100-question mock exam scored at 80% or higher overall with no domain below 70%, plus the completed one-page formula sheet.

Milestones

Week 2: Solve three-phase power, power-factor, and motor-efficiency problems cold, scoring 8 of 10 on an untimed electrical set with correct units.

Week 4: Produce psychrometric state points, coil loads, and chiller kW/ton without notes, scoring 80% or higher on the HVAC set.

Week 6: Complete thermal storage sizing and lighting LPD calculations with correct units, scoring 75% or higher on the combined quiz.

Week 8: Score 80% or higher on the timed 100-question mock exam with no domain below 70%, and fit the full formula sheet on one page.

AEE Certified Energy Manager (CEM) exam day

Your checklist

Government-issued photo ID

needs_review - confirm with AEE/provider which ID types are accepted and that the name matches your registration exactly.

Exam confirmation or admission document

Print or save the scheduling confirmation and any admission letter; confirm whether a paper or digital copy is accepted.

Approved calculator

Bring a basic scientific calculator if permitted; needs_review - confirm allowed models and whether programmable or graphing calculators are prohibited.

Allowed reference material

If the exam is open-book, bring only the references the provider permits, tabbed and indexed; needs_review - confirm the current allowed-reference list and whether notes or annotations are allowed.

Pencils, pens, and eraser

Bring several No. 2 pencils or pens as required; confirm whether scratch paper and writing tools are supplied.

Scratch paper

needs_review - confirm whether blank scratch paper is allowed or provided; if allowed, bring only unmarked paper.

Non-smart watch or timer

A simple watch can help pace sections if the room clock is not visible; needs_review - confirm whether watches are permitted.

Snack and water

Bring a light snack and water for before or after the exam or an approved break; store them according to test-center rules.

Test-center or online logistics

Know the address, parking or transit, and arrival time; for online proctoring, test the camera, microphone, internet, quiet room, and backup connection.

Comfort items

Bring layers, glasses or contacts, tissues, and any permitted medication; avoid items that violate security rules.

Provider contact information

Save the AEE/provider phone number and email in case of scheduling or technical issues.

Sleep and focus plan

Plan a normal sleep schedule and a light review; do not rely on cramming new material on exam day.

Plan the day

72 hours before

Confirm registration, test format, timing, allowed materials, ID, calculator, break, scoring, and retake policies directly with AEE/provider; print or save the confirmation.

72 hours before

Take one timed practice set under exam-like conditions, focusing on unit conversions, economics, load calculations, and HVAC/lighting fundamentals.

72 hours before

Organize approved references with tabs and prepare a one-page formula and unit index if allowed.

24 hours before

Stop learning new topics; review the formula index and common unit traps; check calculator batteries and device chargers.

24 hours before

Pack ID, confirmation, calculator, references, pencils, snack, and water; confirm travel plans or complete the online system check.

Night before

Get a full night of sleep; avoid all-night review.

Morning of

Eat a normal meal; arrive or log in early per provider instructions; use the restroom; keep review light.

During the test

Read each question fully; write down units; estimate before calculating; flag hard items and return to them.

During the test

Track time in blocks; leave time to transfer or check answers; take breaks only as allowed.

During the test

Use open-book references by index rather than flipping pages; verify unit conversions and economic factors.

Rules to check

  • Bring ID that matches your registration; confirm the exact ID and name-match rules with AEE/provider before exam day.

  • Follow all proctor instructions; unauthorized materials, phones, smart watches, or notes can lead to dismissal - confirm what is allowed.

  • If the exam is open-book, use only approved references; confirm annotation and tabbing rules with the provider.

  • Confirm the break policy in advance; breaks may not stop the clock, and access to materials or the testing room may be restricted.

  • Confirm scoring and the pass mark in advance; if there is no guessing penalty, answer every question rather than leaving blanks.

  • Do not share, copy, or discuss exam content; follow the provider's confidentiality and misconduct rules.

  • For online proctoring, complete the system check and follow room, desk, and camera rules; confirm the technical-support process.

  • If you are unsure about a policy, ask AEE/provider before test day rather than relying on hearsay.

AEE Certified Energy Manager (CEM) FAQ

How many AEE Certified Energy Manager (CEM) practice questions are available?

The practice set has 200 AEE Certified Energy Manager (CEM) questions. Each one includes the choices, the correct answer, and an explanation, and the set is free to read with no signup.

How many AEE Certified Energy Manager (CEM) flashcards are available?

The flashcard set has 32 AEE Certified Energy Manager (CEM) cards. Each card shows the term and its definition.

Which topics does the AEE Certified Energy Manager (CEM) study material cover?

The AEE Certified Energy Manager (CEM) study material has 10 sections, including Codes and Standards, Electrical Power Systems and Motors, and Maintenance and Commissioning.

What format facts does the catalog list for the AEE Certified Energy Manager (CEM) exam?

The catalog lists these item types: multiple choice for the AEE Certified Energy Manager (CEM) exam.